Permanent occupancy | | | 11/22/1999 | | DONE |
|
|
|
Perm. Occ. Cert. #8023 issued 11-22-99 to Albertson's Bench Plaza for basement offices.
|
Permanent Occupancy | | 11/18/1999 | 11/18/1999 | | DONE |
|
|
|
|
BLD-Final | 11/17/1999 | 11/18/1999 | 11/18/1999 | A | PASS |
Jim Storey
|
|
|
Final - basement area for Albertson's Bench Plaza
|
Temporary occupancy | | | 10/29/1999 | | DONE |
|
|
|
|
INSP-Final Inspection | 8/13/1999 | 8/13/1999 | 8/13/1999 | A | PASS |
Rick Jackson
|
|
|
occ approved
|
INSP - Foundation | 7/26/1999 | 7/26/1999 | 7/26/1999 | | |
|
|
|
relocation of enclosier ok
|
SUPER- Supervisor's review | 7/13/1999 | 7/13/1999 | 7/13/1999 | | |
|
|
|
relocation of generator approved by zoning. needed for occ
|
SUPER- Supervisor's review | 7/8/1999 | 7/8/1999 | 7/8/1999 | | |
|
|
|
still in progress generator dr in progress
|
SUPER- Supervisor's review | 6/25/1999 | 6/25/1999 | 6/25/1999 | | |
|
|
|
generator issuse still not solved storey is handling occupancy
|
SUPER- Supervisor's review | 6/10/1999 | 6/10/1999 | 6/10/1999 | | |
|
|
|
no word from jim storey on generator change. also t-o issued and can't find sign offs will check with jim storey
|
INSP - Framing/Rough-in | 5/14/1999 | 5/14/1999 | 5/14/1999 | P | PART |
Jim Storey
|
|
|
05/14/99 301 - ok for cover
|
SUPER- Supervisor's review | 4/28/1999 | 4/28/1999 | 4/28/1999 | | |
|
|
|
moving generator to southern area of project in p and z for approval
|
SUPER- Supervisor's review | 4/5/1999 | 4/5/1999 | 4/5/1999 | | |
|
|
|
problem with fireprotection of beam need to submit listed system used to fireprotect at wall penitration.
|
SUPER- Supervisor's review | 3/31/1999 | 3/31/1999 | 3/31/1999 | | |
|
|
|
still no word on generator location.
|
Fee Review-notes | 12/18/1998 | | 3/31/1999 | | |
|
|
|
|
Temporary occupancy | | | 3/22/1999 | | PASS |
|
|
|
Temp. Occ. Cert. #3799 issued 3-22-99 to Albertson's for basement ofc.
|
INSP - Final | 3/19/1999 | 3/19/1999 | 3/19/1999 | P | PART |
Rick Jackson
|
|
|
/ / 409 - OCCUPANT LOAD SIGN
|
SUPER- Supervisor's review | 3/4/1999 | 3/4/1999 | 3/4/1999 | | |
|
|
|
truss penitrating fire wall requires fire protection to maintain rating through the wall.
|
SUPER- Supervisor's review | 3/1/1999 | 3/1/1999 | 3/1/1999 | | |
|
|
|
still no word on generator screen and location. across from dwellings. jim storey is handling
|
INSP-Final Inspection | 2/19/1999 | 2/19/1999 | 2/19/1999 | P | PART |
Rick Jackson
|
|
|
temp occ okay
|
INSP-Final Inspection | 2/18/1999 | 2/18/1999 | 2/18/1999 | P | NR |
Rick Jackson
|
|
|
alarms/dampers not ready
|
INSP-Final Inspection | 2/16/1999 | 2/16/1999 | 2/16/1999 | P | FAIL |
Rick Jackson
|
|
|
recall for elevator on general alarms; alarms not complete; penetration in basement
|
INSP-Conference | 2/10/1999 | 2/10/1999 | 2/10/1999 | A | PART |
Rick Jackson
|
|
|
with electrical contractor and problems with detectors in main lobby and basement comm room
|
INSP-Final Inspection | 2/8/1999 | 2/9/1999 | 2/10/1999 | P | FAIL |
Rick Jackson
|
|
|
02/09/99 409 - ###-#### DENNIS\\BASEMENT test alarms; sprinkler head in mens room; test sprinkler alarms; etc
|
INSP - Final | 1/28/1999 | 1/29/1999 | 2/1/1999 | P | NR |
Jim Storey
|
|
|
01/29/99 301 - NR
|
INSP-Final Inspection | 1/28/1999 | 1/29/1999 | 1/29/1999 | P | FAIL |
Rick Jackson
|
|
|
DENNIS- ###-#### 1ST FLOOR BASEMENT-FN FIRE alarms not complete
|
SUPER- Supervisor's review | 1/27/1999 | 1/27/1999 | 1/27/1999 | | |
|
|
|
planning has not completed ruling on generator still non compliant
|
INSP - Framing/Rough-in | 1/19/1999 | 1/20/1999 | 1/20/1999 | A | FAIL |
Rick Jackson
|
|
|
01/20/99 409 - JENNIFER ###-#### call was for final - alarms not complete; sprinklers not complete;stair
|
SUPER- Supervisor's review | 12/29/1998 | 12/29/1998 | 12/29/1998 | | |
|
|
|
finish on first floor proceeding. still no approval for generator on street by residential homes.
