Fee Review-notes | 10/12/1998 | | 1/25/2000 | | DONE |
|
|
|
|
Permanent Occupancy | | 10/5/1999 | 10/5/1999 | | DONE |
|
|
|
|
BLD-Final | 10/4/1999 | 10/5/1999 | 10/5/1999 | A | PASS |
Carl Dependahl
|
|
|
Harvey ###-#### ok for c/o, card to cont.
|
Permanent occupancy | | | 10/5/1999 | | DONE |
|
|
|
Perm. Occ. Cert. #7925 issued 10-5-99 to the Regional Telephone Directory.
|
Code Occupancy Approval | | | 10/4/1999 | | DONE |
Carol Montgomery
|
|
|
Signed final - meets compliance with DRH98-0062 and DRh98-0206
|
BLD-Final | 9/30/1999 | 10/1/1999 | 10/1/1999 | A | PART |
Tom Arcoraci
|
|
|
HARVEY ###-#### TEM OCC INSP/ OK FOR PERM OCC
|
FIRE-Final Inspection | 9/30/1999 | 9/30/1999 | 10/1/1999 | P | PASS |
Joe Tawney
|
|
|
HARVEY ###-#### FN FIRE ok
|
FIRE-Final Inspection | 9/27/1999 | 9/28/1999 | 9/28/1999 | A | FAIL |
Joe Tawney
|
|
|
HARVEY-- ###-#### FN INSP Final fail access signs, door hardware
|
INSP - Framing/Rough-in | 9/2/1999 | 9/2/1999 | 9/2/1999 | P | PART |
Carl Dependahl
|
|
|
09/02/99 340 - CEILING. HARVEY ###-####
|
INSP-Conference | 8/31/1999 | 9/1/1999 | 9/1/1999 | A | PART |
Joe Tawney
|
|
|
09/01/99 406 - CONF W/HARVEY ON DUCT DET & OTHER ISSUES
|
INSP - Framing/Rough-in | 8/27/1999 | 8/30/1999 | 8/30/1999 | A | FAIL |
Carl Dependahl
|
|
|
08/30/99 340 - CEILING TILE HARVEY ###-####; c/n,need pods, s.closing op
|
INSP - Energy code compliance | 7/6/1999 | 7/7/1999 | 7/7/1999 | A | PART |
|
|
|
07/07/99 338 - MADE OK TO START COVER
|
INSP - Framing/Rough-in | 7/1/1999 | 7/2/1999 | 7/2/1999 | P | PART |
|
|
|
07/02/99 338 - made ok to insulate
|
INSP - Framing/Rough-in | 6/28/1999 | 6/29/1999 | 6/29/1999 | A | PART |
Carl Dependahl
|
|
|
06/29/99 340 - Harvey ###-####; truss fix ok, ok to insulate pend hvac.
|
INSP - Framing/ Rough-in | 6/22/1999 | 6/22/1999 | 6/22/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - ROOF, OCC SEP WALL OK TO CXOVER
|
INSP - Framing/ Rough-in | 6/21/1999 | 6/21/1999 | 6/21/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - CONF W/ BLDR
|
INSP - Framing/Rough-in | 6/17/1999 | 6/17/1999 | 6/17/1999 | P | PART |
Carl Dependahl
|
|
|
06/17/99 340 - Dennis ###-####; ext nailing ok to cover
|
INSP - Framing/Rough-in | 6/15/1999 | 6/16/1999 | 6/16/1999 | A | PART |
Carl Dependahl
|
|
|
06/16/99 340 - late am Harvey ###-####, int shear nail ok at E-W wall
|
INSP - Framing/Rough-in | 5/27/1999 | 5/28/1999 | 5/28/1999 | A | PART |
Carl Dependahl
|
|
|
05/28/99 340 - harvey --###-#### hds ok at int wall
|
INSP - Foundation | 4/19/1999 | 4/19/1999 | 4/19/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - INT FTGS/SLAB OK,SOIL TESTED
|
INSP - Framing/Rough-in | 4/14/1999 | 4/19/1999 | 4/18/1999 | P | NR |
Carl Dependahl
|
|
|
04/19/99 340 - HARVEY--###-#### SLAB INSP; awaiting density report, will
|
INSP - Framing/Rough-in | 4/14/1999 | 4/16/1999 | 4/16/1999 | P | NR |
Carl Dependahl
|
