Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD98-01674
StatusFinaled
Name PAT HANIGAN
Site Address 8948 W BARNES ST
Project NameQUE-FINANCIAL
Customer Number 
ePlanReviewNo
Description
QUE-FINANCIAL SERVICE WARE TECHNOLOGIES * TO CONSTRUCT A NEW 11,000 S.F. OFFICE BUILDING. THIS TWO STORY BUILDING HAS A SLAB ON GRADE FOUNDATION WITH PERIMETER FOOTINGS. THE STRUCTURE IS PRE-ENGINEERED STEEL FRAMED WITH METAL STUDS AT THE PERIMETER AND ALUCOBND SKIN, BRICK PILASTERS WITH COLUMNS FLANK THE EXTERIOR. ALUMINUM WINDOWS WRAP THE BUILDING ON ALL FLOORS. THE METAL FLAT ROOF HAS A PARAPET AROUND THE PERIMETER. THE INTERIOR IS COMPLETELY FINISHED WITH METAL STUDS, GYP.BD., LAY-IN CEILING AND BUILT IN CABINETRY. SITE WORK IS TO BE COMPLETE WITH LANDSCAPPING, PATIO, IRRIGATION SYSTEM AND PARKING LOT STRIPING. ALL PER APPROVED PLANS. The building is fully fire sprinkled. DRH97-0237-8948 PC#375-98 jml M_P
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 3/31/20003/31/2000 DONE
Details
Permanent Occupancy 3/31/20003/31/2000 DONE
Details
Permanent occupancy UNPAID FEE  3/31/2000 DONE
Perm. Occ. Cert. #8176 issued 3-31-00 to Que Financial.
BLD-Final3/29/20003/30/20003/30/2000PPASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/29/2000 at 16:21:06. Contact: ###-####. Card to cont. 3/31/00 8:53:06 AM
Code Occupancy Approval  3/30/2000 PASS
Meets compliance with plans on site dated 8/4/99 by Marty Santoya. (omit the fence around the patioat back.)
FIRE-Final Inspection3/27/20003/28/20003/28/2000PPASS
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 03/27/2000 at 16:57:25. Contact: ###-####. Reinsp. ok for perm. occ. 3/29/00 10:11:08 AM
FIRE-Final Inspection3/24/20003/27/20003/27/2000AFAIL
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 03/24/2000 at 15:21:09. Contact: ###-####. Reinsp. fail alarm system problems 3/27/00 4:22:25 PM
BLD-Final3/24/20003/27/20003/27/2000PFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/24/2000 at 15:22:06. Contact: ###-####. N/R 3/28/00 9:16:31 AM
FIRE-Final Inspection3/23/20003/24/20003/24/2000AFAIL
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 03/23/2000 at 09:41:15. Contact: ###-####. Final fail C/N issued. 3/24/00 1:09:45 PM
FIRE-Supply Line Hydro3/10/20003/10/20003/10/2000PPART
DetailsJoe Tawney
terry nelson ###-#### Ok on underground & above ground hydro tests. 3/14/00 11:21:59 AM
BLD-Other2/21/20002/22/20002/22/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/21/2000 at 15:05:39. Contact: ###-####. C/N; need detail for disontinuity. 2/23/00 11:27:01 AM
FIRE-Sprinkler Rough-in1/24/20001/24/20001/26/2000PPART
DetailsJoe Tawney
###-#### Terry Ok to cover hard lid area in south canopy. 1/26/00 2:18:35 PM
BLD-Framing/Rough-in12/10/199912/13/199912/13/1999APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/10/1999 at 14:56:51. Contact: ###-####. Insulation, ok to cover.
FIRE-Supply Line Flush12/9/199912/9/199912/9/1999PPART
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 12/09/1999 at 08:32:22. Contact: ###-####. Ok supply line flush.
BLD-Framing/Rough-in12/2/199912/3/199912/3/1999APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/02/1999 at 15:53:30. Contact: ###-####. Need EFIS listing; ok to insulate ext. walls.
BLD-Framing/Rough-in11/24/199911/24/199911/24/1999PPART
DetailsCarl Dependahl
Need all listing/ install & er. report for EFIS.
BLD-Framing/Rough-in11/19/199911/19/199911/19/1999APART
DetailsCarl Dependahl
Verbal request for EFIS (dryvit) listing for compliance w/UBC 1402; EFIS to be installed over OSB shear walls that are load bearing.
BLD-Framing/Rough-in11/15/199911/15/199911/16/1999PFAIL
DetailsCarl Dependahl
GREG ###-#### CELL R/I-- NAILING INSP C/N.. Hold downs @ mark 4, complete shear wall (int.) roof nailing; ok to begin cover @ ext.
