Information based on query as of Thursday, September 26, 2024.
Permit Information
Permit NumberBLD98-01416
StatusFinaled
Name ALBERTSON' INC
Site Address 6560 S FEDERAL WAY
Project NameALBERTSONS 184
Customer Number 
ePlanReviewNo
Description
ALBERTSON'S FOOD CENTER #184 * TO CONSTRUCT A NEW 60,013 SQ.FT. RETAIL FOOD CENTER WITH DELI AND BAKERY. THIS IS A SINGLE STORY, CONCRETE MASONRY UNIT, FULLY FIRE SPRINKLERED, TYPE III ONE-HOUR, GROCERY STORE. THE MERCANTILE FLOOR AREA IS APPROXIMATELY 56,104 SQ.FT. 2,177 SQ.FT. IS FOR THE MECHANICAL MEZZANINE AND 1,732 SQ.FT IS FOR THE COVERED ENTRY AREA. THE INSTALLATION OF THE FIRE SPRINKLER SYSTEM IS BEING USED FOR ALLOWABLE AREA INCREASE. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST, CABO/ANSI A117.1 AND THE 1994 EDITION OF THE UBC. PERMIT TO INCLUDE FLAT WORK AROUND THE BUILDING ONLY. DR-19-97 MJP (PC#98-315)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
(F) Reprint permit  3/6/2009 DONE
DetailsAlexandra L. DeYoung
INSP - Wall cover8/31/19998/31/19998/31/1999 PASS
DetailsJim Storey
archived intior finsh report to meet smoke/flame test
SUPER- Supervisor's review7/9/19997/9/19997/9/1999
c-o issued corrections made ok
SUPER- Supervisor's review6/25/19996/25/19996/25/1999
final finish in progress
SUPER- Supervisor's review6/9/19996/9/19996/9/1999
bond posted signoffs in progress should make wed opening
SUPER- Supervisor's review6/8/19996/8/19996/8/1999
5,ooo dollar bond on parking and landscaping required. no reduction allowed. informed scott brown
INSP - Final6/8/19996/8/19996/8/1999PPASS
DetailsJim Storey
06/08/99 301 - final ok
Permanent Occupancy 6/8/19996/8/1999 DONE
Details
Permanent occupancy  6/8/1999 PASS
Perm. Occ. Cert. #7788 issued 6-8-99 to Albertson's.
Code Occupancy Approval  6/8/1999 PASS
ALL CONDITIONS FOR THE BUILDING HAS BEEN MET, I SIGNED OFF FINAL OCCUPANY BUT AM HOLDING A BOND FOR PERMITS BLD98-2396 AND BLD98-2479.
INSP-Final Inspection6/7/19996/7/19996/7/1999AFAIL
DetailsRick Jackson
emergency tested - passed; need balance report for kitchen system; perm address
INSP-Alarm Testing6/3/19996/3/19996/3/1999PPART
DetailsRick Jackson
tested hood extinguishing system - okay; beed balance report
SUPER- Supervisor's review6/2/19996/2/19996/2/1999
structural final still not complete
SUPER- Supervisor's review5/24/19995/24/19995/24/1999
reviewd landscaping plan with scott brown some question about nothern colum line. scott will review with jim story for specifics
INSP - Framing/Rough-in5/21/19995/24/19995/24/1999AFAIL
DetailsJim Storey
05/24/99 301 - c/n isued
Print Occupancy Form  5/24/1999
INSP - Framing/Rough-in5/18/19995/18/19995/18/1999 PASS
DetailsJim Storey
05/18/99 301 - ceilling ok
SUPER- Supervisor's review5/18/19995/18/19995/18/1999
meeting today tim h dave h marlene s george s lee r on fees for owner supplied equipment
INSP-Final Inspection5/17/19995/17/19995/17/1999PFAIL
DetailsRick Jackson
###-#### TRACY//FINAL 1:00-1:30 PLEASE sprinkler alarms okay; tags and signs needed for sprinklers; alarms not complete; kicthen hood not complete; obstructions in sales floor; c/n issued
SUPER- Supervisor's review5/12/19995/12/19995/12/1999
shaft detail to be sumitted to jim storey for 2 hoods
SUPER- Supervisor's review5/10/19995/10/19995/10/1999
clearance for type 1 hood required. inadequate- lacks clearance in bakery area hood.