|
|
04/16/99 340 - HARVEY ###-#### --SLAB INSP--FLAT WORK; not frame
|
INSP - Foundation | 4/16/1999 | 4/16/1999 | 4/16/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - FND, THICKENED SLAB BELOW MECH AREA OK
|
INSP - Foundation | 4/2/1999 | 4/5/1999 | 4/5/1999 | A | PART |
Carl Dependahl
|
|
|
04/05/99 340 - ###-#### HARVEY//FOUNDATION; discussed bolt locations
|
INSP - Foundation | 4/2/1999 | 4/2/1999 | 4/2/1999 | P | NR |
Carl Dependahl
|
|
|
04/02/99 340 - Harvey ###-#### late pm...nr, will recall when complete
|
INSP - Foundation | 4/1/1999 | 4/1/1999 | 4/1/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - FTG AT INT WALL
|
INSP - Foundation | 3/31/1999 | 3/31/1999 | 3/31/1999 | P | PART |
Carl Dependahl
|
|
|
03/31/99 340 - ###-#### HARVEY//FOOTING, part, remainder ext ftgs ok
|
INSP - Foundation | 3/29/1999 | 3/30/1999 | 3/30/1999 | P | PART |
Carl Dependahl
|
|
|
03/30/99 340 - ###-#### HARVEY//FOOTING rec'd engs letter for 2500# concrete, no spec insp; ftgs ok to pour
|
INSP - Foundation | 3/24/1999 | 3/24/1999 | 3/24/1999 | P | NR |
Carl Dependahl
|
|
|
03/24/99 340 - footing harvy ###-#### complete forms/ compaqtion
|
INSP - Foundation | 3/23/1999 | 3/18/1999 | 3/18/1999 | P | NR |
Carl Dependahl
|
|
|
conf w/ bldr re spec insp
|
INSP - Foundation | 3/11/1999 | 3/11/1999 | 3/11/1999 | P | PART |
Wes Worcester
|
|
|
03/11/99 342 - HARVEY ###-#### caled Carl to go over special inspection
|
(F) Reprint permit | | | 2/9/1999 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/8/1999 | | |
|
|
|
|
Telephone call | | | 2/3/1999 | | |
|
|
|
CALLED PERMIT READY
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/2/1999 | | PASS |
|
|
|
PLAN WAS TAKEN TO THE FRONT DESK 01/20/99, BUT WAS PULLED BACK FOR ADDITIONAL REVISIONS REQUESTED BY THE CONTRACTOR.
|
Routing - PLUMBING | 2/1/1999 | | 2/1/1999 | | PASS |
|
|
|
RESUBMITTED PLANS SEE ACTION A013
|
Routing - PUBLIC WORKS | 1/29/1999 | | 1/29/1999 | | PASS |
|
|
|
RESUBMITTED PLANS SEE ACTION A013
|
Routing - PLANNING | 1/29/1999 | | 1/29/1999 | | PASS |
|
|
|
RESUBMITTED PLANS DRH98-0206 SEE ACTION AO13
|
Plan resubmittals received | | | 1/21/1999 | | |
|
|
|
PLANS TAKEN OF READY STATUS. RECEIVED REVISED CIVIL DRAWINGS. HAD BRIAN M AND LOUISE LOOK AT. I WENT AND GOT ISSUE COPY AND FILE COPY AND PUT IN MY HOLD BOX UNTIL I GET BRIANS APPROVAL, LEE RICE ALSO NEEDS TO SIGN OFF AS WELL AS TEMPRA. KMM 1-22-99 SPOKE WITH MARLENE ABOUT THE ROUGH IN OF A SINK AND DRAIN OWNERS WANT TO PUT IN WAREHOUSE. 1. IF PLANS SUBMITTED BEFORE ISSUANCE, TAKE BACK TO LOUISE AND LEE TO CHECK ( STAMP RESUBS). 2. IF SUBMITTED AFTER ISSUANCE STAMP RESUBS AND GIVE TO INSPECTORS. KMM (THEY CHANGED THE ELEVATION OF THE BUILDING.)
|
CHANGE STATUS TO (P) | | | 1/21/1999 | | FAIL |
|
|
|
APPLICANT IS CHANGING ELEVATIONS
|
Office Staff conference/action | | | 1/21/1999 | | PASS |
|
|
|
gave plans to Kathy M.
