Permanent Occupancy | | 3/31/2000 | 3/31/2000 | | DONE |
|
|
|
|
Permanent Occupancy | | 3/31/2000 | 3/31/2000 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 3/31/2000 | | DONE |
|
|
|
Perm. Occ. Cert. #8176 issued 3-31-00 to Que Financial.
|
BLD-Final | 3/29/2000 | 3/30/2000 | 3/30/2000 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 03/29/2000 at 16:21:06. Contact: ###-####. Card to cont. 3/31/00 8:53:06 AM
|
Code Occupancy Approval | | | 3/30/2000 | | PASS |
|
|
|
Meets compliance with plans on site dated 8/4/99 by Marty Santoya. (omit the fence around the patioat back.)
|
FIRE-Final Inspection | 3/27/2000 | 3/28/2000 | 3/28/2000 | P | PASS |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 03/27/2000 at 16:57:25. Contact: ###-####. Reinsp. ok for perm. occ. 3/29/00 10:11:08 AM
|
FIRE-Final Inspection | 3/24/2000 | 3/27/2000 | 3/27/2000 | A | FAIL |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 03/24/2000 at 15:21:09. Contact: ###-####. Reinsp. fail alarm system problems 3/27/00 4:22:25 PM
|
BLD-Final | 3/24/2000 | 3/27/2000 | 3/27/2000 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 03/24/2000 at 15:22:06. Contact: ###-####. N/R 3/28/00 9:16:31 AM
|
FIRE-Final Inspection | 3/23/2000 | 3/24/2000 | 3/24/2000 | A | FAIL |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 03/23/2000 at 09:41:15. Contact: ###-####. Final fail C/N issued. 3/24/00 1:09:45 PM
|
FIRE-Supply Line Hydro | 3/10/2000 | 3/10/2000 | 3/10/2000 | P | PART |
Joe Tawney
|
|
|
terry nelson ###-#### Ok on underground & above ground hydro tests. 3/14/00 11:21:59 AM
|
BLD-Other | 2/21/2000 | 2/22/2000 | 2/22/2000 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/21/2000 at 15:05:39. Contact: ###-####. C/N; need detail for disontinuity. 2/23/00 11:27:01 AM
|
FIRE-Sprinkler Rough-in | 1/24/2000 | 1/24/2000 | 1/26/2000 | P | PART |
Joe Tawney
|
|
|
###-#### Terry Ok to cover hard lid area in south canopy. 1/26/00 2:18:35 PM
|
BLD-Framing/Rough-in | 12/10/1999 | 12/13/1999 | 12/13/1999 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/10/1999 at 14:56:51. Contact: ###-####. Insulation, ok to cover.
|
FIRE-Supply Line Flush | 12/9/1999 | 12/9/1999 | 12/9/1999 | P | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 12/09/1999 at 08:32:22. Contact: ###-####. Ok supply line flush.
|
BLD-Framing/Rough-in | 12/2/1999 | 12/3/1999 | 12/3/1999 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/02/1999 at 15:53:30. Contact: ###-####. Need EFIS listing; ok to insulate ext. walls.
|
BLD-Framing/Rough-in | 11/24/1999 | 11/24/1999 | 11/24/1999 | P | PART |
Carl Dependahl
|
|
|
Need all listing/ install & er. report for EFIS.
|
BLD-Framing/Rough-in | 11/19/1999 | 11/19/1999 | 11/19/1999 | A | PART |
Carl Dependahl
|
|
|
Verbal request for EFIS (dryvit) listing for compliance w/UBC 1402; EFIS to be installed over OSB shear walls that are load bearing.
|
BLD-Framing/Rough-in | 11/15/1999 | 11/15/1999 | 11/16/1999 | P | FAIL |
Carl Dependahl
|
|
|
GREG ###-#### CELL R/I-- NAILING INSP C/N.. Hold downs @ mark 4, complete shear wall (int.) roof nailing; ok to begin cover @ ext.