SUPER- Supervisor's review5/7/19995/7/19995/7/1999
fire caulking of assemblys in progress jim storey has listing sheets ok
INSP - Framing/Rough-in5/5/19995/6/19995/6/1999AFAIL
DetailsJim Storey
05/06/99 301 - fire calk/ Mel ###-####
SUPER- Supervisor's review5/5/19995/5/19995/5/1999
fire dampers to be installed in wall penitrations for duct in rated walls on west end of building by bakery
SUPER- Supervisor's review5/3/19995/3/19995/3/1999
meeting with architect on firestop requirements. we are holding firm on submission of firestopping materials
INSP-Conference5/3/19995/3/19995/3/1999PPART
DetailsRick Jackson
###-#### TRACY//CONFERENCE 1:00 discussed c/n items with designers and general contractor
SUPER- Supervisor's review4/30/19994/30/19994/30/1999
celitex has not submitted method for firestopping of penitrations of fire resistive ceiling
INSP - Framing/Rough-in4/29/19994/30/19994/30/1999APART
DetailsJim Storey
04/30/99 301 - fire ceilling systiem supported corectly./canopy framing
INSP - Framing/Rough-in4/27/19994/28/19994/28/1999APART
DetailsRuss Owen
04/28/99 407 - OK REFREGERATION LINES. FOR FIRE CAULKING RIGHT WALL.
INSP - Framing/Rough-in4/26/19994/27/19994/27/1999AFAIL
DetailsJim Storey
04/27/99 301 - support of rc to grid not complet at front of store and n
SUPER- Supervisor's review4/23/19994/23/19994/23/1999
REVIEWD REQUIRMENTS FIRE DAMPERS WITH DAVE LIGHTFOOT. WE WILL REVIEW MEC ENG INFO AS IT IS RECEIVED.
INSP - Framing/Rough-in4/23/19994/23/19994/23/1999PPART
DetailsJim Storey
04/23/99 301 - ###-#### MEL//SEISMIC BRACING OF GRID CEILING
SUPER- Supervisor's review4/21/19994/21/19994/21/1999
reviewed penitration requirements with cm company superintendent. the tile exceed one pound in weight and penitrations of celitex ceiling will be concidered membrane penitration. celitex will provide method of preventing smoke and heat penitration as per code.
INSP - Framing/Rough-in4/21/19994/21/19994/21/1999PPART
DetailsJim Storey
04/21/99 301 - south c/f up to 4 ok fo cover
INSP - Framing/Rough-in4/19/19994/19/19994/19/1999PPASS
DetailsJim Storey
04/19/99 301 - ###-#### MEL//FIRE CAULKING MEZZANINE ok
INSP-Conference4/16/19994/16/19994/16/1999PPART
DetailsRick Jackson
fire treated plywodd info okay - sprinklers N/R in pharmacy concealed space
INSP - Framing/Rough-in4/13/19994/14/19994/14/1999APASS
DetailsJim Storey
04/14/99 301 - ###-#### mel//fire caulking
Plan resubmittals received  4/14/1999
RECEIVED ONE COPY OF REVISED SHEETS 7.6A AND 7.6B AND ONE COPY OF CONSTRUCTION CHANGE DIRECTIVE. ROUTED TO JIM STOREY. KMM
INSP-Conference4/13/19994/13/19994/13/1999APART
DetailsRick Jackson
left c/n for locating sprinklers under refrigeration lines in mezzanine
Plan resubmittals received  4/13/1999
RECEIVED ONE COPY OF CCD PS A-1,2,3,5,6 ASI 1,2,& 3. ONE COPY OF SKETCH RE 1HR SHAFTS AT RIF. ROUTED TO JIM STOREY. PLANS OR PAPER WORK ARE NOT SIGNED OR STAMPED. I MADE A NOTE OF THIS TO BRING TO JIM'S ATTENTION. ROUTED TO JIM STOREY. KMM
INSP - Framing/Rough-in4/9/19994/12/19994/12/1999APART
DetailsJim Storey
04/12/99 301 - first bay south end of bldg ok for tile.
