Permit NumberBLD98-01409
StatusFinaled
Name IDAHO ELKS REHABILITATION
Site Address 600 N ROBBINS RD
Project NameIDAHO ELKS HOSPITAL
Customer Number 
ePlanReviewNo
Description
IDAHO ELKS REHABILATION HOSPITAL (SHELL & CORE) * TO BUILD A NEW 149,210 SQ. FT., FOUR STORY, HOSPITAL AND ADMINISTRATION SHELL AND CORE BUILDING. THIS BUILDING WILL BE CONSTRUCTED OF STRUCTURAL STEEL FRAME, CONCRETE SLAB FLOORS, METAL STUD WITH GYPSUM BOARD EXTERIOR WALLS AND METAL ROOF DECK AND CLASS "A" ROOFING SYSTEM. THIS BUILDING IS FULLY FIRE SPRINKLED. THIS IS A SHELL AND CORE PERMIT ONLY. THERE IS NO OCCUPANCY ALLOWED UNDER THIS PERMIT. A SEPARATE TENANT IMPROVEMENT PERMIT IS REQUIRED TO FINISH THIS BUILDING FOR OCCUPANCY. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. DRH97-0195/CUP97-0195/PC#310-98/JCM (NOTE: THIS PERMIT ALSO INCLUDES THE SITE GRADING & DRAINAGE DESCRIBED UNDER BLD98-2512.)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  3/11/2014 DONE
Fee Review-notes9/4/1998 6/20/2001 DONE
11-27--Tim is check ing into it and will gat back with me.....rad
BLD-Final6/19/20016/19/20016/19/2001PPASS
DetailsCarl Dependahl
Final - reinspect; shell ok for l/c 6/19/2001 2:28:49 PM
Letter of compliance  6/19/2001 DONE
Letter of Compliance #21544 issued 6-19-01.
Print Occupancy Form  6/11/2001 DONE
BLD-Final6/7/20016/8/20016/8/2001ANR
DetailsCarl Dependahl
Final reinspect; Called Tim...bring in all cards. 6/8/2001 2:24:23 PM
BLD-Conference6/6/20016/6/20016/6/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 6/6/2001 11:10:49 AM rec'd eng's & spec insp's letters
Code Occupancy Approval  5/29/2001 PASS
Building inspected o 5/25/2001 and photographs were taken. Today I staffed this with Tempra Wilson and she confirmed that it met DRH97-00195.
BLD-Final5/25/20015/25/20015/25/2001AFAIL
DetailsCarl Dependahl
Added by Inspector: 340 On 5/25/2001 11:00:33 AM c/n, need eng's / spec. insp's affidavits...
BLD-Conference4/3/20014/3/20014/3/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 4/3/2001 2:28:27 PM rec'd curtain wall/floor firestop assy from Steve Turney, arch...ok
BLD-Conference3/15/20013/15/20013/15/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 3/15/2001 9:33:38 AM w/ bldr re set up conf for 3-16...spoke w/ arch & GS...keep c/n
BLD-Conference3/14/20013/14/20013/14/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 3/14/2001 9:11:33 AM keep c/n, need detail
BLD-Conference1/24/20011/24/20011/24/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 1/24/2001 4:31:26 PM w Dan S re c/n of 1-23...2hr fl/ curtain wall ssy req'd
BLD-Framing/Rough-in1/22/20011/23/20011/23/2001AFAIL
DetailsCarl Dependahl
FR MIKE ###-#### , ok to cover north/west canopy lid. c/n issued re firesafing at fl./ ext wall assy same side...archs detail req'd 1/23/2001 12:06:21 PM
BLD-Framing/Rough-in12/11/200012/12/200012/12/2000APART
DetailsCarl Dependahl
ext canopy ateast side, ok pending spec insp reports for spray on fp 12/12/2000 11:28:40 AM
BLD-Framing/Rough-in12/11/200012/11/200012/11/2000PCANC
DetailsJim Storey
Mike Mason ###-#### set up for carl am 12/12/2k 12/11/2000 4:11:57 PM
BLD-Conference10/3/200010/4/200010/4/2000APART
DetailsJim Storey
Wants Jim Story to take the inspection per George Slane Mike Mason ###-#### pending resubmital from arch. to address 2 hr. assembly. 10/4/2000 1:37:25 PM
BLD-Conference9/29/200010/2/200010/2/2000ACANC
DetailsRuss Owen
CONF-- MIKE ###-#### I called this number several times and could not make contact 407. 10/2/2000 12:35:42 PM
BLD-Footing8/1/20008/2/20008/2/2000ANR
DetailsTony Young
Scheduled by a contractor via Hello! on 08/01/2000 at 14:22:07. Contact: .
