Description
EMERALD RESEARCH AND DEVELOPMENT PARK BUILDING "B" * TO CONSTRUCT A A NEW 15,525 SQ. FT., ONE STORY OFFICE SHELL BUILDING. CONSTRUCTED OF CONCRETE-TILT-UP EXTERIOR WALLS, CONCRETE SLAB FLOOR AND STEEL ROOF JOIST WITH METAL METAL ROOF DECK. THERE IS NO INTERIOR FINISH OR MECHANICAL WORK INCLUDED WITH THIS PERMIT. THIS IS A SHELL PERMIT ONLY AND NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT. A SEPARATE TENANT IMPROVEMETN PERMIT IS REQUIRED TO FINISH EACH PROPOSED TENANT SPACE. THIS BUILDING WILL BE FULLY FIRE SPRINKLED. SPRINKLERS ARE USED FOR AREA INCREASE. THIS PERMIT ALSO INCLUDES RELATED SITE IMPROVEMENTS. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. DRH98-0046/PC#371-98/JCM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Receive PAYMENT IN FULL  10/5/1999 DONE
(F) Reprint permit  8/26/1999
(F) Reprint permit  8/25/1999
(F) Reprint permit  8/25/1999
Letter of compliance  7/1/1999 PASS
Letter of Compliance #16611 issued 7-1-99.
INSP-Final Inspection6/24/19996/25/19996/25/1999APASS
DetailsJoe Tawney
06/25/99 406 - REINSP OK FOR CERT OF COMPLETION
INSP - Final6/24/19996/25/19996/25/1999PPASS
DetailsCarl Dependahl
06/25/99 340 - Scheduled by Hello!. ok card to cont
INSP-Final Inspection6/22/19996/23/19996/23/1999PFAIL
DetailsJoe Tawney
06/23/99 406 - REINSP FAIL NFPA 72 FORM
INSP - Final6/22/19996/23/19996/23/1999PFAIL
DetailsCarl Dependahl
06/23/99 340 - Scheduled by Hello!. Contact phone is [8677613].
INSP - Final6/11/19996/11/19996/11/1999 PART
DetailsJoe Tawney
/ / 406 - REINSP OK FOR TEMP OCC, BARRICADES, NFPA 72
INSP - Final6/11/19996/11/19996/11/1999APART
DetailsCarl Dependahl
06/11/99 340 - c/n need eng's letter; ok for t/o Scheduled by Hello!.
INSP-Final Inspection6/9/19996/10/19996/10/1999AFAIL
DetailsJoe Tawney
06/10/99 406 -
INSP - Final6/10/19996/10/19996/10/1999PFAIL
DetailsCarl Dependahl
06/10/99 340 - Scheduled by Hello!. Contact phone is [8677613].NEED FIR
INSP-Final Inspection6/8/19996/8/19996/8/1999PFAIL
DetailsJoe Tawney
06/08/99 406 - REINSP SHELL FAIL SEVERAL ITEMS
INSP-Sprinkler Rough-in/Hydro6/7/19996/7/19996/7/1999 FAIL
DetailsJoe Tawney
/ / 406 - OK HYDRO TEST ROUGH IN FAIL SPACING
INSP - Final6/3/19996/4/19996/4/1999PFAIL
DetailsCarl Dependahl
06/04/99 340 - Scheduled by Hello!. Contact phone is [8677613]. C/N, NE
INSP-Sprinkler Rough-in/Hydro6/4/19996/4/19996/4/1999 PART
DetailsJoe Tawney
/ / 406 - OK ON ABOVE & BELOW GROUND HYDRO TESTS
INSP-Final Inspection6/1/19996/2/19996/2/1999AFAIL
DetailsJoe Tawney
06/02/99 406 - FINAL SHELL FAIL HYDRO TESTS, SPKLR R I, ALARM TEST
Code Occupancy Approval  6/2/1999 PASS
ALL CONDITIONS OF DRH98-0046 AND PARKING LOT PLANTERS MOD OKED BY TEMPRA (PHASE 1) HAVE BEEN MET, FINAL OCCUPANCY SIGNED OFF.
INSP-Supply line flush5/19/19995/19/19995/19/1999PPASS
DetailsRick Jackson
underground flush okay
Code Occupancy Approval  3/30/1999
final requested by Pat Childs ###-####
Fee Review-notes11/4/1998 1/28/1999
INSP - Framing/Rough-in9/28/19989/29/19989/29/1998APART
Details
09/29/98 338 - this is a tilt up panel insp
INSP - Foundation8/31/19989/1/19989/1/1998PPART
Details
made ok to pour the footings entire building with the sp insp approval need modification of the sp insp letter from the owner
INSP - Foundation9/1/19989/1/19989/1/1998 PART
Details
09/01/98 338 - MADEOK TO POUR WITH SP INSP APPROVAL
(F) Reprint permit  8/31/1998
Issue PAID IN FULL permit  8/28/1998
Telephone call  8/27/1998
CALLED PAT PERMIT READY
Print Occupancy Form  8/25/1998
Inspection Record Card- Bld  8/25/1998
Inspection Record Card- Bld  8/25/1998
Plan assigned to (JCM)6/11/1998 8/24/1998 PASS
DetailsJohn Menard
Plan resubmittals received  8/24/1998 PEND
RECEIVED RESUBMITTALS FROM A.S.E., FORWARDED SAME TO JOHN MENARD.