|
BLD-Framing/Rough-in | 11/5/1999 | 11/8/1999 | 11/8/1999 | A | PART |
Carl Dependahl
|
|
|
GREG--- FR ###-#### Ext. "Pilasters" only- ok to delets sprinklers.
|
BLD-Framing/Rough-in | 11/3/1999 | 11/4/1999 | 11/4/1999 | A | FAIL |
|
|
|
GREG ###-#### Need eng. Written approval of the details submitted by same.
|
FIRE-Conference | 11/2/1999 | 11/2/1999 | 11/2/1999 | P | PART |
Joe Tawney
|
|
|
Conf. on costr. of columns to meet code expectation for spklr. protection.
|
BLD-Framing/Rough-in | 11/1/1999 | 11/1/1999 | 11/1/1999 | P | FAIL |
Carl Dependahl
|
|
|
GREG ###-#### Referred to fire insp. Re: sprinklers @ concealed space
|
BLD-Foundation | 10/11/1999 | 10/7/1999 | 10/8/1999 | A | PART |
Carl Dependahl
|
|
|
Pending special insp. report and eng's ok for shear wall construction
|
BLD-Conference | 9/23/1999 | 9/23/1999 | 9/23/1999 | P | PART |
Carl Dependahl
|
|
|
Keep C/N
|
INSP - Foundation | 9/14/1999 | 9/14/1999 | 9/14/1999 | P | PART |
Carl Dependahl
|
|
|
MTI ONSITE, PEND SPCL INSPCTN REPORT
|
INSP - Foundation | 9/8/1999 | 9/9/1999 | 9/9/1999 | A | PART |
Carl Dependahl
|
|
|
MT/onsite, prelim soils report (test) ok. Keep c/n, need engr's clarification for sheer walls.
|
INSP - Foundation | 9/1/1999 | 9/2/1999 | 9/2/1999 | A | CANC |
Tom Arcoraci
|
|
|
09/02/99 408 - done by 340
|
INSP - Footings | 9/2/1999 | 9/2/1999 | 9/2/1999 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - NEED SPEC INS FTGS;CLARIFY CONST DETAILS: SHEAR WALLS
|
INSP - Foundation | 9/1/1999 | 9/1/1999 | 9/1/1999 | P | FAIL |
Carl Dependahl
|
|
|
09/01/99 340 - GREGG ###-####, FOOTING; RECALL, WILL NEED ENG'S CLARIFIC
|
CHANGE STATUS TO (R) | | | 8/24/1999 | | PEND |
|
|
|
fees owning\\plan mod.
|
CHANGE STATUS TO (I) | | | 8/24/1999 | | |
|
|
|
|
Receive PAYMENT IN FULL PRINT | | | 8/24/1999 | | |
|
|
|
|
Telephone call | | | 8/24/1999 | | MESS |
|
|
|
left message ###-####
|
Plan assigned to (MLO) | 6/21/1999 | | 8/24/1999 | | PASS |
Mike Otto
|
|
|
|
Routing Off Site - STRUCTURAL | 8/20/1999 | | 8/24/1999 | | PASS |
|
|
|
CONTACTED PDQ TO TAKE ADDITIONAL STRUCT. CALCS. TO OUTSIDE ENG. KMM RECEIVED TELEPHONE CALL FROM H. HENRICKSON THAT RESUBMITTAL WAS APPROVED AND LETTER IS FORTHCOMING. 8-24-99 MLO 8-26-99 RECEIVED STRUCTURAL REVIEW LETTER FROM CH2MHILL STATING "NO FURTHER REVIEW OF THIS PACKAGE IS REQUIRED. ROUTED TO MIKE OTTO. KMM
|
Plan resubmittals received | | | 8/23/1999 | | PEND |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM ARMSTRONG ARCHITECTS, FORWARDED SAME TO MIKE OTTO. 8/23/99 DAR
|
Plan resubmittals received | | | 8/20/1999 | | PEND |
|
|
|
RECEIVED ONE COPY OF CALCS INSTEAD OF TWO AS REQUESTED AND HAVE PLAN REVISIONS WITH NO REVISED PLANS PROVIDED. CALL PUT INTO ENGINEER. 8-20-99 MLO.