BLD-Framing/Rough-in11/5/199911/8/199911/8/1999APART
DetailsCarl Dependahl
GREG--- FR ###-#### Ext. "Pilasters" only- ok to delets sprinklers.
BLD-Framing/Rough-in11/3/199911/4/199911/4/1999AFAIL
Details
GREG ###-#### Need eng. Written approval of the details submitted by same.
FIRE-Conference11/2/199911/2/199911/2/1999PPART
DetailsJoe Tawney
Conf. on costr. of columns to meet code expectation for spklr. protection.
BLD-Framing/Rough-in11/1/199911/1/199911/1/1999PFAIL
DetailsCarl Dependahl
GREG ###-#### Referred to fire insp. Re: sprinklers @ concealed space
BLD-Foundation10/11/199910/7/199910/8/1999APART
DetailsCarl Dependahl
Pending special insp. report and eng's ok for shear wall construction
BLD-Conference9/23/19999/23/19999/23/1999PPART
DetailsCarl Dependahl
Keep C/N
INSP - Foundation9/14/19999/14/19999/14/1999PPART
DetailsCarl Dependahl
MTI ONSITE, PEND SPCL INSPCTN REPORT
INSP - Foundation9/8/19999/9/19999/9/1999APART
DetailsCarl Dependahl
MT/onsite, prelim soils report (test) ok. Keep c/n, need engr's clarification for sheer walls.
INSP - Foundation9/1/19999/2/19999/2/1999ACANC
DetailsTom Arcoraci
09/02/99 408 - done by 340
INSP - Footings9/2/19999/2/19999/2/1999 FAIL
DetailsCarl Dependahl
/ / 340 - NEED SPEC INS FTGS;CLARIFY CONST DETAILS: SHEAR WALLS
INSP - Foundation9/1/19999/1/19999/1/1999PFAIL
DetailsCarl Dependahl
09/01/99 340 - GREGG ###-####, FOOTING; RECALL, WILL NEED ENG'S CLARIFIC
CHANGE STATUS TO (R)  8/24/1999 PEND
fees owning\\plan mod.
CHANGE STATUS TO (I)  8/24/1999
Receive PAYMENT IN FULL PRINT  8/24/1999
Telephone call  8/24/1999 MESS
left message ###-####
Plan assigned to (MLO)6/21/1999 8/24/1999 PASS
DetailsMike Otto
Routing Off Site - STRUCTURAL8/20/1999 8/24/1999 PASS
CONTACTED PDQ TO TAKE ADDITIONAL STRUCT. CALCS. TO OUTSIDE ENG. KMM RECEIVED TELEPHONE CALL FROM H. HENRICKSON THAT RESUBMITTAL WAS APPROVED AND LETTER IS FORTHCOMING. 8-24-99 MLO 8-26-99 RECEIVED STRUCTURAL REVIEW LETTER FROM CH2MHILL STATING "NO FURTHER REVIEW OF THIS PACKAGE IS REQUIRED. ROUTED TO MIKE OTTO. KMM
Plan resubmittals received  8/23/1999 PEND
RECEIVED PLAN RESUBMITTALS FROM ARMSTRONG ARCHITECTS, FORWARDED SAME TO MIKE OTTO. 8/23/99 DAR
Plan resubmittals received  8/20/1999 PEND
RECEIVED ONE COPY OF CALCS INSTEAD OF TWO AS REQUESTED AND HAVE PLAN REVISIONS WITH NO REVISED PLANS PROVIDED. CALL PUT INTO ENGINEER. 8-20-99 MLO.
Routing Off Site - STRUCTURAL8/2/1999 8/17/1999 FAIL
FORWARDED RESUBMITTALS TO CONSULTING STRUCTURAL ENGINEER. 8/2/99 DAR CORRECTIONS FAXED TO ENGINEER AND ARCHITECT. 8/17/99 MLO.
Plan resubmittals requested  8/17/1999 FAIL
STRUCTURAL CORRECTIONS SENT TO ARHCITECT AND ENGINEER. MLO
Routing - PLANNING8/4/1999 8/5/1999 PASS
approved per DRH98-0237 and DRH99-0136.
Routing - PLANNING8/4/1999 8/4/1999 PASS
approved.