PLANS/APPL TAKEN TO FRONT DESK  8/24/1998 PASS
Routing - PLAN CHECK8/13/1998 8/24/1998 PASS
Routing Off Site - STRUCTURAL8/17/1998 8/19/1998
RESUBS SENT TO ATWOOD HINZMAN AND JONES
Plan resubmittals received  8/17/1998
RESUBS RECEIVED AND SENT TO ATWOOD
Routing - PLUMBING8/13/1998 8/13/1998 PASS
Routing - PLANNING8/4/1998 8/12/1998 PASS
drh98-0046
Plan resubmittals received  8/4/1998
RECIVED REVISED CIVIL SHEETS 1 THRU 5.
Routing - PLUMBING7/30/1998 8/3/1998 FAIL
Plan resubmittals received  7/29/1998
RECEIVED 2 COPIES OF CIVIL SHEETS 1 THRU 5. ROUTED TO JOHN M.
Routing - FIRE7/20/1998 7/22/1998 PASS
Plan Review Completed(1st rev)  7/22/1998 FAIL
plumbing, pw and structural issues
Routing - PLUMBING7/8/1998 7/10/1998 FAIL
Routing - PUBLIC WORKS6/30/1998 7/8/1998 PASS
Plans ACCEPTED BY PLAN CHECK  7/6/1998 PASS
SEE ACTION A007 PEND
Routing Off Site - STRUCTURAL6/17/1998 7/1/1998
CONTACTED PDQ TO TAKE PLANS OUT TO ATWOOD HINZMAN AND JONES 7-1-98 RECEIVED STRUCTURAL PLAN CHECK REVIEW COMMENTS AND ROUTED TO JOHN M.
Routing - PLANNING6/29/1998 6/30/1998 FAIL
Applicant needs to submit revised plans and information to comply with DRH98-0046 conditions.
Plan routing begun/NEW & ADDTN  6/29/1998 PEND
SEE ACTION A007 PEND
Plan assigned to (MYS)6/9/1998 6/11/1998
DetailsMarlene Southard
Plans ACCEPTED BY PLAN CHECK  6/11/1998 PEND
CONTACTED DAVID KADANKO AT ###-#### TO LET HIM KNOW THAT 1. ARCH. SHEETS NEED TO BE SIGNED 2. TWO COPIES OF LANDSCAPE SHEETS ARE REQUIRED. 3. ONE OUTSIDE ENG. PACKAGE IS REQUIRED ALSO (SOILS REP) 4. THREE ADDITIONAL GRADING AND DRAINAGE PLANS ARE REQUIRED. ROUTING CANNOT PROCEED UNTIL THESE ITEMS ARE RECEIVED. KMM 6-17-98 1. GORDON CAME AND SIGNED ARCH. SHEETS. 2. RECEIVED 2 COPIES OF LANDSCAPE SHEETS. 3. EXCHANGED ONE SET FROM PACKAGE #1 FOR OUT SIDE ENG. GORDON WILL BRING IN ANOTHER FULL COPY OF PLANS FOR PACKAGE #1. 4. CONTACTED BRIAN ABOUT CIVIL. HE SAID HE HAD WHAT HE NEEDED. 5. RECEIVED SOILS REPORT AND PUT WITH OUTSIDE ENG. 6-19-98 1. RECEIVED FULL ADDITIONAL COPY OF PLANS, HOWEVER CIVIL SHEETS WERE NOT STAMPED OR SIGNED. CALLED DAVE KADANKO TO GET SHEETS STAMPED AND SIGNED. 6-29-98 TALKED WITH DAVE TO REMIND HIM THAT CIVIL SHEETS NEED TO BE STAMPED AND SIGNED. WILL ROUTE TO P&Z WHILE I WAIT. 6-30-98 TALKED WITH KEITH JACOBS ABOUT CIVIL SHEETS. HE WILL BRING 2 COPIES IN FOR ME. HE STATED HE HAS SUBMITTED TO BRIAN M. AND JOHN JOHNSON. KMM 7-6-98 RECEIVED CIVIL SHEETS, STAMPED AND SIGNED PUT WITH PLANS IN P.W. (4 COPIES)
Received Certificate of Value  6/10/1998 PASS
Recd Pcfee & Taken To Pln CK  6/9/1998 PEND
Application received  6/9/1998
Routing Off Site - STRUCTURAL8/7/1998  
SENT RESUBMITTALS TO ATWOOD, HINZMAN, JONES