Case Summary (BLD) | | | 3/11/2014 | | DONE |
|
|
|
|
Fee Review-notes | 9/4/1998 | | 6/20/2001 | | DONE |
|
|
|
11-27--Tim is check ing into it and will gat back with me.....rad
|
BLD-Final | 6/19/2001 | 6/19/2001 | 6/19/2001 | P | PASS |
Carl Dependahl
|
|
|
Final - reinspect; shell ok for l/c 6/19/2001 2:28:49 PM
|
Letter of compliance | | | 6/19/2001 | | DONE |
|
|
|
Letter of Compliance #21544 issued 6-19-01.
|
Print Occupancy Form | | | 6/11/2001 | | DONE |
|
|
|
|
BLD-Final | 6/7/2001 | 6/8/2001 | 6/8/2001 | A | NR |
Carl Dependahl
|
|
|
Final reinspect; Called Tim...bring in all cards. 6/8/2001 2:24:23 PM
|
BLD-Conference | 6/6/2001 | 6/6/2001 | 6/6/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/6/2001 11:10:49 AM rec'd eng's & spec insp's letters
|
Code Occupancy Approval | | | 5/29/2001 | | PASS |
|
|
|
Building inspected o 5/25/2001 and photographs were taken. Today I staffed this with Tempra Wilson and she confirmed that it met DRH97-00195.
|
BLD-Final | 5/25/2001 | 5/25/2001 | 5/25/2001 | A | FAIL |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/25/2001 11:00:33 AM c/n, need eng's / spec. insp's affidavits...
|
BLD-Conference | 4/3/2001 | 4/3/2001 | 4/3/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/3/2001 2:28:27 PM rec'd curtain wall/floor firestop assy from Steve Turney, arch...ok
|
BLD-Conference | 3/15/2001 | 3/15/2001 | 3/15/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/15/2001 9:33:38 AM w/ bldr re set up conf for 3-16...spoke w/ arch & GS...keep c/n
|
BLD-Conference | 3/14/2001 | 3/14/2001 | 3/14/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/14/2001 9:11:33 AM keep c/n, need detail
|
BLD-Conference | 1/24/2001 | 1/24/2001 | 1/24/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 1/24/2001 4:31:26 PM w Dan S re c/n of 1-23...2hr fl/ curtain wall ssy req'd
|
BLD-Framing/Rough-in | 1/22/2001 | 1/23/2001 | 1/23/2001 | A | FAIL |
Carl Dependahl
|
|
|
FR MIKE ###-#### , ok to cover north/west canopy lid. c/n issued re firesafing at fl./ ext wall assy same side...archs detail req'd 1/23/2001 12:06:21 PM
|
BLD-Framing/Rough-in | 12/11/2000 | 12/12/2000 | 12/12/2000 | A | PART |
Carl Dependahl
|
|
|
ext canopy ateast side, ok pending spec insp reports for spray on fp 12/12/2000 11:28:40 AM
|
BLD-Framing/Rough-in | 12/11/2000 | 12/11/2000 | 12/11/2000 | P | CANC |
Jim Storey
|
|
|
Mike Mason ###-#### set up for carl am 12/12/2k 12/11/2000 4:11:57 PM
|
BLD-Conference | 10/3/2000 | 10/4/2000 | 10/4/2000 | A | PART |
Jim Storey
|
|
|
Wants Jim Story to take the inspection per George Slane Mike Mason ###-#### pending resubmital from arch. to address 2 hr. assembly. 10/4/2000 1:37:25 PM
|
BLD-Conference | 9/29/2000 | 10/2/2000 | 10/2/2000 | A | CANC |
Russ Owen
|
|
|
CONF-- MIKE ###-#### I called this number several times and could not make contact 407. 10/2/2000 12:35:42 PM
|
BLD-Footing | 8/1/2000 | 8/2/2000 | 8/2/2000 | A | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/01/2000 at 14:22:07. Contact: .
