Case Summary (BLD) | | | 1/7/2016 | | DONE |
|
|
|
|
DOC - Permit Finaled | 1/17/2001 | 1/17/2001 | 1/17/2001 | P | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 1/17/2001 4:29:26 PM
|
Receive PAYMENT IN FULL | | | 3/16/2000 | | DONE |
|
|
|
|
Fee Review-notes | 12/30/1998 | | 2/8/2000 | | DONE |
|
|
|
additional values from subs lh
|
Permanent occupancy | | | 11/12/1999 | | DONE |
|
|
|
Perm. Occ. Cert. #8007 issued 11-12-99 to the Nazareth Retreat Center.
|
FIRE-Final Inspection | 11/5/1999 | 11/10/1999 | 11/10/1999 | A | PASS |
Rick Jackson
|
|
|
###-#### steven Occupancy approval.
|
BLD-Final | 11/5/1999 | 11/10/1999 | 11/10/1999 | P | FAIL |
Tom Arcoraci
|
|
|
###-#### steven.. Need eng. Ok of hangers and bolts.
|
Permanent Occupancy | | 11/10/1999 | 11/10/1999 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 11/10/1999 | | PASS |
|
|
|
Meets compliance with CUP98-00047- Pass.
It should be noted that they have chosen not to construct the duplex to be used for visiting clergy and caretaker at this time.
|
INSP-Final Inspection | 6/17/1999 | 6/18/1999 | 6/18/1999 | P | FAIL |
Joe Tawney
|
|
|
06/18/99 406 - REINSP FAIL ALARM SYSTEM, FIRE EXT, EMERG LIGHT
|
INSP-Final Inspection | 6/3/1999 | 6/3/1999 | 6/3/1999 | P | FAIL |
Joe Tawney
|
|
|
06/03/99 406 - REINSP FAIL ALARM PLANS, NFPA 72, EMERG LITE, FIRE EXT, D
|
SUPER- Supervisor's review | 4/2/1999 | 4/2/1999 | 4/2/1999 | | PEND |
|
|
|
Status of occupancy.
|
INSP - Framing/Rough-in | 4/1/1999 | 4/2/1999 | 4/2/1999 | P | PART |
Tom Arcoraci
|
|
|
04/02/99 408 - NEED OK FROM ENG ON BOLT AND HANGER ON GLU LAM
|
INSP - Final | 2/22/1999 | 2/23/1999 | 2/25/1999 | A | PART |
Tom Arcoraci
|
|
|
Final - temp. occ. - Steve, ###-#### ok for temp per slane
|
INSP-Alarm Testing | 2/22/1999 | 2/22/1999 | 2/23/1999 | P | PART |
Joe Tawney
|
|
|
02/22/99 406 - life safety ###-#### Gary REINSP OK FOR TEMP OCC ALARM PLANS, NFPA 72, MOVE EXIT SIGN, AIR BALANC
|
INSP - Final | 2/22/1999 | 2/22/1999 | 2/22/1999 | | PART |
Joe Tawney
|
|
|
REINSP OK FOR TEMP OCC
|
INSP-Alarm Testing | 2/18/1999 | 2/19/1999 | 2/19/1999 | A | CANC |
Joe Tawney
|
|
|
02/19/99 406 - kitchen air balance ###-#### Gary CANCEL NOT READY
|
Code Occupancy Approval | | | 2/17/1999 | | FAIL |
|
|
|
This is pretty much a big ole mud hole out here. None of the landscaping requirements and etc. in. New Addition construction - addition of multi-purpose room and kitchen being worked on- the remodel portion of this job cannot be done until occupancy can be gained so they can move personnel out of the area to be remodeled. The 8-u, cottages #1 and #2 BLD98-1955 & BLD98-1956 not started. (Bonding amount of $49,500.00 has been approved for them to bond 110% of all the costs for landscpaing, parking striping, bicycle racks, H/C and etc. and do temporaries on structures as they complete. 2/22/99: Bond for $49,500.00 received by Cathy W. Harriet Lawrence signed temporary.
|
Print Pending Permit.LaserJet4 | | | 2/17/1999 | | PEND |
|
|
|
|
INSP-Final Inspection | 2/16/1999 | 2/16/1999 | 2/16/1999 | P | FAIL |
Joe Tawney
|
|
|
02/16/99 406 - ###-#### FINAL FAIL EXIT SIGNS, AIR BALANCE REPORT, EMERG LIGHT,FIRE EXT
|
INSP - Foundation | 2/5/1999 | 2/5/1999 | 2/5/1999 | P | PASS |
Russ Owen
|
|
|
02/05/99 407 - fnd wall at the north side,for small addition.