|
Routing Off Site - STRUCTURAL | 8/2/1999 | | 8/17/1999 | | FAIL |
|
|
|
FORWARDED RESUBMITTALS TO CONSULTING STRUCTURAL ENGINEER. 8/2/99 DAR CORRECTIONS FAXED TO ENGINEER AND ARCHITECT. 8/17/99 MLO.
|
Plan resubmittals requested | | | 8/17/1999 | | FAIL |
|
|
|
STRUCTURAL CORRECTIONS SENT TO ARHCITECT AND ENGINEER. MLO
|
Routing - PLANNING | 8/4/1999 | | 8/5/1999 | | PASS |
|
|
|
approved per DRH98-0237 and DRH99-0136.
|
Routing - PLANNING | 8/4/1999 | | 8/4/1999 | | PASS |
|
|
|
approved.
|
Telephone call | | | 8/2/1999 | | PEND |
|
|
|
RECEIVED ONLY TWO COPIES OF REVISED STRUCTURAL SHEETS. CONTACTED MARGIE KENNEDY TO PROVIDE ADDTITIONAL SHEEY AS REQUESTED ON FAX TO KEITH JONES 7-19-99. MLO
|
Plan resubmittals received | | | 7/30/1999 | | PEND |
|
|
|
RECEIVED PLAN RESUBMITTAL FOR ENGINEERING FROM MARGE KENNEDY, ARMSTRONG ARCHITECTS, FORWARDED SAME TO MIKE OTTO. 8/2/99
|
Routing - PLANNING | 7/26/1999 | | 7/26/1999 | | PEND |
|
|
|
Informed Margie Kennedy with Armstrong Architects that landscape plan must be revised to omit rock base along Maple Grove and provide lawn.
|
Routing - FIRE | 7/19/1999 | | 7/21/1999 | | PASS |
|
|
|
PLAN MODIFICATION. KMM
|
Routing - PLAN CHECK | 7/16/1999 | | 7/19/1999 | | PASS |
|
|
|
FLOOR PLAN IS THE SAME AS LEVIN HAD PREVIOUSLY APPROVED . MLO
|
Plan resubmittals requested | | | 7/19/1999 | | FAIL |
|
|
|
CORRECTIONS SENT TO ENGINEER. MLO
|
Routing Off Site - STRUCTURAL | 6/16/1999 | | 7/19/1999 | | FAIL |
|
|
|
CONTACTED PDQ TO TAKE PLAN MODIFICATION TO OUTSIDE ENG. KMM
|
Routing - PLANNING | 7/15/1999 | | 7/16/1999 | | PEND |
|
|
|
Need a revised landscape plan which substitutes the rock mulch along Maple Grove to lawn.
|
Routing - PLAN CHECK | 6/21/1999 | | 7/14/1999 | | PEND |
|
|
|
|
Routing - PLANNING | 6/21/1999 | | 6/21/1999 | | PEND |
|
|
|
PLAN MODIFICATION. KMM 6-17-99 MARTY DOES NOT WANT PLANS UNTIL 6-25-99 HE IS WAITING FOR SOME PAPER WORK FROM MARGIE K. KMM. Modification application has been submitted and should be completed by June 28; however, there is a 10 day appeal period after approval date.
|
Routing - PLUMBING | 6/17/1999 | | 6/21/1999 | | PASS |
|
|
|
PLAN MODIFICATION. KMM
|
Routing - PUBLIC WORKS | 6/16/1999 | | 6/17/1999 | | PASS |
|
|
|
PLAN MODIFICATION. KMM
|
Plan routing begun/NEW & ADDTN | | | 6/16/1999 | | PASS |
|
|
|
PLAN MODIFICATION. KMM
|
Plans ACCEPTED BY PLAN TECH | | | 6/16/1999 | | PASS |
|
|
|
PLAN MODIFICATION ACCEPTED. KMM
|
Plan Modification Accepted | | | 6/16/1999 | | PASS |
|
|
|
DIFFERENT BUILDERS FOR THE MODIFICATION. FALASH & ROSS CONSTRUCTION INC. WILL BE BUILDILNG THIS PROJECT.
