Fee Review-notes | 3/15/2000 | 3/15/2000 | 3/15/2000 | | DONE |
|
|
|
|
Receive PAYMENT IN FULL | | | 10/5/1999 | | DONE |
|
|
|
|
(F) Reprint permit | | | 8/26/1999 | | |
|
|
|
|
(F) Reprint permit | | | 8/25/1999 | | |
|
|
|
|
(F) Reprint permit | | | 8/25/1999 | | |
|
|
|
|
Letter of compliance | | | 7/1/1999 | | PASS |
|
|
|
Letter of Compliance #16612 issued 7-1-99.
|
INSP - Final | 6/25/1999 | 6/25/1999 | 6/25/1999 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR CERT OF COMPLETION
|
INSP - Final | 6/25/1999 | 6/25/1999 | 6/25/1999 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - SHELL BLDG
|
INSP-Final Inspection | 6/22/1999 | 6/23/1999 | 6/23/1999 | P | FAIL |
Joe Tawney
|
|
|
06/23/99 406 - REINSP FAIL NFPA 72 FORM
|
INSP - Final | 6/22/1999 | 6/23/1999 | 6/23/1999 | P | FAIL |
Carl Dependahl
|
|
|
06/23/99 340 - Scheduled by Hello!. Contact phone is [8677613].
|
INSP - Final | 6/11/1999 | 6/11/1999 | 6/11/1999 | A | PART |
Carl Dependahl
|
|
|
06/11/99 340 - c/n, eng's letter, etc, ok for t/o...sign at office pleas
|
INSP-Final Inspection | 6/11/1999 | 6/11/1999 | 6/11/1999 | A | PART |
Joe Tawney
|
|
|
06/11/99 406 - REINSP OK FOR TEMP OCC BARRICADES, NFPA 72
|
INSP-Final Inspection | 6/9/1999 | 6/10/1999 | 6/10/1999 | A | FAIL |
Joe Tawney
|
|
|
06/10/99 406 - REINSP SHELL FAIL SPKLR SPACING, GAS METER BARRICADE, ROT
|
INSP-Sprinkler Rough-in/Hydro | 6/7/1999 | 6/7/1999 | 6/7/1999 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - ROUGH IN FAIL HYDRO FDC FAIL
|
INSP-Sprinkler Rough-in/Hydro | 6/4/1999 | 6/4/1999 | 6/4/1999 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - FDC PIPING DID NOT HOLD PRESSURE
|
INSP-Final Inspection | 6/1/1999 | 6/2/1999 | 6/2/1999 | A | FAIL |
Joe Tawney
|
|
|
06/02/99 406 - FINAL SHELL FAIL HYDRO TESTS, SPKLR R I, ALARM TEST
|
Code Occupancy Approval | | | 6/2/1999 | | PASS |
|
|
|
ALL CONDITIONS FOR PHASE 1 COMPLETE PER DRH98-0046, FINAL SIGNED OFF AS PLANTERS IN MIDDLE PARKING LOT OKED BY TEMPERA.
|
INSP-Supply line flush | 5/19/1999 | 5/19/1999 | 5/19/1999 | P | PASS |
Rick Jackson
|
|
|
underground flush okay
|
Code Occupancy Approval | | | 3/30/1999 | | |
|
|
|
final requested by Pat Childs ###-####
|
Fee Review-notes | 11/4/1998 | | 1/28/1999 | | |
|
|
|
|
INSP - Framing/Rough-in | 10/7/1998 | 10/7/1998 | 10/9/1998 | P | PART |
|
|
|
10/07/98 338 - made ok to pour with sp insp approvaal tilt up wall panel
|
INSP - Wall cover | 10/2/1998 | 10/2/1998 | 10/2/1998 | P | PART |
|
|
|
10/05/98 338 - madeok to cover
|
INSP - Foundation | 9/24/1998 | 9/25/1998 | 9/25/1998 | A | PART |
|
|
|
09/25/98 338 - made ok to pour with sp insp approval
|
(F) Reprint permit | | | 8/31/1998 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/28/1998 | | |
|
|
|
|
Telephone call | | | 8/27/1998 | | |
|
|
|
CALLED PAT PERMIT READY
|
Print Occupancy Form | | | 8/25/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/25/1998 | | |
|
|
|
|
Plan assigned to (JCM) | 6/11/1998 | | 8/24/1998 | | PASS |
John Menard
|
|
|
|
Plan resubmittals received | | | 8/24/1998 | | PEND |
|
|
|
RECEIVED RESUBMITTALS FROM ASE, FORWARDED SAME TO JOHN MENARD
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/24/1998 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 8/13/1998 | | 8/24/1998 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 8/17/1998 | | 8/19/1998 | | |
|
|
|
RESUBS SENT TO ATWOOD HINZMAN AND JONES RECEIVED CORRECTION LIST FROM ATWOOD-HNIZMAN-JONES - DAVID HAUGLAND INDICATED THAT FINAL REQUIRED RESUBMITTALS COULD BE REVIEWED BY THE CITY.