will call back in special inspector will be on job per foreman 8/2/2000 4:01:02 PM
|
Plan Reviewer's activity | | | 6/28/2000 | | DONE |
|
|
|
RECEIVED REVISED FLOOD PLAIN ELEVATION CERTIFICATE FROM SURVEYOR AND HAD JIM WYLLIE REVIEW AND APPROVE. FORWARDED A COPY OF CERTIFICATION ALONG WITH LETTER FROM SCOTT SPJUTE TO FEMA. mys
|
FIRE-Conference | 3/13/2000 | 3/13/2000 | 3/13/2000 | A | PART |
Rick Jackson
|
|
|
gave general the requirements for the stair signage UBC Standard 10-2
|
SUPER- Supervisor's review | 5/10/1999 | 5/10/1999 | 5/10/1999 | | |
|
|
|
george hicks rep parks on property line issue. still not resolved.
|
INSP - Framing/Rough-in | 5/7/1999 | 5/7/1999 | 5/10/1999 | P | PART |
|
|
|
05/07/99 338 - ok to cover with ele div blessing
|
SUPER- Supervisor's review | 5/5/1999 | 5/5/1999 | 5/5/1999 | | |
|
|
|
all wood -fire retardent treated being incapsulated in parputs with non combustable ok
|
SUPER- Supervisor's review | 4/23/1999 | 4/23/1999 | 4/23/1999 | | |
|
|
|
WE HAVE INFORMED CONTRACTOR THAT PARKS DECISION NEEDS TO BE COMPIED WITH AND CONOPY REMOVED BY MAY 31 99
|
SUPER- Supervisor's review | 4/22/1999 | 4/22/1999 | 4/22/1999 | | |
|
|
|
reviewd correction with tim hogland. parks agreement. we are giving contractor until may 30 to complete agreement with parks or remove canopy.
|
SUPER- Supervisor's review | 4/21/1999 | 4/21/1999 | 4/21/1999 | | |
|
|
|
reviewed correction to Tim Wilcom noting park agreement necessary for front canopy and also temparary standpipe requirements for this 4 story building.
|
INSP - Framing/Rough-in | 4/19/1999 | 4/20/1999 | 4/21/1999 | P | PART |
|
|
|
04/20/99 338 - c/n need stand pipe in progress asap resolve issue with p
|
Telephone call | | | 4/21/1999 | | |
|
|
|
HAD A TELEPHONE CONVERSATION WITH DAVE SELVAGE AT THE CITY PARKS AND RECREATION AND HE INDICATED THAT THE CITY WOULD NOT BE WILLING TO ENTER INTO A SHARED YARD NONBUILD EASEMENT WITH THE ELKS HOSPITAL. HE INDICATED THAT HE DID NOT WANT TO RESTRICT THE CITY'S OPTIONS OR ABILITY TO USE OR DEVELOP THAT PROPERTY AT A FUTURE TIME.
|
SUPER- Supervisor's review | 4/20/1999 | 4/20/1999 | 4/20/1999 | | |
|
|
|
framing in progress needs mec rough.
|
INSP - Framing/Rough-in | 4/16/1999 | 4/19/1999 | 4/19/1999 | P | PART |
|
|
|
04/19/99 338 - madeok for the detail on the paraput ok to spray fire pro
|
INSP-Conference | 4/7/1999 | 4/7/1999 | 4/7/1999 | P | PART |
Rick Jackson
|
|
|
profit meeting
|
INSP - Framing/Rough-in | 3/29/1999 | 3/30/1999 | 3/30/1999 | A | |
|
|
|
###-#### idaho elks rehab
|
(F) Reprint permit | | | 3/23/1999 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 3/8/1999 | | |
|
|
|
GRADING & DRAINAGE MOVED TO THIS PERMIT FROM BLD98-2512. PLANS TO BE MERGED INTO THE SET FOR THIS SHELL PERMIT. SEE NOTE ON VOIDED PERMIT BLD98-2512.