will call back in special inspector will be on job per foreman 8/2/2000 4:01:02 PM
Plan Reviewer's activity  6/28/2000 DONE
RECEIVED REVISED FLOOD PLAIN ELEVATION CERTIFICATE FROM SURVEYOR AND HAD JIM WYLLIE REVIEW AND APPROVE. FORWARDED A COPY OF CERTIFICATION ALONG WITH LETTER FROM SCOTT SPJUTE TO FEMA. mys
FIRE-Conference3/13/20003/13/20003/13/2000APART
DetailsRick Jackson
gave general the requirements for the stair signage UBC Standard 10-2
SUPER- Supervisor's review5/10/19995/10/19995/10/1999
george hicks rep parks on property line issue. still not resolved.
INSP - Framing/Rough-in5/7/19995/7/19995/10/1999PPART
Details
05/07/99 338 - ok to cover with ele div blessing
SUPER- Supervisor's review5/5/19995/5/19995/5/1999
all wood -fire retardent treated being incapsulated in parputs with non combustable ok
SUPER- Supervisor's review4/23/19994/23/19994/23/1999
WE HAVE INFORMED CONTRACTOR THAT PARKS DECISION NEEDS TO BE COMPIED WITH AND CONOPY REMOVED BY MAY 31 99
SUPER- Supervisor's review4/22/19994/22/19994/22/1999
reviewd correction with tim hogland. parks agreement. we are giving contractor until may 30 to complete agreement with parks or remove canopy.
SUPER- Supervisor's review4/21/19994/21/19994/21/1999
reviewed correction to Tim Wilcom noting park agreement necessary for front canopy and also temparary standpipe requirements for this 4 story building.
INSP - Framing/Rough-in4/19/19994/20/19994/21/1999PPART
Details
04/20/99 338 - c/n need stand pipe in progress asap resolve issue with p
Telephone call  4/21/1999
HAD A TELEPHONE CONVERSATION WITH DAVE SELVAGE AT THE CITY PARKS AND RECREATION AND HE INDICATED THAT THE CITY WOULD NOT BE WILLING TO ENTER INTO A SHARED YARD NONBUILD EASEMENT WITH THE ELKS HOSPITAL. HE INDICATED THAT HE DID NOT WANT TO RESTRICT THE CITY'S OPTIONS OR ABILITY TO USE OR DEVELOP THAT PROPERTY AT A FUTURE TIME.
SUPER- Supervisor's review4/20/19994/20/19994/20/1999
framing in progress needs mec rough.
INSP - Framing/Rough-in4/16/19994/19/19994/19/1999PPART
Details
04/19/99 338 - madeok for the detail on the paraput ok to spray fire pro
INSP-Conference4/7/19994/7/19994/7/1999PPART
DetailsRick Jackson
profit meeting
INSP - Framing/Rough-in3/29/19993/30/19993/30/1999A
Details
###-#### idaho elks rehab
(F) Reprint permit  3/23/1999 PASS
Plan Reviewer's activity  3/8/1999
GRADING & DRAINAGE MOVED TO THIS PERMIT FROM BLD98-2512. PLANS TO BE MERGED INTO THE SET FOR THIS SHELL PERMIT. SEE NOTE ON VOIDED PERMIT BLD98-2512.