|
Plan assigned to (JCM) | 11/10/1998 | | 1/20/1999 | | PASS |
John Menard
|
|
|
|
Routing - PLAN CHECK | 11/18/1998 | | 1/20/1999 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/20/1999 | | PASS |
|
|
|
|
Print Occupancy Form | | | 1/20/1999 | | |
|
|
|
|
Telephone call | | | 1/20/1999 | | |
|
|
|
called permit ready
|
Inspection Record Card- Bld | | | 1/20/1999 | | |
|
|
|
|
Plan resubmittals received | | | 1/19/1999 | | PEND |
|
|
|
RECEIVED RESUBMITTALS FROM ARMSTRONG ARCHITECTS, FORWARDED SAME TO JOHN MENARD. DAR 1/19/99
|
Routing - FIRE | 11/18/1998 | | 11/18/1998 | | PASS |
|
|
|
rec'd fire flow resubmital and hydrant location
|
Routing - FIRE | 11/10/1998 | | 11/13/1998 | | FAIL |
|
|
|
resubmittals did not indicate hydrant or fire flow as requested 7/98
|
Plan assigned to (JML) | 6/23/1998 | | 11/10/1998 | | PEND |
|
|
|
|
Routing - PUBLIC WORKS | 11/9/1998 | | 11/10/1998 | | PASS |
|
|
|
|
Plan resubmittals received | | | 11/9/1998 | | |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEETS A1.0, A2.0, A3.0, A4.0, A5.0, A6.0, A6.1, A6.2, A7.0, S2.0, S3.0. TWO COPIES OF NEW STRUCTURAL CALCULATIONS. TWO COPIES OF FOUNDATION DETAILS, TWO COPIES OF WOOD POST BASE. AND ONE COPY OF COVER LETTER. ROUTED TO JOHN L. KMM
|
Routing - PLANNING | 10/30/1998 | | 11/9/1998 | | PASS |
|
|
|
x-ref. DRH98-0206 for modification.
|
Routing - PLANNING | 6/23/1998 | | 11/6/1998 | | PASS |
|
|
|
ROSS REFERENCE #CUP98-0021DRH98-0062 A staff level modification was done on this application and approval was granted to relocted the structure to the rear of the parcel as per plan. Design Review also reviewed plan and approval is pending, pending their review of the revised plans See 11/9/98 update for DR. TKW
|
Plan resubmittals received | | | 10/30/1998 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 10/30/1998 | | 10/30/1998 | | FAIL |
|
|
|
needs resub arch notified by mail
|
Routing - PLAN CHECK | 7/28/1998 | | 7/28/1998 | | FAIL |
|
|
|
not further action by the applicant until the resubmittal dated 10/30/98
|
Routing - FIRE | 7/21/1998 | | 7/27/1998 | | FAIL |
|
|
|
no hydrants shown
|
Plan Review Completed(1st rev) | | | 7/27/1998 | | FAIL |
|
|
|
UFC, UBC, PW fails
|
Routing - PLAN CHECK | 7/14/1998 | | 7/20/1998 | | FAIL |
|
|
|
sent plan review findings to arch by fax and mail - needs arch response
|
Routing - PLUMBING | 7/14/1998 | | 7/14/1998 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 7/1/1998 | | 7/13/1998 | | FAIL |
|
|
|
WAITING FOR 3 COPIES OF CIVIL SHEETS WITH DRAINAGE CALCS. 6-25-98 RECEIVED 3 COPIES OF CIVIL WITH CALCS. REQUIRES DRAINAGE PLAN REVISION, PER BRIAN MURPHY.
|
Routing - PLANNING | 7/1/1998 | | 7/1/1998 | | PASS |
|
|
|
Approved per revised plans submitted June 30, 1998 contained in file DRH98-0062.
|
Plans ACCEPTED BY PLAN CHECK | | | 6/25/1998 | | PASS |
|
|
|
SEE ACTION A007
|
Plan assigned to (MYS) | 6/22/1998 | | 6/23/1998 | | PASS |
Marlene Southard
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 6/23/1998 | | PEND |
|
|
|
CONTACTED DAVID BLENKER AT ###-#### REQUESTING 3 COPIES OF CIVIL SHEETS WITH CALCS. DAVID STATED THE BUILDING IS BEING CONSTRUCTED UNDER THE 97 CODE AND NOT 94. I AM ROUTING TO P&Z FIRST, AND WILL ROUTE TO PW WHEN I RECEIVE CIVIL SHEETS. JOHN MENARD STATED WE WILL DO ENG. KMM 6-25-98 RECEIVED 3 EXTRA COPIES OF CIVIL SHEETS WITH CALCS. READY FOR PW ROUTING.
|
Plan routing begun/NEW & ADDTN | | | 6/23/1998 | | PEND |
|
|
|
WAITING FOR 3 ADDITIONAL COPIES OF CIVIL SHEETS WITH CALCS.
|
Received Certificate of Value | | | 6/22/1998 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/22/1998 | | |
|
|
|
|
Application received | | | 6/22/1998 | | U |
|
|
|
|
Code Occupancy Approval | | | | | |
|
|
|
|
Routing - PLAN CHECK | 2/1/1999 | | | | |
|
|
|
GAVE BACK TO JOHN M. BOTH COPIES OF PLANS (ISSUE AND OFFICE) AND THE APPROVED REVISED ELEVATION PLANS. KMM
|