|
INSP - Framing/Rough-in | 12/16/1998 | 12/17/1998 | 12/17/1998 | P | PART |
Wes Worcester
|
|
|
12/17/98 342 - MIKE- CELL ###-#### CALL 1ST-CONF INSP
|
INSP - Foundation | 11/17/1998 | 11/18/1998 | 11/18/1998 | A | PART |
Wes Worcester
|
|
|
11/18/98 342 - MIKE...###-#### cleaning out elevator shaft for cover ea
|
INSP - Foundation | 11/6/1998 | 11/6/1998 | 11/6/1998 | | PART |
Wes Worcester
|
|
|
/ / 342 - special inspector on site
|
INSP - Foundation | 11/5/1998 | 11/6/1998 | 11/6/1998 | A | PART |
Wes Worcester
|
|
|
11/06/98 342 - MIKE ###-#### will do on Mon, special insp
|
INSP - Foundation | 10/14/1998 | 10/15/1998 | 10/15/1998 | A | FAIL |
Wes Worcester
|
|
|
10/15/98 342 - MIKE ###-#### MOBILE ###-#### inadequayte cover at inter
|
INSP - Foundation | 10/9/1998 | 10/9/1998 | 10/12/1998 | P | FAIL |
Wes Worcester
|
|
|
10/09/98 342 - TIM ###-#### poured without special inspection scope of w not pour until log and scope o0n site
|
(F) Reprint permit | | | 9/9/1998 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/8/1998 | | |
|
|
|
|
(F) Reprint permit | | | 9/4/1998 | | |
|
|
|
|
Print Occupancy Form | | | 9/4/1998 | | |
|
|
|
|
Telephone call | | | 9/4/1998 | | PASS |
|
|
|
mike simmons will be in to pick up permit
|
Inspection Record Card- Bld | | | 9/4/1998 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/3/1998 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 9/3/1998 | | PEND |
|
|
|
I HAVE SENT PAUL MARCALINA A LETTER OF UNDERSTANDING AND REQUESTING A COMFIRMATION LETTER. THIS LETTER IS TO CLARIFY THAT THE OUTSTANDING ITEMS ON THIS PROJECT WILL BE RESOLVED BE THOSE ELEMENTS ARE CONSTRUCTED.
|
Plan Reviewer's activity | | | 9/3/1998 | | PASS |
|
|
|
THIS PERMIT IS BEING ISSUED WITH A COUPLE OF OUTSTANDING ITEMS STILL TO BE RESOLVED. 1. IT IS MY UNDERSTANDING THAT THE PROPOSED CANOPY AT THE SOUTH SIDE OF THE BUILDING WILL NOT BE CONSTRUCTED CLOSER THAN 13'-4" TO THE SOUTH PROPERTY LINE WITHOUT PRIOR REVIEW AND APPROVAL. 2. THE STRUCTURAL INTERCONNECTION OF THE PROPOSED FOUNDATION PIERS WILL BE INTALLED IF IT IS DETERMINED, THROUGH AN INTERPRETATION FROM I.C.B.O., THAT THEY ARE REQUIRED. JCM
|
Plan assigned to (JCM) | 5/22/1998 | | 9/3/1998 | | PASS |
John Menard
|
|
|
|
Plan resubmittals received | | | 8/31/1998 | | PEND |
|
|
|
RECEIVED RESUBMITTALS FROM ZGA ARCHITECTS, FORWARDED SAME TO JOHN MENARD.
|
Routing - PLAN CHECK | 8/21/1998 | | 8/24/1998 | | PEND |
|
|
|
|
Routing - FIRE | 8/24/1998 | | 8/24/1998 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 8/20/1998 | | 8/21/1998 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 8/18/1998 | | 8/20/1998 | | PEND |
|
|
|
|
Plan resubmittals received | | | 8/18/1998 | | PEND |
|
|
|
RECEIVED RESUBMITTALS FROM MIKE SIMMONDS 0F ZGA, FORWARDED SAME TO JOHN MENARD.
|
Plan resubmittals received | | | 8/17/1998 | | PEND |
|
|
|
RECEIVED RESUBMITTALS (STRUCTURAL) FORWARDED SAME TO JOHN MENARD.
|
Routing Off Site - STRUCTURAL | 7/17/1998 | | 8/17/1998 | | |
|
|
|
REVISION SHEETS S1.1, S2.1.1, S2.2.1, S2.2.2, S3.1, S3.2 AND ONE COPY OF SUPPLEMENTAL STRUCTURAL CALCS. SENT TO CH2MHILL
|
Routing Off Site - STRUCTURAL | 8/14/1998 | | 8/17/1998 | | |
|
|
|
CONTACTED PDQ TO TAKE RESUBS OUT TO CH2MHILL.
|
Routing - PLANNING | 8/14/1998 | | 8/14/1998 | | PASS |
|
|
|
cup for off-site parking (a condition of approval for the design review) approved in July. Appeal period expired. - M. Hall.