Telephone call  8/2/1999 PEND
RECEIVED ONLY TWO COPIES OF REVISED STRUCTURAL SHEETS. CONTACTED MARGIE KENNEDY TO PROVIDE ADDTITIONAL SHEEY AS REQUESTED ON FAX TO KEITH JONES 7-19-99. MLO
Plan resubmittals received  7/30/1999 PEND
RECEIVED PLAN RESUBMITTAL FOR ENGINEERING FROM MARGE KENNEDY, ARMSTRONG ARCHITECTS, FORWARDED SAME TO MIKE OTTO. 8/2/99
Routing - PLANNING7/26/1999 7/26/1999 PEND
Informed Margie Kennedy with Armstrong Architects that landscape plan must be revised to omit rock base along Maple Grove and provide lawn.
Routing - FIRE7/19/1999 7/21/1999 PASS
PLAN MODIFICATION. KMM
Routing - PLAN CHECK7/16/1999 7/19/1999 PASS
FLOOR PLAN IS THE SAME AS LEVIN HAD PREVIOUSLY APPROVED . MLO
Plan resubmittals requested  7/19/1999 FAIL
CORRECTIONS SENT TO ENGINEER. MLO
Routing Off Site - STRUCTURAL6/16/1999 7/19/1999 FAIL
CONTACTED PDQ TO TAKE PLAN MODIFICATION TO OUTSIDE ENG. KMM
Routing - PLANNING7/15/1999 7/16/1999 PEND
Need a revised landscape plan which substitutes the rock mulch along Maple Grove to lawn.
Routing - PLAN CHECK6/21/1999 7/14/1999 PEND
Routing - PLANNING6/21/1999 6/21/1999 PEND
PLAN MODIFICATION. KMM 6-17-99 MARTY DOES NOT WANT PLANS UNTIL 6-25-99 HE IS WAITING FOR SOME PAPER WORK FROM MARGIE K. KMM. Modification application has been submitted and should be completed by June 28; however, there is a 10 day appeal period after approval date.
Routing - PLUMBING6/17/1999 6/21/1999 PASS
PLAN MODIFICATION. KMM
Routing - PUBLIC WORKS6/16/1999 6/17/1999 PASS
PLAN MODIFICATION. KMM
Plan routing begun/NEW & ADDTN  6/16/1999 PASS
PLAN MODIFICATION. KMM
Plans ACCEPTED BY PLAN TECH  6/16/1999 PASS
PLAN MODIFICATION ACCEPTED. KMM
Plan Modification Accepted  6/16/1999 PASS
DIFFERENT BUILDERS FOR THE MODIFICATION. FALASH & ROSS CONSTRUCTION INC. WILL BE BUILDILNG THIS PROJECT.
Fee Review-notes12/18/1998 4/19/1999
Plan Reviewer's activity  3/24/1999
Changed the reference from the 1997 to the 1994 UBC in the permit.
(F) Reprint permit  3/10/1999
Routing Off Site - A.C.H.D3/9/19993/9/19993/9/1999 PASS
#99-4695
Issue PAID IN FULL permit  3/9/1999
Ready Permit EXTENDED  3/8/1999
Telephone call  2/26/1999 MESS
left mess for dick talboy on cell ###-#### that plans need to be picked up
CHANGE STATUS TO (R)  2/3/1999
Permit EXTENDED  11/30/1998
CHANGE STATUS TO (R)  11/30/1998
Permit EXTENDED  11/5/1998 PASS
permit extended until dec. 1, 1998-as per jeff jones letter sent out nov 1, 1998.mps
Inspection Record Card- Bld  9/25/1998
Print Occupancy Form  9/25/1998
Telephone call  9/25/1998
called told them we still need something for achd to show fees are paid on them.m
PLANS/APPL TAKEN TO FRONT DESK  9/24/1998 PASS
Print Pending Permit.LaserJet4  9/24/1998 PASS
Plan assigned to (JML)6/12/1998 9/24/1998 PASS
Details
Routing - PLAN CHECK7/24/1998 9/24/1998 PASS
Plan resubmittals received  9/23/1998 PEND
RESUBMITTALS RECEIVED FROM ARMSTRONG ARCHITECTS, FORWARDED SAME TO JOHN LEVIEN.
Telephone call  8/31/1998 PEND
I called Margie of Armstrong Arch. in response to a fax rec'd 8/27. Re: the rear exit. An exclosed patio would be approved and not considered an interviening room since it would not accumulate smoke and it is outside of the building provided that the door meets all the exit provisions for doors.
Routing Off Site - STRUCTURAL7/20/1998 7/24/1998
REVISED PLANS SUBMITTED ON 7-17-98 7-24-98 RECEIVED (SUBJECT) 1. STRUCTURAL REVIEW FOR RESUBMITTAL NO. 1 2. REVIEW RESPONSES TO ORIGINAL STRUCTURAL REVIEW 3. REVISED ARCHITECTURAL AND STRUCTRUAL FOUNDATION SHEET A2.0 STAMPED 7-16-98 ROUTED TO JOHN L.