INSP-Final Inspection4/9/19994/12/19994/12/1999APART
DetailsRick Jackson
###-#### not a final but sprinkler rough-in inspection - okay to cover sales floor area only.
INSP - Framing/Rough-in4/6/19994/7/19994/7/1999PPART
DetailsJim Storey
04/07/99 301 - Mel ###-#### Conference Seismic Pods on ceiling grids app
INSP - Framing/Rough-in4/5/19994/5/19994/5/1999PFAIL
DetailsJim Storey
04/05/99 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP - Framing/Rough-in3/26/19993/26/19993/26/1999 CANC
DetailsRuss Owen
03/26/99 407 - unable to get this today,to many.
INSP - Framing/Rough-in3/26/19993/26/19993/26/1999PCANC
DetailsRuss Owen
###-#### MEL//FRAMING
Fee Review-notes11/9/1998 3/23/1999
Fee Review-notes12/18/1998 3/23/1999
1/18/00-shawn said another month before they have final cert. should be the end of feb.2000 lh
INSP - Framing/Rough-in3/19/19993/22/19993/22/1999APART
DetailsJim Storey
03/22/99 301 - ###-#### MEL//SCREW PATTERN ON DRYWALL back/north and sou
INSP - Framing/Rough-in3/16/19993/17/19993/17/1999PPART
DetailsJim Storey
03/17/99 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED ok to start gy
INSP-Supply line flush3/16/19993/16/19993/16/1999PPASS
DetailsRick Jackson
03/16/99 409 - requested by tracy flush okay
INSP - Framing/Rough-in3/11/19993/12/19993/12/1999AFAIL
DetailsJim Storey
03/12/99 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP-Final Inspection3/12/19993/12/19993/12/1999APART
DetailsRick Jackson
###-#### tracy not a final inspection - underground hydro! pass
INSP - Framing/Rough-in3/8/19993/9/19993/9/1999APART
DetailsJim Storey
03/09/99 301 - MEL CONFERENCE ###-#### WILL BE ON SITE
INSP-Final Inspection3/3/19993/4/19993/4/1999PPART
DetailsRick Jackson
###-#### not a final - underground inspection only - okay to cover. not installed per plans. requested certification on water flow calcs
INSP - Framing/Rough-in3/3/19993/4/19993/4/1999AFAIL
DetailsJim Storey
03/04/99 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP - Framing/Rough-in2/16/19992/17/19992/17/1999APART
DetailsJim Storey
02/17/99 301 - SOUTH WALL JOINTS OK TO ROOF DECK INSIDE ONLY, OUTSIDE OK
INSP - Framing/Rough-in2/16/19992/16/19992/16/1999PFAIL
DetailsJim Storey
02/16/99 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP - Framing/Rough-in2/11/19992/11/19992/11/1999PPART
DetailsJim Storey
02/11/99 301 - north half of building roof deeck welding in progess o
INSP - Foundation2/5/19992/5/19992/5/1999 PASS
DetailsJim Storey
/ / 301 - REVIEWED SPECIAL INSP. REPORTS AND ARCHIVED
Routing - FIRE1/20/1999 1/20/1999 FAIL
Need more information on fire sprinkler plans. Need to revise calculations in Remote area #2, system #2 and resubmit.
INSP - Foundation12/4/199812/7/199812/8/1998APART
DetailsRuss Owen
12/08/98 407 - unable to go by subject to special inspection.
