Case Summary (BLD) | | | 3/25/2010 | | |
|
|
|
|
Fee Review-notes | 8/31/1998 | | 4/19/1999 | | |
|
|
|
|
Permanent occupancy | | | 4/14/1999 | | PASS |
|
|
|
Perm. Occ. Cert. #7739 issued 4-13-99 to All Pro Floors.
|
INSP - Final | 4/13/1999 | 4/13/1999 | 4/13/1999 | | PASS |
|
|
|
madeok other agencies ok
|
Permanent Occupancy | | 4/13/1999 | 4/13/1999 | | DONE |
|
|
|
|
INSP - Final | 4/9/1999 | 4/9/1999 | 4/9/1999 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR PERM OCC
|
INSP-Conference | 4/1/1999 | 4/1/1999 | 4/1/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - CONF W/DAVE TUCKER REG SIGN OFF OF PERMIT
|
Temporary occupancy | | | 12/22/1998 | | PASS |
|
|
|
Temp. Occ. Cert. #3761 issued 12-22-98 to All Pro Floors, Inc.
|
INSP - Final | 12/21/1998 | 12/21/1998 | 12/21/1998 | | PART |
|
|
|
12/21/98 338 - signed the temp col of the occ req card, need shell final
|
INSP - Final | 12/18/1998 | 12/18/1998 | 12/18/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR TEMP OCC CONTROL VLV SUPR, ACCELERATOR
|
INSP-Final Inspection | 12/17/1998 | 12/17/1998 | 12/17/1998 | P | FAIL |
Joe Tawney
|
|
|
12/17/98 406 - dwayne- ###-#### re-insp fire fn REINSP FAIL ACCEL FAILED DUCT DET CONTROL VLV MONITORING
|
INSP-Final Inspection | 12/4/1998 | 12/7/1998 | 12/7/1998 | P | FAIL |
Joe Tawney
|
|
|
12/07/98 406 - dwayne ###-#### fn fire insp at 1 per joe REINSP FAIL SPKLR SYSTEM DUCT DET ALARM SYSTEM
|
INSP - Final | 12/2/1998 | 12/4/1998 | 12/4/1998 | A | CANC |
Carl Dependahl
|
|
|
DAVE ###-####
|
INSP-Final Inspection | 12/2/1998 | 12/3/1998 | 12/3/1998 | P | FAIL |
Joe Tawney
|
|
|
12/03/98 406 - dave ###-#### FINAL FAIL ALARM SYSTEM, SPKLR SYSTEM, EMERG LIGHTS, FIRE EXT, DOOR HDWR ì
|
INSP-Conference | 11/13/1998 | 11/13/1998 | 11/13/1998 | A | CONF |
Mike Kinnear
|
|
|
FS Contractor reviewed what was to be finished, when and what is still pending (off site monitoring thru USWest phone line backlog delay). Expected any day. Wanted to know if it would hold up a Temp. Occ.? I indicated it probably would, but would be reviewed when asked for.
|
INSP - Framing/Rough-in | 11/9/1998 | 11/10/1998 | 11/12/1998 | A | PART |
|
|
|
11/10/98 338 - made ok to drop in the ceiling tiles.
|
INSP - Framing/Rough-in | 10/12/1998 | 10/13/1998 | 10/14/1998 | A | PART |
|
|
|
10/15/98 338 - made ok to cover with 350 approval
|
INSP - Framing/Rough-in | 10/6/1998 | 10/7/1998 | 10/7/1998 | P | PART |
|
|
|
10/07/98 338 - ok to cover
|
INSP - Framing/Rough-in | 10/2/1998 | 10/2/1998 | 10/2/1998 | | PART |
|
|
|
10/02/98 338 - THIS IS A CONFERENCE TO CHECK OUT THE STAIR REPAIR AND LI
|
INSP - Framing/Rough-in | 9/30/1998 | 10/2/1998 | 10/2/1998 | A | PART |
|
|
|
10/05/98 338 - conference made ok stair repair going well
|
INSP-Conference | 9/28/1998 | 9/29/1998 | 9/29/1998 | A | NR |
|
|
|
09/29/98 338 - not ready for insp conf will have plans reviewers on site
|
Issue PAID IN FULL permit | | | 8/4/1998 | | |
|
|
|
|
Telephone call | | | 7/16/1998 | | |
|
|
|
CALLED LEFT MESSAGE ON DAVE TUCKERS MACHINE ###-####
|
Routing - PLAN CHECK | 6/23/1998 | | 6/23/1998 | | PASS |
|
|
|
|
Print Occupancy Form | | | 6/23/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/23/1998 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/23/1998 | | PASS |
|
|
|
|
Telephone call | | | 6/23/1998 | | |
|
|
|
CALLED DAVE TUCKER AT ###-#### PERMIT READY
|
Plan assigned to (ADS) | 6/3/1998 | | 6/23/1998 | | PASS |
|
|
|
|
Plan resubmittals received | | | 6/22/1998 | | PEND |
|
|
|
RECEIVED RESUBS FROM CORNELL LARSON, FORWARDED SAME TO ARLAN SMITH
|
Routing - FIRE | 6/22/1998 | | 6/22/1998 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 6/15/1998 | | 6/22/1998 | | |
|
|
|
pending fire dept. approval.
|
Plan Review Completed(1st rev) | | | 6/14/1998 | | FAIL |
|
|
|
UBC & UFC issues
|
Routing - FIRE | 6/11/1998 | | 6/14/1998 | | FAIL |
|
|
|
storage? rated corridor? elevator recall?
|
Plan Reviewer's activity | | | 6/11/1998 | | FAIL |
|
|
|
mailed & faxed letter to architect. Resubmittal did not resolve all the required corrections.
|
Plan resubmittals received | | | 6/10/1998 | | |
|
|
|
RECEIVED ONE COPY OF ELEVATOR REQUIREMENTS FOR ALL PRO FLOOR T.I. SPACE LETTER AND 2 COPIES OF REVISED SHEETS A-2, A-3, A-4. ROUTED TO ARLAN SMITH. KMM
|
Plan resubmittals requested | | | 6/5/1998 | | FAIL |
|
|
|
Correction report faxed & mailed to architect
|
Routing - PLAN CHECK | 6/1/1998 | | 6/5/1998 | | FAIL |
|
|
|
|
Plan assigned to (MYS) | 5/27/1998 | | 6/3/1998 | | |
Marlene Southard
|
|
|
|
Plan routing begun/TENANTS | | | 6/3/1998 | | |
|
|
|
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
|
Plan routing begun/TENANTS | | | 6/1/1998 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 6/1/1998 | | 6/1/1998 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 6/1/1998 | | PASS |
|
|
|
|
Application received | | | 5/27/1998 | | |
|
|
|
|
Received Certificate of Value | | | 5/27/1998 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/27/1998 | | PEND |
|
|
|
|