|
Routing - PLANNING | 8/14/1998 | | 8/14/1998 | | PASS |
|
|
|
x-ref. DRH98-0195
|
Routing - PLAN CHECK | 8/4/1998 | | 8/14/1998 | | |
|
|
|
|
Plan resubmittals received | | | 8/13/1998 | | PEND |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM PAUL MARCOLINA OF ZGA ARCHITECTS, FORWORDED SAME TO JOHN MENARD. DAR
|
Plan Review Completed(1st rev) | | | 8/3/1998 | | FAIL |
|
|
|
UBC, UFC, Planning, public works issues
|
Routing - FIRE | 7/31/1998 | | 8/3/1998 | | FAIL |
|
|
|
corrections requested
|
Plan resubmittals requested | | | 7/31/1998 | | PEND |
|
|
|
MAILED PAUL MARCOLINA, AT ZGA ARCHITECTS, A COPY OF THE CORRECTION LIST REQUESTING REVISIONS.
|
Routing - PLAN CHECK | 7/16/1998 | | 7/31/1998 | | PEND |
|
|
|
|
Plan resubmittals received | | | 7/21/1998 | | |
|
|
|
RECEIVED ONE SET OF REVISED SHEETS S1.1, S2.1.1, S2.2.1, S2.2.2, S3.1, S3.2 ROUTED TO JOHN M
|
Telephone call | | | 7/17/1998 | | |
|
|
|
CONTACTED MIKE SIMMONS PER JOHN M. ASKING FOR ANOTHER COPY OF REVISED STRUCTURAL DRAWINGS SHEETS S1.1., S2.1.1, S2.2.1, S2.2.2, S3.1, S3.2 (REVISION NO 1,7-13-98) AND A COPY OF RESPONSE LETTER. KMM
|
Plan resubmittals received | | | 7/17/1998 | | |
|
|
|
RECEIVED 2 COPIES OF STRUCTURAL DRAWINGS S1.1, S2.1.1, S2.2.1, S2.2.2, S3.1, S3.2 (REVISION NO. 1,7-13-98) ROUTED TO JOHN M.
|
Routing - PUBLIC WORKS | 6/30/1998 | | 7/15/1998 | | FAIL |
|
|
|
BRIAN MURPHY AND JOHN JOHNSON FAILED PLANS.
|
Plan resubmittals received | | | 7/13/1998 | | PEND |
|
|
|
RECEIVED RESUBMITTALS FROM ZGA, FORWORDED SAME TO JOHN MENARD
|
Received Certificate of Value | | | 7/13/1998 | | PASS |
|
|
|
RECEIVED REVISED CERT. OF VALUE FOR NEW BUILDING, PROJECT VALUE OF $9,728,600.00. ONE FOR DEMO PROJECT VALUE $52,400.00. ROUTED TO JOHN M.
|
Routing - PLAN CHECK | 6/24/1998 | | 6/30/1998 | | |
|
|
|
|
Plan resubmittals requested | | | 6/24/1998 | | PEND |
|
|
|
FAXED ZGA STRUCTURAL CORRECTION LIST FROM CH2MHILL REQUESTING REVISIONS.
|
Routing - PLUMBING | 6/22/1998 | | 6/24/1998 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 5/22/1998 | | 6/24/1998 | | |
|
|
|
SENT TO CH2M HILL FOR REVIEW.
|
Routing - PLANNING | 6/5/1998 | | 6/22/1998 | | FAIL |
|
|
|
A considerable part of the required parking is being proposed off-site, on a lot to be constructed by and for the Boise Parks Dept. The parking is proposed to be joint use, thus requiring a CUP. I contacted Paul M. at ZGA and advised him. Will attempt to consider the cu application on the July 13 hearing, and will not be able to sign off unless approved and no sooner than 10 days following the decision (unless appealed) - m.hall.
|
Routing - PUBLIC WORKS | 5/22/1998 | | 6/5/1998 | | FAIL |
|
|
|
REVISE GEO THERMAL PLANS. CONTACT JOHN TENSEN FOR OTHER INFORMATION. ###-####. REVISE SEWER REROUT AND SEWER TAP MADE AT MAN HOLE. JOHN JOHNSON REQUIRES 5 MORE COPIES OF THE DRAINAGE PLAN. BRIAN MURPHY.
|
Recd Pcfee & Taken To Pln CK | | | 5/19/1998 | | PASS |
|
|
|
|
Application received | | | 5/19/1998 | | |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 5/19/1998 | | PEND |
|
|
|
|
Received Certificate of Value | | | 5/19/1998 | | |
|
|
|
|