To finish a 2,350 sq.ft. tenant space per approved plans on file. Work to include noncombustible interior nonbearing walls & storefront, rolling grill entry door, second exit rated fire door, accessible restroom, suspended ceiling system, electrical, plumbing & mechanical systems. All per approved plans with notes & attachments. NOTE: This building is fully fire sprinkled with smoke control exhaust system. (P.C.#301-98)/drs
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent occupancy  7/31/1998 PASS
Perm. Occ. Cert. #7334 issued 7-30-98 to Kiddie Kandids at Boise Towne Square.
INSP - Final7/30/19987/30/19987/30/1998 PASS
DetailsJoe Tawney
/ / 406 - REISP OK FOR PERM OCC
INSP-Final Inspection7/30/19987/30/19987/30/1998 FAIL
DetailsJoe Tawney
07/29/98 406 - matt ###-#### reinspection 2329 REINSP FAIL SMOKE DETECTOR FAILED TO SHUT DOWN AHU
INSP-Final Inspection7/27/19987/28/19987/28/1998PNR
DetailsJoe Tawney
07/28/98 406 - Scheduled by Hello!. Contact phone is [3225007]. NOT READY CONTR TRIED TO CANCEL INSPECTION
INSP - Final7/27/19987/28/19987/28/1998PCANC
Details
07/27/98 338 - canc by ctr door does not work
INSP - Final7/24/19987/24/19987/24/1998PFAIL
Details
07/24/98 338 - FIRE LIFE SAFETY AND ETC. MUST RECALLA TER THE FIRE INSP
INSP-Final Inspection7/23/19987/24/19987/24/1998PFAIL
DetailsJoe Tawney
07/24/98 406 - Scheduled by Hello!. Contact phone is [3225007]. FINAL FAIL DOOR HDWRE SMOKE DETECTOR FIRE EXT
INSP - Framing/Rough-in7/9/19987/10/19987/10/1998APART
Details
07/10/98 338 - CFRM-OK CEILING FRAMING
INSP - Wall cover6/30/19987/1/19987/2/1998APART
Details
ALSO DONE BY 342
INSP - Framing/Rough-in6/30/19987/1/19987/1/1998ANR
DetailsWes Worcester
07/01/98 342 - Frank ###-#### postpone to 2 or 3 pm
INSP - Framing/Rough-in7/1/19987/1/19987/1/1998 PASS
DetailsWes Worcester
/ / 342 - 2-3pm
INSP - Wall cover6/29/19986/30/19986/30/1998PPART
Details
06/30/98 338 - MAD EOK FOR THE FIRE CAULKING
INSP - Framing/Rough-in6/29/19986/30/19986/30/1998PPART
Details
06/30/98 338 - PART MADE OK FOR THE FIRE CAULKING
INSP - Wall cover6/25/19986/26/19986/26/1998APART
DetailsCarl Dependahl
scheduled by Hello!. Contact phone is [3225007]. First thing in the morning. per ba....OK TO COVER INT PARTITIONS STILL NEED INSP STORE FRONT PER DETAILS
INSP - Framing/Rough-in6/23/19986/24/19986/24/1998PPART
DetailsCarl Dependahl
06/24/98 340 - Scheduled by Hello!. Contact phone is [3225007]. not complete insp; seal 1 box on demising wall; keep c/n. "secondary wal inside tenant wall ok to cover 1 side only as per elec. insp. still need detail for storefront
INSP - Framing/Rough-in6/23/19986/23/19986/23/1998 FAIL
DetailsCarl Dependahl
/ / 340 - c/n, no elec, need detail for support at store front per pla complete framing...soffits, hard lid, etc. Do not cover.
Plan resubmittals received  6/12/1998
RECEIVED 3 SETS OF REVISED SHEETS ONLY AND ROUTED TO DAN S.
Issue PAID IN FULL permit  6/9/1998
Telephone call  6/8/1998
CALLED JEFF PERMIT READY ###-####
PLANS/APPL TAKEN TO FRONT DESK  6/8/1998 PASS
Approved based on conditions noted to architect.
Inspection Record Card- Bld  6/8/1998
Routing - PLAN CHECK6/8/1998 6/8/1998 PASS
Received plans back from Fire Dept. Processing for issuance - to receive submittals from architect prior to frame inspection approval.
Plan Review Completed(1st rev)  6/8/1998 PASS
held 3 days waiting for F_V, no back-up for plan review
Print Occupancy Form  6/8/1998
Plan assigned to (DRS)5/15/1998 6/8/1998 PASS
DetailsDan Stuart
06/08/98 16:00:48 DRS - this action updated by action script from <<>> in Case No. BLD98-1372
Routing - FIRE6/3/1998 6/8/1998 PASS
concealed spaces behind curved walls - no combustibles or sprinkle
Routing - PLAN CHECK5/29/1998 6/3/1998 PEND
Completed initial plan review. Comments sent by FAX to Loralee Chase & copy mailed. Routing plans to Fire Dept. for review.
Print Pending Permit.LaserJet4  6/3/1998 PEND
Routing to fire dept.
Print Pending Permit.LaserJet4  6/3/1998 PEND
Routing to fire dept.
Plan Reviewer's activity  6/3/1998
Completed plan review. Corrections are required. As an effort to help the issuance of permits move along, the response to the items in question are to be submitted for review and approval prior to the call for framing inspection. This allows the contractor to prepare in areas not in question or to proceed at his own risk until answers are received & approved. This will be pointed out to the contractor verbally and is included in the plan review comments cover letter which is attached as a part of the approved plans plan review. If this is not agreeable to the involved parties the plans will be held.
Routing - PLAN CHECK5/18/1998 5/29/1998 PEND
Picked up plans to beginn review.
Routing - PUBLIC WORKS5/15/1998 5/18/1998 PASS
Plan routing begun/TENANTS  5/15/1998
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
Plan assigned to (MYS)5/14/1998 5/15/1998
DetailsMarlene Southard
Application received  5/14/1998
Recd Pcfee & Taken To Pln CK  5/14/1998 PEND