|
Plan resubmittals requested | | | 8/18/1998 | | PEND |
|
|
|
FAXED GORDON MCDONALD A COPY OF THE REVIEW COMMENTS,FROM ATWOOD-HINZMAN-JONES ON THE SECOND ROUND OF RESUBMITTAL, REQUESTING ADDITIONAL INFORMATION AND STRUCTURAL PLAN REVISIONS.
|
Plan resubmittals received | | | 8/17/1998 | | |
|
|
|
RESUBS FOR STRUCT. RECEIVED AND SENT TO ATWOOD
|
Routing - PLUMBING | 8/13/1998 | | 8/13/1998 | | PASS |
|
|
|
|
Routing - PLANNING | 8/4/1998 | | 8/12/1998 | | PASS |
|
|
|
x-ref.drh98-0046
|
Plan resubmittals requested | | | 8/12/1998 | | PEND |
|
|
|
FAXED GORDON MCDONALD A COPY OF THE CORRECTION LIST FROM ATWOOD-HINZMAN-JONES REQUESTING REVISIONS ON THE RESUBMITTED STRUCTURAL REVISIONS.
|
Routing Off Site - STRUCTURAL | 8/7/1998 | | 8/11/1998 | | PEND |
|
|
|
SENT RESUBS TO ATWOOD, HINZMAN, JONES
|
Plan resubmittals received | | | 8/5/1998 | | PEND |
|
|
|
RECEIVED RESUBMITTALS FROM STEED CONSTRUCTION DRAWN BY KEITH JACOBS OF PACIFIC LAND SURVEYORS. FORWARDED SAME TO JOHN MENARD.
|
Plan resubmittals received | | | 8/5/1998 | | |
|
|
|
RECEIVED 2 COPIES OF REVISED SHEETS A0, A1, A1.1, A2, A4, A5, A6, A7, L1, S0.0, S1.0, S1.1, S1.2, S2.0S2.1, S2.2, S3.0, S3.1, S3.2, S3.3, S4.0, S5.0, AND TWO COPIES OF RESPONES TO STRUCT. REVIEW. ROUTED TO JOHN M.
|
Plan resubmittals received | | | 8/4/1998 | | |
|
|
|
RECEIVED REVISED CIVIL SHEETS 1 THRU 5.
|
Routing - PLUMBING | 7/30/1998 | | 8/3/1998 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 7/23/1998 | | 7/30/1998 | | PEND |
|
|
|
|
Plan resubmittals received | | | 7/29/1998 | | |
|
|
|
RECEIVED 2 COPIES OF CIVIL SHEETS 1 THRU 5. ROUTED TO JOHN M
|
Routing - FIRE | 7/20/1998 | | 7/22/1998 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 7/22/1998 | | FAIL |
|
|
|
structural, plumbing and PW issues
|
Routing - PLAN CHECK | 7/13/1998 | | 7/20/1998 | | PEND |
|
|
|
|
Plan Reviewer's activity | | | 7/17/1998 | | PASS |
|
|
|
PLANS REVIEWED AND APPROVED AS SUBMITTED.
|
Routing - PLUMBING | 7/9/1998 | | 7/13/1998 | | FAIL |
|
|
|
|
Routing - PUBLIC WORKS | 6/30/1998 | | 7/8/1998 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 7/6/1998 | | PASS |
|
|
|
SEE ACTION 007 PEND
|
Plan resubmittals requested | | | 7/2/1998 | | PEND |
|
|
|
FAXED GORDON MCDONALD THE REQUESTED CORRECTIONS FROM ATWOOD-HINZMAN-JONES.
|
Routing Off Site - STRUCTURAL | 6/17/1998 | | 7/1/1998 | | |
|
|
|
CONTACTED PDQ TO TAKE PLANS TO ATWOOD HINZMAN AND JONES 7-1-98 RECEIVED STRUCTURAL PLAN CHECK REVIEW COMMENTS. ROUTED TO JOHN M.
|
Routing - PLANNING | 6/29/1998 | | 6/30/1998 | | FAIL |
|
|
|
Applicant needs to submit revised plans and information to comply with DRH98-0046 conditions of approval.
|
Plan routing begun/NEW & ADDTN | | | 6/29/1998 | | PEND |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 6/11/1998 | | PEND |
|
|
|
SEE BLD98-1654 ACTION A007 PEND
|
Received Certificate of Value | | | 6/11/1998 | | PASS |
|
|
|
|
Plan assigned to (MYS) | 6/9/1998 | | 6/11/1998 | | |
Marlene Southard
|
|
|
|
Application received | | | 6/9/1998 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/9/1998 | | PEND |
|
|
|
|