|
Fee Review-notes | 12/18/1998 | | 4/19/1999 | | |
|
|
|
|
Plan Reviewer's activity | | | 3/24/1999 | | |
|
|
|
Changed the reference from the 1997 to the 1994 UBC in the permit.
|
(F) Reprint permit | | | 3/10/1999 | | |
|
|
|
|
Routing Off Site - A.C.H.D | 3/9/1999 | 3/9/1999 | 3/9/1999 | | PASS |
|
|
|
#99-4695
|
Issue PAID IN FULL permit | | | 3/9/1999 | | |
|
|
|
|
Ready Permit EXTENDED | | | 3/8/1999 | | |
|
|
|
|
Telephone call | | | 2/26/1999 | | MESS |
|
|
|
left mess for dick talboy on cell ###-#### that plans need to be picked up
|
CHANGE STATUS TO (R) | | | 2/3/1999 | | |
|
|
|
|
Permit EXTENDED | | | 11/30/1998 | | |
|
|
|
|
CHANGE STATUS TO (R) | | | 11/30/1998 | | |
|
|
|
|
Permit EXTENDED | | | 11/5/1998 | | PASS |
|
|
|
permit extended until dec. 1, 1998-as per jeff jones letter sent out nov 1, 1998.mps
|
Inspection Record Card- Bld | | | 9/25/1998 | | |
|
|
|
|
Print Occupancy Form | | | 9/25/1998 | | |
|
|
|
|
Telephone call | | | 9/25/1998 | | |
|
|
|
called told them we still need something for achd to show fees are paid on them.m
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/24/1998 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 9/24/1998 | | PASS |
|
|
|
|
Plan assigned to (JML) | 6/12/1998 | | 9/24/1998 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 7/24/1998 | | 9/24/1998 | | PASS |
|
|
|
|
Plan resubmittals received | | | 9/23/1998 | | PEND |
|
|
|
RESUBMITTALS RECEIVED FROM ARMSTRONG ARCHITECTS, FORWARDED SAME TO JOHN LEVIEN.
|
Telephone call | | | 8/31/1998 | | PEND |
|
|
|
I called Margie of Armstrong Arch. in response to a fax rec'd 8/27. Re: the rear exit. An exclosed patio would be approved and not considered an interviening room since it would not accumulate smoke and it is outside of the building provided that the door meets all the exit provisions for doors.
|
Routing Off Site - STRUCTURAL | 7/20/1998 | | 7/24/1998 | | |
|
|
|
REVISED PLANS SUBMITTED ON 7-17-98 7-24-98 RECEIVED (SUBJECT) 1. STRUCTURAL REVIEW FOR RESUBMITTAL NO. 1 2. REVIEW RESPONSES TO ORIGINAL STRUCTURAL REVIEW 3. REVISED ARCHITECTURAL AND STRUCTRUAL FOUNDATION SHEET A2.0 STAMPED 7-16-98 ROUTED TO JOHN L.
|
Routing Off Site - STRUCTURAL | 7/6/1998 | | 7/24/1998 | | |
|
|
|
SENT ONE COPY OF METALLIC STRUCT. SHEETS AND CALCS. FOR PRE ENGINEERED BLD TO HOWIE OF CH2MHILL -- APPROVED BY HOWIE
|
Routing - FIRE | 7/17/1998 | | 7/23/1998 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 7/23/1998 | | FAIL |
|
|
|
UBC issues
|
Routing - PUBLIC WORKS | 7/16/1998 | | 7/17/1998 | | PASS |
|
|
|
|
Plan resubmittals received | | | 7/17/1998 | | |
|
|
|
RECEIVED 3 COPIES OF SHEET A2.0. ONE COPY OF RESPONSE LETTER TO THE STRUCTURAL ENG. COMMENTS. ROUTED TO JOHN L. KMM
|
Routing - PLAN CHECK | 7/13/1998 | | 7/16/1998 | | FAIL |
|
|
|
ROUTED THE METALLIC DESIGN CALC. FOR THE PRE MANUFACTURED BUILDING TO JOHN L. 2 COPIES. THE THIRD COPY OF PLANS WITH CALCS. SENT TO CH2MHILL. STILL WAITING FOR STRUCT. SHEETS LISTED ON PLANS.
