DOC - Permit Finaled | 2/27/2001 | 2/27/2001 | 2/27/2001 | P | PASS |
Steven Webb
|
|
|
Added by Inspector: 420 On 2/27/2001 1:27:22 PM
|
INSP - Letter of compliance | 11/24/1998 | 11/24/1998 | 11/24/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#17160.
|
INSP - Letter of compliance | 11/24/1998 | 11/24/1998 | 11/24/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#17160.
|
INSP - Final | 11/24/1998 | 11/24/1998 | 11/24/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - RE-INSP.
|
INSP - Final | 11/20/1998 | 11/23/1998 | 11/23/1998 | P | FAIL |
Russ Owen
|
|
|
11/23/98 407 - GEORGE ###-####
|
INSP - Final | 11/19/1998 | 11/20/1998 | 11/20/1998 | P | FAIL |
Russ Owen
|
|
|
11/20/98 407 - GEORGE ###-####
|
INSP - Energy code compliance | 10/21/1998 | 10/22/1998 | 10/22/1998 | P | FAIL |
Jim Storey
|
|
|
10/22/98 301 - GEORGE ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/Rough-in | 10/21/1998 | 10/22/1998 | 10/22/1998 | P | CANC |
Dave Lightfoot
|
|
|
10/22/98 337 -
|
INSP - Framing/Rough-in | 10/19/1998 | 10/20/1998 | 10/20/1998 | P | FAIL |
Jim Storey
|
|
|
10/20/98 301 - GEORGE ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/Rough-in | 10/16/1998 | 10/19/1998 | 10/19/1998 | A | FAIL |
Jim Storey
|
|
|
10/19/98 301 - george-###-#### for shear nail insp CORR-CORREC-CALL FOR REINSP WHEN COMPLETED grage sheer to be instaled on inside
|
INSP - Foundation | 9/15/1998 | 9/15/1998 | 9/15/1998 | | PART |
Russ Owen
|
|
|
/ / 407 - Basement walls only,approved on site,no rebar shown,however 2 horizontal have neen installed.
|
INSP - Foundation | 9/15/1998 | 9/15/1998 | 9/15/1998 | | PART |
Russ Owen
|
|
|
/ / 407 - Basement walls only,approved on site,no rebar shown,however 2 horizontal have neen installed.
|
INSP - Footings | 9/11/1998 | 9/11/1998 | 9/11/1998 | | PART |
Russ Owen
|
|
|
no plans at site,footings are 16" wide for the basement on called contractor,said he is unable to get the plans out to job rained on,wants to pour at own risk,said he will cal me with plans on site for the other portions of the footings,said the footings at site are as per the approved plans. / / 407 - re-inspection,no one at site called contractor.
|
INSP - Foundation | 9/10/1998 | 9/10/1998 | 9/10/1998 | | NR |
Russ Owen
|
|
|
/ / 407 - no approved plans at the site.
|
Issue PAID IN FULL permit | | | 9/2/1998 | | |
|
|
|
|
Telephone call | | | 8/24/1998 | | PASS |
|
|
|
TALKED TO HELEN AT ###-#### THAT PLANS ARE READY
|
Telephone call | | | 8/7/1998 | | PASS |
|
|
|
talked to helen at ###-#### will pick up
|
testing condition printout | | | 7/15/1998 | | |
|
|
|
|
testing condition printout | | | 7/15/1998 | | |
|
|
|
|
Inspector's copy Bld permit | | | 7/15/1998 | | |
|
|
|
|
Telephone call | | | 7/15/1998 | | |
|
|
|
CALLED HOLTON HOMES
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/15/1998 | | PASS |
|
|
|
OK
|
Inspection Record Card- Bld | | | 7/15/1998 | | |
|
|
|
|
testing condition printout | | | 7/15/1998 | | |
|
|
|
|
testing condition printout | | | 7/15/1998 | | |
|
|
|
|
Inspector's copy Bld permit | | | 7/15/1998 | | |
|
|
|
|
Plan assigned to (338) | 7/14/1998 | | 7/14/1998 | | PASS |
|
|
|
PER T HOGLAND
|
Routing - PLANNING | 6/25/1998 | | 6/25/1998 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 6/23/1998 | | 6/24/1998 | | PASS |
|
|
|
|
Application received | | | 6/23/1998 | | |
|
|
|
|
Plan assigned to (DJO) | 6/23/1998 | | 6/14/1998 | | |
Dan Overy
|
|
|
ASSIGNED TO 338 PER T HOGLAND
|
Routing - PLAN CHECK | 6/25/1998 | | | | PEND |
|
|
|
|