INSP - Foundation11/25/199811/25/199811/25/1998PNR
DetailsJim Storey
11/25/98 301 - mel -cell # ###-#### ft insp
INSP-Conference11/24/199811/24/199811/24/1998APART
DetailsRick Jackson
fire lanes identified on site plans; reviewed plan check comments with general
INSP - Foundation11/23/199811/24/199811/24/1998APART
DetailsJim Storey
11/24/98 301 - had pre-const meeting with job supper/rick fire russ stru
(F) Reprint permit  11/12/1998
Issue PAID IN FULL permit  11/10/1998
Inspection Record Card- Bld  11/9/1998
Print Pending Permit.LaserJet4  11/6/1998 PASS
PLANS/APPL TAKEN TO FRONT DESK  11/6/1998 PASS
Plan Reviewer's activity  11/6/1998 PASS
Plan assigned to (M_P)5/26/1998 11/6/1998 PASS
DetailsMike Phillips
11/06/98 16:36:26 M_P - this action updated by action script from <<>> in Case No. BLD98-1416
Routing Off Site - C.D.H11/3/1998 11/5/1998 PASS
Plan resubmittals received  10/28/1998
RECEIVED ONE COPY OF RESPONSE LETTER PLUS ONE COPY OF ADDITIONAL INFORMATION CONCERNING VENTILATION, AND ONE LETTER COPY OF LETTER ADDRESSED TO TRACY READ. ROUTED TO MIKE PHILLIPS. KMM
Plan resubmittals received  10/23/1998 PEND
RECEIVED TWO COPIES OF ADDENDUM # 1 10/23/98, FORWARDED SAME TO MIKE PHILLIPS.
Plan resubmittals received  10/15/1998
RECEIVED TWO COPIES OF REVISED SHEET 3.7A ROUTED TO MIKE P.
Plan Reviewer's activity  10/12/1998 FAIL
Requested additional information on 3 items. Called andtalked to Architect. Routing back to Planning for approval. Need CDH approvals.
Routing - PLANNING10/12/1998 10/12/1998 PASS
approved per DRH97-0019.
Plan resubmittals requested  10/12/1998 FAIL
Requested additional information to be submitted. Called and talked to Architect.
Routing - PLAN CHECK8/13/1998 10/12/1998
Plan resubmittals received  10/6/1998
RECEIVED TWO COPIES OF REVISED PLANS AND ONE COPY OF PLAN REVIEW COMMENTS TWO COPIES OF SUPPLEMENTAL CALC. AND TWO PROJECT MANUALS. ROUTED TO MIKE P.
Plan resubmittals received  8/19/1998 PEND
RECEIVED ACHD ACCEPTANCE LETTER FROM PETERSEN-STAGGS FORWARDED SAME TO FRONT DESK, PLAN CHECK FILES AND MIKE PHILLIPS. DAR
Routing - FIRE8/5/1998 8/12/1998 PASS
Telephone call  8/7/1998
Requested opening protection at west end of canopy because distance to property line is at six feet. Missed this on the original plan review.
Routing - PLAN CHECK7/22/1998 8/5/1998
Plan resubmittals requested  8/4/1998 FAIL
REQUESTED ADDITIONAL INFORMATION TO BE SUBMITTED.
Print Pending Permit.LaserJet4  8/4/1998 FAIL
REQUESTED ADDITIONAL INFORMATION TO BE SUBMITTED FOR FURTHER REVIEW.
Plan resubmittals received  7/29/1998
Received site plan for review.
Routing - PLUMBING7/15/1998 7/21/1998 PASS
Routing - PUBLIC WORKS7/8/1998 7/15/1998 PASS
Routing - PLANNING7/1/1998 7/7/1998 FAIL
approval is pending subdivision recordation.
Routing Off Site - C.D.H5/27/1998 7/1/1998 FAIL
CALLED SCOTT EDENS, ALBERTSON'S, TO TAKE PLANS TO CDH. DAR PER MIKE P. WILL ROUTE TO P&Z THEN TO PW WHEN CDH SIGNS OFF
Routing Off Site - STRUCTURAL5/27/1998 6/2/1998
SENT PLANS TO ATWOOD, HINZMAN, JONES FOLLOW UP REVIEW WILL BE DONE BY PLAN REVIEWER. MJP Plan review complete.
Plan assigned to (MYS)5/19/1998 5/21/1998
DetailsMarlene Southard
Application received  5/21/1998 PEND
RECEIVED PLANS AND BEGAN PROCESSING.
Recd Pcfee & Taken To Pln CK  5/19/1998 PEND
Application received  5/19/1998
SUPER- Supervisor's review4/22/1999