INSP-Final Inspection | 4/21/1999 | 4/21/1999 | 4/21/1999 | P | FAIL |
Joe Tawney
|
|
|
04/21/99 406 - REINSP FAIL THUMB TURNS ON 2 DOORS
|
INSP-Conference | 4/5/1999 | 4/5/1999 | 4/5/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - CONF W/CONTR REG OPEN C/N
|
INSP-Conference | 4/5/1999 | 4/5/1999 | 4/5/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - CONF W/CONTR REG OPEN C/N
|
Fee Review-notes | 12/18/1998 | | 3/28/1999 | | WASH |
|
|
|
|
INSP - Framing/Rough-in | 10/7/1998 | 10/7/1998 | 10/7/1998 | P | PART |
|
|
|
10/07/98 338 - MADE OK TO COVER FOR PHASE 2
|
INSP-Final Inspection | 9/21/1998 | 9/22/1998 | 9/22/1998 | A | FAIL |
Joe Tawney
|
|
|
09/22/98 406 - paul ###-#### partial occupancy PARTIAL FINAL FAIL EMERG LIGHTS EXIT SIGN REMOVE THUMB TURNS INSTALL DOO
|
INSP - Framing/Rough-in | 9/15/1998 | 9/16/1998 | 9/16/1998 | P | FAIL |
Carl Dependahl
|
|
|
paul ###-####...need draft stops at attic; ok to continue, phased project.338 area.
|
INSP - Framing/Rough-in | 8/20/1998 | 8/20/1998 | 8/20/1998 | P | |
|
|
|
ceiling paul ###-####
|
INSP - Framing/Rough-in | 7/27/1998 | 7/28/1998 | 7/28/1998 | A | PART |
|
|
|
07/27/98 338 - ok to cover the center/phase 1
|
Telephone call | | | 7/20/1998 | | PASS |
|
|
|
###-#### LEFT MESSAGE FOR GORRINGE BROTHERS CONST.
|
Inspection Record Card- Bld | | | 7/20/1998 | | |
|
|
|
|
Print Occupancy Form | | | 7/20/1998 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/20/1998 | | |
|
|
|
|
Plan assigned to (JML) | 6/10/1998 | | 7/17/1998 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 7/17/1998 | | PASS |
|
|
|
all approved
|
Routing - PLAN CHECK | 7/17/1998 | | 7/17/1998 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 7/17/1998 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/17/1998 | | PASS |
|
|
|
|
Routing - FIRE | 7/9/1998 | | 7/17/1998 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 7/9/1998 | | 7/9/1998 | | PEND |
|
|
|
approved pending Fire review
|
Plan resubmittals received | | | 7/7/1998 | | PEND |
|
|
|
RECEIVED RESUBMITTALS FROM KYLE FREUTE OF BRS, 2 COPIES OF PAGES A-1, A-2 AND A-3. FORWARDED SAME TO JOHN LEVIEN.
|
Telephone call | | | 6/24/1998 | | FAIL |
|
|
|
I discussed with Kyle of BRS the building being over area . He said he would check into available yards. We discussed the purpose of the three tenant demising walls with only one tenant. He said it was to avoid having to make rated corridors. I told him that the occupancy load that the corridor had only needs to come from the areas required to exit through the corridor and that the rating of the corridors or the need for tenant demising walls would probably not be required. He said he would reevaluate his plan and propose an alternative.
|
Routing - PLAN CHECK | 6/1/1998 | | 6/24/1998 | | FAIL |
|
|
|
see telephone call memo dated 6/24
|
Plan assigned to (R_H) | 6/2/1998 | | 6/10/1998 | | PEND |
|
|
|
TRANSFERRED TO JOHN LEVIEN
|
Plan assigned to (MYS) | 5/22/1998 | | 6/2/1998 | | |
Marlene Southard
|
|
|
|
Plan routing begun/TENANTS | | | 6/2/1998 | | |
|
|
|
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
|
Routing - PLAN CHECK | 5/22/1998 | | 5/29/1998 | | |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 5/29/1998 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 5/29/1998 | | 5/29/1998 | | PASS |
|
|
|
|
Plan routing begun/TENANTS | | | 5/29/1998 | | |
|
|
|
|
Application received | | | 5/22/1998 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/22/1998 | | PEND |
|
|
|
|
Received Certificate of Value | | | 5/22/1998 | | PASS |
|
|
|
|