|
INSP - Foundation | 2/1/1999 | 2/2/1999 | 2/2/1999 | A | PART |
Russ Owen
|
|
|
02/03/99 407 - special inspection has been done.
|
INSP - Wall cover | 1/25/1999 | 1/26/1999 | 1/26/1999 | A | PASS |
Tom Arcoraci
|
|
|
01/26/99 408 - Scheduled by Hello!. Contact phone is [3717151]. grid ok in multi purpose room
|
INSP - Framing/Rough-in | 1/11/1999 | 1/11/1999 | 1/12/1999 | P | PASS |
Tom Arcoraci
|
|
|
01/11/99 408 - Scheduled by Hello!. Contact phone is [3717151]. shaft for kit ok
|
INSP - Framing/Rough-in | 1/4/1999 | 1/5/1999 | 1/5/1999 | A | PART |
Tom Arcoraci
|
|
|
01/05/99 408 - Scheduled by Hello!. Contact phone is [3717151]. needs shaft inspection
|
INSP - Wall cover | 12/8/1998 | 12/9/1998 | 12/10/1998 | A | PART |
Tom Arcoraci
|
|
|
12/09/98 408 - Scheduled by Hello!. Contact phone is [3717151]. draft stop installed at kitchen wall not on approved plans ok to cover all but kitchen and baths
|
INSP - Framing/Rough-in | 12/4/1998 | 12/7/1998 | 12/7/1998 | A | PASS |
|
|
|
12/07/98 333 - frame ok
|
INSP - Framing/Rough-in | 12/4/1998 | 12/4/1998 | 12/7/1998 | P | FAIL |
Tom Arcoraci
|
|
|
12/04/98 408 - Scheduled by Hello!. Contact phone is [3717151]. this was a conf
|
INSP - Framing/Rough-in | 11/16/1998 | 11/16/1998 | 11/16/1998 | P | PART |
Tom Arcoraci
|
|
|
11/16/98 408 - GARY OLIVER ###-####-ROOF PANEL FOR CODE roof panels meet ubc have ner report
|
INSP - Foundation | 11/4/1998 | 11/5/1998 | 11/6/1998 | A | NR |
Tom Arcoraci
|
|
|
11/05/98 408 - Scheduled by Hello!. Contact phone is [3717164].
|
INSP - Framing/Rough-in | 11/2/1998 | 11/2/1998 | 11/2/1998 | P | FAIL |
Tom Arcoraci
|
|
|
11/02/98 408 - ED WILL BE ON THE JOB CN ISSUED REBAR NOT TIED IN PLACE
|
INSP - Framing/Rough-in | 10/30/1998 | 10/30/1998 | 11/2/1998 | P | PART |
Tom Arcoraci
|
|
|
10/30/98 408 - REBAR INSP per 325 MASONARY INSP ONLY FOR REBAR
|
INSP - Concrete | 10/23/1998 | 10/23/1998 | 10/23/1998 | P | |
Jim Sly
|
|
|
Scheduled by Hello!. Contact phone is [3717144].
|
INSP - Foundation | 10/1/1998 | 10/2/1998 | 10/2/1998 | A | PART |
Russ Owen
|
|
|
10/02/98 407 - poured before inspection. Small section at front left out
|
INSP - Foundation | 9/28/1998 | 9/29/1998 | 9/29/1998 | A | FAIL |
Tom Arcoraci
|
|
|
09/29/98 408 - Scheduled by Hello!. Contact phone is [3717144]. cn issued poured without inspection unknown if special insp was on dite
|
INSP - Foundation | 9/23/1998 | 9/24/1998 | 9/24/1998 | A | PART |
Jim Sly
|
|
|
09/24/98 316 - Footing Pending special insp approval....
|
Issue PAID IN FULL permit | | | 9/23/1998 | | |
|
|
|
|
Telephone call | | | 9/22/1998 | | |
|
|
|
CALLED TOM AT ###-#### PERMIT READY
|
Routing - PLAN CHECK | 9/14/1998 | | 9/21/1998 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 9/21/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/21/1998 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/21/1998 | | PASS |
|
|
|
|
Print Occupancy Form | | | 9/21/1998 | | |
|
|
|
|
Plan assigned to (ADS) | 6/24/1998 | | 9/21/1998 | | PASS |
|
|
|
|
Routing - FIRE | 9/10/1998 | | 9/14/1998 | | PASS |
|
|
|
building separated by pedestrian walkway
|
Plan resubmittals received | | | 9/9/1998 | | |
|
|
|
RECEIVED RESUBMITTALS AND TAKEN TO ARLAN
|
Telephone call | | | 9/8/1998 | | |
|
|
|
Plans Examiner spoke to architect. The addition needs to be treated as a seperate building with a pedestrian walkway to meet water for fire supression requirements. Revisions will be submitted.