Routing Off Site - STRUCTURAL7/6/1998 7/24/1998
SENT ONE COPY OF METALLIC STRUCT. SHEETS AND CALCS. FOR PRE ENGINEERED BLD TO HOWIE OF CH2MHILL -- APPROVED BY HOWIE
Routing - FIRE7/17/1998 7/23/1998 PASS
Plan Review Completed(1st rev)  7/23/1998 FAIL
UBC issues
Routing - PUBLIC WORKS7/16/1998 7/17/1998 PASS
Plan resubmittals received  7/17/1998
RECEIVED 3 COPIES OF SHEET A2.0. ONE COPY OF RESPONSE LETTER TO THE STRUCTURAL ENG. COMMENTS. ROUTED TO JOHN L. KMM
Routing - PLAN CHECK7/13/1998 7/16/1998 FAIL
ROUTED THE METALLIC DESIGN CALC. FOR THE PRE MANUFACTURED BUILDING TO JOHN L. 2 COPIES. THE THIRD COPY OF PLANS WITH CALCS. SENT TO CH2MHILL. STILL WAITING FOR STRUCT. SHEETS LISTED ON PLANS.
Plan Reviewer's activity  7/16/1998 PEND
I discussed w/ Margie Kennedy of Armstrong Arch some of the corrections needed on the plan. We also agreed that this review would be done under the 94 code even thou she had requested a review under the 97 code.
Routing - PLUMBING7/8/1998 7/10/1998 PASS
Plans ACCEPTED BY PLAN CHECK  7/7/1998 PASS
SEE ACTION A007 FAIL
Routing - PLANNING6/25/1998 7/7/1998 PASS
approved per DRH97-0237.
Plan Reviewer's activity  7/7/1998 PEND
SENT PLAN REVIEW FROM OUTSIDE ENGINEERING CONSULTANT TO ARCHITECT BY FAX
Routing Off Site - STRUCTURAL6/19/1998 7/1/1998
CONTACTED PDQ TO TAKE PLANS OUT TO CH2MHILL RECEIVED CH2MHILL TRANSMITTAL REGUARDING QUE FINANCIAL. ROUTED TO JOHN L.
Routing - PUBLIC WORKS6/19/1998 6/25/1998 FAIL
REQUIRES DRAINAGE PLAN REVISION PER BM
Plan routing begun/NEW & ADDTN  6/19/1998 PEND
Plan assigned to (MYS)6/10/1998 6/12/1998
DetailsMarlene Southard
Plans ACCEPTED BY PLAN CHECK  6/12/1998 FAIL
CONTACTED ADALOF OF TALBOY CONSTRUCTION TO LET HIM KNOW THAT I NEED. 1. 2 COPIES OF STRUCTURAL SHEETS WITH CALCS. 2. 3 CLOPIES OF GRADING AND DRAINAGE SHEETS 3. 1 COPY OF PACKAGE #2 OUTSIDE ENGINEERING. I HAVE SOILS REPORT. 6-19-98 RECEIVED 1. 2 COPIES OF SHEET A2.0 FOUNDATION WITH CALCS. 2. 1 PACKAGE OF OUTSIDE ENG. 6-29-98 RECEIVED A CALL FROM HOWIE OF CH2MHILL. STRUCTURAL SET INCOMPLETE. S SHEETS MISSING. I CONTACTED ADOLF OF TLABOY TO LET HIM KNOW THAT I NEED 3 COPIES OF STRUCT. SHEETS WITH CALCS. ASAP! WILL ROUTE TO P&Z FOR NOW. 7-6-98 RECEIVED 3 COPIES OF STRUCT. SHEETS WITH CALCS. FOR THE PRE ENGINEERED BUILDING FROM METALLIC BUILDING COMPANY. (FROM ADOPH) I STILL NEED 3 COPIES OF STRUCT. SHEETS AS LISTED ON THE PLANS. CONTACTED MARGIES OF THIS NEED. 7-7-98 MARGIE CALLED AND STATED THAT STRUCT. SHEETS FROM METALLIC COMP. ARE TAKEING THE PLACE OF THE STRUCT. SHEETS LISTED ON THE PLANS. CALLED HOWIE TO LET HIM KNOW OF THIS.
Received Certificate of Value  6/12/1998 PASS
Application received  6/10/1998
Recd Pcfee & Taken To Pln CK  6/10/1998
ISSUE ACTIONS     
Case Summary (BLD)