|
Plan Reviewer's activity | | | 7/16/1998 | | PEND |
|
|
|
I discussed w/ Margie Kennedy of Armstrong Arch some of the corrections needed on the plan. We also agreed that this review would be done under the 94 code even thou she had requested a review under the 97 code.
|
Routing - PLUMBING | 7/8/1998 | | 7/10/1998 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 7/7/1998 | | PASS |
|
|
|
SEE ACTION A007 FAIL
|
Routing - PLANNING | 6/25/1998 | | 7/7/1998 | | PASS |
|
|
|
approved per DRH97-0237.
|
Plan Reviewer's activity | | | 7/7/1998 | | PEND |
|
|
|
SENT PLAN REVIEW FROM OUTSIDE ENGINEERING CONSULTANT TO ARCHITECT BY FAX
|
Routing Off Site - STRUCTURAL | 6/19/1998 | | 7/1/1998 | | |
|
|
|
CONTACTED PDQ TO TAKE PLANS OUT TO CH2MHILL RECEIVED CH2MHILL TRANSMITTAL REGUARDING QUE FINANCIAL. ROUTED TO JOHN L.
|
Routing - PUBLIC WORKS | 6/19/1998 | | 6/25/1998 | | FAIL |
|
|
|
REQUIRES DRAINAGE PLAN REVISION PER BM
|
Plan routing begun/NEW & ADDTN | | | 6/19/1998 | | PEND |
|
|
|
|
Plan assigned to (MYS) | 6/10/1998 | | 6/12/1998 | | |
Marlene Southard
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 6/12/1998 | | FAIL |
|
|
|
CONTACTED ADALOF OF TALBOY CONSTRUCTION TO LET HIM KNOW THAT I NEED. 1. 2 COPIES OF STRUCTURAL SHEETS WITH CALCS. 2. 3 CLOPIES OF GRADING AND DRAINAGE SHEETS 3. 1 COPY OF PACKAGE #2 OUTSIDE ENGINEERING. I HAVE SOILS REPORT. 6-19-98 RECEIVED 1. 2 COPIES OF SHEET A2.0 FOUNDATION WITH CALCS. 2. 1 PACKAGE OF OUTSIDE ENG. 6-29-98 RECEIVED A CALL FROM HOWIE OF CH2MHILL. STRUCTURAL SET INCOMPLETE. S SHEETS MISSING. I CONTACTED ADOLF OF TLABOY TO LET HIM KNOW THAT I NEED 3 COPIES OF STRUCT. SHEETS WITH CALCS. ASAP! WILL ROUTE TO P&Z FOR NOW. 7-6-98 RECEIVED 3 COPIES OF STRUCT. SHEETS WITH CALCS. FOR THE PRE ENGINEERED BUILDING FROM METALLIC BUILDING COMPANY. (FROM ADOPH) I STILL NEED 3 COPIES OF STRUCT. SHEETS AS LISTED ON THE PLANS. CONTACTED MARGIES OF THIS NEED. 7-7-98 MARGIE CALLED AND STATED THAT STRUCT. SHEETS FROM METALLIC COMP. ARE TAKEING THE PLACE OF THE STRUCT. SHEETS LISTED ON THE PLANS. CALLED HOWIE TO LET HIM KNOW OF THIS.
|
Received Certificate of Value | | | 6/12/1998 | | PASS |
|
|
|
|
Application received | | | 6/10/1998 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/10/1998 | | |
|
|
|
|
ISSUE ACTIONS | | | | | |
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|