INSP - Framing/Rough-in12/16/199812/17/199812/17/1998PPART
DetailsWes Worcester
12/17/98 342 - MIKE- CELL ###-#### CALL 1ST-CONF INSP
INSP - Foundation11/17/199811/18/199811/18/1998APART
DetailsWes Worcester
11/18/98 342 - MIKE...###-#### cleaning out elevator shaft for cover ea
INSP - Foundation11/6/199811/6/199811/6/1998 PART
DetailsWes Worcester
/ / 342 - special inspector on site
INSP - Foundation11/5/199811/6/199811/6/1998APART
DetailsWes Worcester
11/06/98 342 - MIKE ###-#### will do on Mon, special insp
INSP - Foundation10/14/199810/15/199810/15/1998AFAIL
DetailsWes Worcester
10/15/98 342 - MIKE ###-#### MOBILE ###-#### inadequayte cover at inter
INSP - Foundation10/9/199810/9/199810/12/1998PFAIL
DetailsWes Worcester
10/09/98 342 - TIM ###-#### poured without special inspection scope of w not pour until log and scope o0n site
(F) Reprint permit  9/9/1998
Issue PAID IN FULL permit  9/8/1998
(F) Reprint permit  9/4/1998
Print Occupancy Form  9/4/1998
Telephone call  9/4/1998 PASS
mike simmons will be in to pick up permit
Inspection Record Card- Bld  9/4/1998
PLANS/APPL TAKEN TO FRONT DESK  9/3/1998 PASS
Plan Reviewer's activity  9/3/1998 PEND
I HAVE SENT PAUL MARCALINA A LETTER OF UNDERSTANDING AND REQUESTING A COMFIRMATION LETTER. THIS LETTER IS TO CLARIFY THAT THE OUTSTANDING ITEMS ON THIS PROJECT WILL BE RESOLVED BE THOSE ELEMENTS ARE CONSTRUCTED.
Plan Reviewer's activity  9/3/1998 PASS
THIS PERMIT IS BEING ISSUED WITH A COUPLE OF OUTSTANDING ITEMS STILL TO BE RESOLVED. 1. IT IS MY UNDERSTANDING THAT THE PROPOSED CANOPY AT THE SOUTH SIDE OF THE BUILDING WILL NOT BE CONSTRUCTED CLOSER THAN 13'-4" TO THE SOUTH PROPERTY LINE WITHOUT PRIOR REVIEW AND APPROVAL. 2. THE STRUCTURAL INTERCONNECTION OF THE PROPOSED FOUNDATION PIERS WILL BE INTALLED IF IT IS DETERMINED, THROUGH AN INTERPRETATION FROM I.C.B.O., THAT THEY ARE REQUIRED. JCM
Plan assigned to (JCM)5/22/1998 9/3/1998 PASS
DetailsJohn Menard
Plan resubmittals received  8/31/1998 PEND
RECEIVED RESUBMITTALS FROM ZGA ARCHITECTS, FORWARDED SAME TO JOHN MENARD.
Routing - PLAN CHECK8/21/1998 8/24/1998 PEND
Routing - FIRE8/24/1998 8/24/1998 PASS
Routing - PUBLIC WORKS8/20/1998 8/21/1998 PASS
Routing - PLAN CHECK8/18/1998 8/20/1998 PEND
Plan resubmittals received  8/18/1998 PEND
RECEIVED RESUBMITTALS FROM MIKE SIMMONDS 0F ZGA, FORWARDED SAME TO JOHN MENARD.
Plan resubmittals received  8/17/1998 PEND
RECEIVED RESUBMITTALS (STRUCTURAL) FORWARDED SAME TO JOHN MENARD.
Routing Off Site - STRUCTURAL7/17/1998 8/17/1998
REVISION SHEETS S1.1, S2.1.1, S2.2.1, S2.2.2, S3.1, S3.2 AND ONE COPY OF SUPPLEMENTAL STRUCTURAL CALCS. SENT TO CH2MHILL
Routing Off Site - STRUCTURAL8/14/1998 8/17/1998
CONTACTED PDQ TO TAKE RESUBS OUT TO CH2MHILL.