|
SUPER- Supervisor's review | 12/22/1998 | 12/21/1998 | 12/21/1998 | | |
|
|
|
plans submitted for interior finish ok to proceed inside. generator pad still non compliant no occupancy until cu and dr are completed.
|
SUPER- Supervisor's review | 12/18/1998 | 12/18/1998 | 12/18/1998 | | |
|
|
|
plans submitted mike and floyd reviewing- stop work still in effect until permit is issued. contractor is observing stop work. ok
|
INSP - Framing/Rough-in | 12/2/1998 | 12/2/1998 | 12/3/1998 | P | PASS |
Jim Storey
|
|
|
12/02/98 301 - fire stopping basment top of walls to b deck ok
|
Plan resubmittals received | | | 12/1/1998 | | |
|
|
|
RECEIVED TWO COPIES OF REVISED PLANS FOR THE FIRST FLOOR T.I. ROUTED TO JIM STORY. KMM
|
INSP - Framing/Rough-in | 9/22/1998 | 9/23/1998 | 9/23/1998 | P | PASS |
Jim Storey
|
|
|
09/23/98 301 - dennis ###-####-steel set fr in basement FRAM-OK FRAMING basement walls ok for cover
|
Issue PAID IN FULL permit | | | 6/22/1998 | | |
|
|
|
|
Telephone call | | | 6/22/1998 | | |
|
|
|
CALLED MARK LEFT MESSAGE PERMIT READY
|
Inspection Record Card- Bld | | | 6/22/1998 | | |
|
|
|
|
Print Occupancy Form | | | 6/22/1998 | | |
|
|
|
|
Telephone call | | | 6/22/1998 | | |
|
|
|
CALLED MCALVAIN PERMIT READY
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/19/1998 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 6/19/1998 | | 6/19/1998 | | PASS |
|
|
|
|
Plan assigned to (ADS) | 6/5/1998 | | 6/19/1998 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 6/18/1998 | | FAIL |
|
|
|
UBC corrections required.
|
Routing - FIRE | 6/12/1998 | | 6/18/1998 | | PASS |
|
|
|
need alarm plans
|
Issue & PRINT FEE-DUE permit | | | 6/15/1998 | | PART |
|
|
|
partial permit
|
Inspection Record Card- Bld | | | 6/15/1998 | | |
|
|
|
|
Plan Reviewer's activity | | | 6/15/1998 | | |
|
|
|
A WRITTEN REQUEST FOR A PARTIAL PERMIT IN ACCORDANCE WITH RESOLUTION #13535 WAS MADE BY TED ISBELL (HOSFORD, LARSON, RUDEEN). PER THE REQUEST A PARTIAL PERMIT WAS ISSUED ON 6/15/98.
|
Plan resubmittals received | | | 6/12/1998 | | |
|
|
|
RECEIVED 2 COPIES OF SHEETS A1 BASEMENT PLAN. 1 COPY OF WRITTEN RESPONSE TO PLAN REVIEW. ROUTED TO ARLAN
|
Plan resubmittals requested | | | 6/11/1998 | | FAIL |
|
|
|
faxed correction list to architect.
|
Routing - PLAN CHECK | 6/8/1998 | | 6/11/1998 | | FAIL |
|
|
|
faxed correction list to architect
|
Routing - PUBLIC WORKS | 6/8/1998 | | 6/8/1998 | | PASS |
|
|
|
|
Plan assigned to (MYS) | 6/4/1998 | | 6/5/1998 | | |
Marlene Southard
|
|
|
|
Plan routing begun/TENANTS | | | 6/5/1998 | | |
|
|
|
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
|
Plans ACCEPTED BY PLAN CHECK | | | 6/4/1998 | | PASS |
|
|
|
|
Received Certificate of Value | | | 6/2/1998 | | PASS |
|
|
|
|
Application received | | | 6/2/1998 | | |
|
|
|
|