|
Routing - PUBLIC WORKS | 8/18/1998 | | 8/21/1998 | | PASS |
|
|
|
|
Routing - FIRE | 8/10/1998 | | 8/17/1998 | | FAIL |
|
|
|
fire flow not acceptable
|
Routing - PLAN CHECK | 7/31/1998 | | 8/7/1998 | | PASS |
|
|
|
|
Plan resubmittals received | | | 8/6/1998 | | \ |
|
|
|
RECEIVED 3 COPIES OF REVISED CIVIL SHEETS. ONE COPY OF REVISED SHEETS A-0.1, C-0, C-1, C-2, C-3, C-4, SD-1.1, L-1, L-2, L-3, L-4, SD-1.2, A-1.1A-2.1, A-3.1, A-4.1, A-4.2, A-5.1, A-6.1, A-6.2, A-6.3, A-7.1, A-7.2, A-8.1, A-9.1, A-9.2, A-10.1, S-1.1 S-1.2, S-2.1, S-2.2, S-2.3, S-3.1, M-1.0, M-1.1, M-1.2, M-1.3, P-1.1, P-2.1, P-2.2 SE-1, E-2, DE-1, E-1, E-3, E-4, E-5, K-1.1, K-1.2, K-1.3, K-1.4 ONE COPY OF LETTER TO FLOYD AND ONE TO ARLAN. ROUTED TO ARLAN S.
|
Telephone call | | | 8/6/1998 | | FAIL |
|
|
|
called arhitect - resubmittal sheets not stamped, need second set.
|
Plan resubmittals received | | | 8/6/1998 | | PEND |
|
|
|
RECEIVED RESUBMITTALS FROM JAMES GLANCY, FORWDED SAME TO ARLAN SMITH.
|
Routing - FIRE | 7/28/1998 | | 7/30/1998 | | FAIL |
|
|
|
fire flow,
|
Plan Review Completed(1st rev) | | | 7/30/1998 | | FAIL |
|
|
|
UBC, UFC and PW issues
|
Routing - PLAN CHECK | 7/22/1998 | | 7/27/1998 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 7/27/1998 | | FAIL |
|
|
|
initial plan review report faxed & Mailed to Architect.
|
Routing - PLUMBING | 7/20/1998 | | 7/22/1998 | | PASS |
|
|
|
|
Routing - PLANNING | 7/16/1998 | | 7/20/1998 | | PASS |
|
|
|
CUP98-0047
|
Routing - PUBLIC WORKS | 7/9/1998 | | 7/15/1998 | | FAIL |
|
|
|
|
Routing Off Site - C.D.H | 7/6/1998 | | 7/9/1998 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 7/6/1998 | | |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 7/2/1998 | | PASS |
|
|
|
7-2-98 RECEIVED 1. THREE ADDITIONAL SETS OF CIVIL SHEETS. 2. DRAINAGE CALCULATIONS ( ON CIVIL SHEET C-1) 3. APPLICATION FOR PERMIT FOR THE COTTAGES 4. REVISED CERTIFICATED OF VALUE FOR THE ADDITION AND REMODEL. 5. TRUSS LOADS 6. LETTER FROM ENGINEER REGARDING SOIL BEARING CAPCITY.
|
Routing Off Site - STRUCTURAL | 6/25/1998 | | 6/25/1998 | | |
|
|
|
ENG. WILL BE DONE INHOUSE PER JOHN M.
|
Plans ACCEPTED BY PLAN CHECK | | | 6/24/1998 | | FAIL |
|
|
|
CONTACTED TOM STONEHOCKER TO LET HIM KNOW THAT I STILL NEED. 1. THREE ADD. CIVIL SHEETS 2. DRAINAGE CALCS. 3. APPLICATIONS FOR THE 2 NEW COTTAGES. 4. REVISED CERT. OF VALUE FOR THE ADDITION 5. TRUSS LOADS- POSSIBLY IN STRUCT. CALCS. 6. SOIL REPORT, OR LETTER FROM ENG. STATING REPORT WAS DONE FOR 1500 PSF. ROUTE TO CDH FIRST
|
Plan assigned to (MYS) | 6/23/1998 | | 6/24/1998 | | |
Marlene Southard
|
|
|
|
Received Certificate of Value | | | 6/23/1998 | | PASS |
|
|
|
|
Application received | | | 6/23/1998 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/23/1998 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 8/23/1998 | | | | |
|
|
|
|