Routing - PLANNING8/14/1998 8/14/1998 PASS
cup for off-site parking (a condition of approval for the design review) approved in July. Appeal period expired. - M. Hall.
Routing - PLANNING8/14/1998 8/14/1998 PASS
x-ref. DRH98-0195
Routing - PLAN CHECK8/4/1998 8/14/1998
Plan resubmittals received  8/13/1998 PEND
RECEIVED PLAN RESUBMITTALS FROM PAUL MARCOLINA OF ZGA ARCHITECTS, FORWORDED SAME TO JOHN MENARD. DAR
Plan Review Completed(1st rev)  8/3/1998 FAIL
UBC, UFC, Planning, public works issues
Routing - FIRE7/31/1998 8/3/1998 FAIL
corrections requested
Plan resubmittals requested  7/31/1998 PEND
MAILED PAUL MARCOLINA, AT ZGA ARCHITECTS, A COPY OF THE CORRECTION LIST REQUESTING REVISIONS.
Routing - PLAN CHECK7/16/1998 7/31/1998 PEND
Plan resubmittals received  7/21/1998
RECEIVED ONE SET OF REVISED SHEETS S1.1, S2.1.1, S2.2.1, S2.2.2, S3.1, S3.2 ROUTED TO JOHN M
Telephone call  7/17/1998
CONTACTED MIKE SIMMONS PER JOHN M. ASKING FOR ANOTHER COPY OF REVISED STRUCTURAL DRAWINGS SHEETS S1.1., S2.1.1, S2.2.1, S2.2.2, S3.1, S3.2 (REVISION NO 1,7-13-98) AND A COPY OF RESPONSE LETTER. KMM
Plan resubmittals received  7/17/1998
RECEIVED 2 COPIES OF STRUCTURAL DRAWINGS S1.1, S2.1.1, S2.2.1, S2.2.2, S3.1, S3.2 (REVISION NO. 1,7-13-98) ROUTED TO JOHN M.
Routing - PUBLIC WORKS6/30/1998 7/15/1998 FAIL
BRIAN MURPHY AND JOHN JOHNSON FAILED PLANS.
Plan resubmittals received  7/13/1998 PEND
RECEIVED RESUBMITTALS FROM ZGA, FORWORDED SAME TO JOHN MENARD
Received Certificate of Value  7/13/1998 PASS
RECEIVED REVISED CERT. OF VALUE FOR NEW BUILDING, PROJECT VALUE OF $9,728,600.00. ONE FOR DEMO PROJECT VALUE $52,400.00. ROUTED TO JOHN M.
Routing - PLAN CHECK6/24/1998 6/30/1998
Plan resubmittals requested  6/24/1998 PEND
FAXED ZGA STRUCTURAL CORRECTION LIST FROM CH2MHILL REQUESTING REVISIONS.
Routing - PLUMBING6/22/1998 6/24/1998 PASS
Routing Off Site - STRUCTURAL5/22/1998 6/24/1998
SENT TO CH2M HILL FOR REVIEW.
Routing - PLANNING6/5/1998 6/22/1998 FAIL
A considerable part of the required parking is being proposed off-site, on a lot to be constructed by and for the Boise Parks Dept. The parking is proposed to be joint use, thus requiring a CUP. I contacted Paul M. at ZGA and advised him. Will attempt to consider the cu application on the July 13 hearing, and will not be able to sign off unless approved and no sooner than 10 days following the decision (unless appealed) - m.hall.
Routing - PUBLIC WORKS5/22/1998 6/5/1998 FAIL
REVISE GEO THERMAL PLANS. CONTACT JOHN TENSEN FOR OTHER INFORMATION. ###-####. REVISE SEWER REROUT AND SEWER TAP MADE AT MAN HOLE. JOHN JOHNSON REQUIRES 5 MORE COPIES OF THE DRAINAGE PLAN. BRIAN MURPHY.
Recd Pcfee & Taken To Pln CK  5/19/1998 PASS
Application received  5/19/1998
Plans ACCEPTED BY PLAN CHECK  5/19/1998 PEND
Received Certificate of Value  5/19/1998