Receive PAYMENT IN FULL | | | 6/16/1999 | | |
|
|
|
|
(F) Reprint permit | | | 5/25/1999 | | |
|
|
|
|
Fee Review-notes | 5/25/1999 | | 5/25/1999 | | DONE |
|
|
|
additional value from subs
|
Permanent Occupancy | | 9/29/1998 | 9/29/1998 | | DONE |
|
|
|
|
Permanent occupancy | | | 9/29/1998 | | PASS |
|
|
|
Perm. Occ. Cert. #7437 issued 9-29-98 to Teriyaki Time.
|
INSP-Final Inspection | 9/24/1998 | 9/28/1998 | 9/28/1998 | A | PASS |
Joe Tawney
|
|
|
09/28/98 406 - jack ###-#### REINSP OK FOR PERM OCC ì
|
INSP - Final | 9/28/1998 | 9/28/1998 | 9/28/1998 | P | PASS |
|
|
|
09/28/98 338 - made ok to occupy by str.
|
INSP - Final | 9/24/1998 | 9/22/1988 | 9/24/1998 | A | |
|
|
|
jack ###-####
|
SUPER- Supervisor's review | 9/23/1998 | 9/23/1998 | 9/23/1998 | | |
|
|
|
1. was approved plan on site. yes 2. was profit meeting conducted. small space not necessary in this case. per inspectors discretion. this is fire inspection.
|
INSP - Final | 9/22/1998 | 9/23/1998 | 9/23/1998 | P | NR |
|
|
|
09/23/98 338 - OTH-OTHER AGENCIES NOT APPROVED
|
INSP-Final Inspection | 9/22/1998 | 9/23/1998 | 9/23/1998 | P | FAIL |
Joe Tawney
|
|
|
09/23/98 406 - jack ###-#### final occupancy FINAL FAIL AIR BAL REPORT MONITOR HOOD SUPPR SYSTEM AT FIRE ALARM PANE
|
INSP - Conference | 9/18/1998 | 9/18/1998 | 9/18/1998 | | PART |
|
|
|
/ / 338 - ON REQUIREMENTS OF THE MEC CODE 507 & 506
|
INSP - Framing/Rough-in | 9/16/1998 | 9/17/1998 | 9/17/1998 | A | PART |
|
|
|
09/17/98 338 - jack ###-#### sizemic bracing need 2 slack wires at the e
|
INSP - Framing/Rough-in | 8/21/1998 | 8/24/1998 | 8/24/1998 | P | PART |
|
|
|
08/21/98 338 - ok to cover with plmg and elec blessing
|
INSP - Framing/Rough-in | 8/21/1998 | 8/24/1998 | 8/24/1998 | A | PART |
|
|
|
08/21/98 338 - JACK ###-#### EARLY AM need 1 more stud in each wall of t
|
INSP - Conference | 8/21/1998 | 8/21/1998 | 8/21/1998 | | PASS |
Alan Hauser
|
|
|
/ / 350 - posted stop work notice til I get permit
|
INSP - Conference | 8/20/1998 | 8/20/1998 | 8/20/1998 | | PASS |
Alan Hauser
|
|
|
/ / 350 - posted notice for hvac to get permit
|
INSP-Final Inspection | 8/19/1998 | 8/19/1998 | 8/19/1998 | P | PASS |
Alan Hauser
|
|
|
08/19/98 350 - fire shaft as per drawings
|
Issue PAID IN FULL permit | | | 8/10/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/10/1998 | | |
|
|
|
|
Print Occupancy Form | | | 8/10/1998 | | |
|
|
|
|
Telephone call | | | 8/10/1998 | | |
|
|
|
CALLED MARK AT ###-#### PERMIT READY
|
Plan assigned to (JML) | 6/26/1998 | | 8/7/1998 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 8/4/1998 | | 8/7/1998 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 8/7/1998 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/7/1998 | | PASS |
|
|
|
|
Plan resubmittals received | | | 8/6/1998 | | |
|
|
|
RECEIVED 2 COPIES OF SHEETS A1.0 AND PLAN REVIEW COMMENTS. ROUTED TO JOHN L.
|
Routing - FIRE | 7/31/1998 | | 8/3/1998 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 7/31/1998 | | 7/31/1998 | | FAIL |
|
|
|
|
Routing - PLUMBING | 7/28/1998 | | 7/31/1998 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 7/23/1998 | | 7/28/1998 | | PASS |
|
|
|
|
Routing Off Site - C.D.H | 6/29/1998 | | 7/23/1998 | | PASS |
|
|
|
CALLED PAT McKEEGAN TO TAKEPLANS TO CDH. RECEIVED A TRANSMITTAL FROM PAT MCKEEGAN WHICH STATED CDH HAD LOST PLANS. PAT SENT 2 ADDITIONAL COPIES OF PLANS TO CDH. WE WILL NEED TO RESTAMP THEM FOR ROUTING. ROUTED TRANSMITTAL TO JOHN L.
|
Plan routing begun/TENANTS | | | 6/26/1998 | | |
|
|
|
Route to CENTRAL DISTRICT HEALTH, PUBLIC WORKS, PLUMBING, PLAN CHECK and FIRE.
|
Plan assigned to (MYS) | 6/23/1998 | | 6/26/1998 | | |
Marlene Southard
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 6/25/1998 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/23/1998 | | PEND |
|
|
|
|
Application received | | | 6/23/1998 | | |
|
|
|
|