Case Summary (BLD) | | | 6/17/2005 | | DONE |
|
|
|
|
Permanent Occupancy | | 8/31/1999 | 8/31/1999 | | DONE |
|
|
|
|
Permanent Occupancy | | 8/31/1999 | 8/31/1999 | | DONE |
|
|
|
|
INSP - Final | 8/31/1999 | 8/31/1999 | 8/31/1999 | | PASS |
Jim Sly
|
|
|
/ / 316 - FINAL FOR PERM OCC.
|
Permanent occupancy | | | 8/31/1999 | | PASS |
|
|
|
Perm. Occ. Cert. #7878 issued 8-31-99 to TMS, LLC.
|
Code Occupancy Approval | | | 8/30/1999 | | PASS |
|
|
|
Meets compliance per approved Modification.
|
Code Occupancy Approval | | | 8/23/1999 | | |
|
|
|
Final Occupancy requested by Chuck Miller ###-####
|
INSP - Final | 8/12/1999 | 8/13/1999 | 8/13/1999 | A | PART |
Jim Sly
|
|
|
08/13/99 316 - OK for temp Occ...C/N....Need letter of appr special insp
|
Temporary occupancy | | | 8/13/1999 | | PASS |
|
|
|
Temp. Occ. Cert. #3883 issued 8-13-99 to TMS, LLC.
|
INSP-Final Inspection | 8/12/1999 | 8/12/1999 | 8/12/1999 | P | PASS |
Joe Tawney
|
|
|
08/12/99 406 - REINSP OK FOR PERM OCC
|
Code Occupancy Approval | | | 8/12/1999 | | FAIL |
|
|
|
Steel grates still need to be installed (in sidewalk/drainage) - need to get approval from Planning Dept. for all the "rock" around the structure in lieu of sod. 7/21/99 - They are going to submit MOD to DR so they need to bond $4630. for removal of rock, fine grading, upgrade sprinkler system, lay sod. Modification approved - Bonded $1785. for add'l. shrubs, sprinkler heads. They will need to remove tree at the se planter at bldg. because it is over the top of gaslines. Property is in sore need of mowing and litter removal...don't call me back unless this is taken care of as well as the add'l. plants/sprinkler heads.
|
INSP - Framing/Rough-in | 7/29/1999 | 7/29/1999 | 7/29/1999 | P | FAIL |
Jim Sly
|
|
|
07/29/99 316 - No access....Called builder...left message
|
INSP - Final | 7/19/1999 | 7/19/1999 | 7/19/1999 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - REINSP FAIL S/F DAMPERS, RR SIGNS
|
INSP-Final Inspection | 7/15/1999 | 7/15/1999 | 7/15/1999 | P | FAIL |
Joe Tawney
|
|
|
07/15/99 406 - FINAL FAIL DAMPERS, RATED DOORS
|
Code Occupancy Approval | | | 7/8/1999 | | |
|
|
|
Final Occupancy requested by: Chuck Miller ###-####
|
INSP - Energy code compliance | 5/18/1999 | 5/18/1999 | 5/18/1999 | | PASS |
Jim Sly
|
|
|
/ / 316 -
|
INSP - Framing/Rough-in | 5/17/1999 | 5/17/1999 | 5/17/1999 | | PASS |
Jim Sly
|
|
|
/ / 316 -
|
INSP - Framing/Rough-in | 5/11/1999 | 5/11/1999 | 5/11/1999 | P | FAIL |
Jim Sly
|
|
|
05/11/99 316 - Complete prev corr......
|
INSP - Framing/Rough-in | 5/5/1999 | 5/5/1999 | 5/5/1999 | P | FAIL |
Jim Sly
|
|
|
05/05/99 316 - C/N....Compl prev corr notice
|
Fee Review-notes | 2/5/1999 | | 4/23/1999 | | DONE |
|
|
|
|
INSP - Framing/Rough-in | 4/21/1999 | 4/22/1999 | 4/22/1999 | A | FAIL |
Jim Sly
|
|
|
04/22/99 316 - C/N....Corr too many to list
|
INSP-Conference | 4/16/1999 | 4/16/1999 | 4/16/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - CONF WITH CONTR ON LOCATION OF KNOX BOX
|
INSP - Framing/Rough-in | 2/5/1999 | 2/8/1999 | 2/8/1999 | A | PART |
Wes Worcester
|
|
|
02/08/99 342 - shear wall\###-#### chuck front not done, sides ok
|
INSP - Framing/Rough-in | 1/8/1999 | 1/8/1999 | 1/8/1999 | P | FAIL |
Jim Sly
|
|
|
01/08/99 316 - Called for seepage bed insp...called builder to notify we
|
INSP - Foundation | 11/17/1998 | 11/17/1998 | 11/17/1998 | | PART |
Jim Sly
|
|
|
/ / 316 - Found wall OK Pending special insp approval....
|
INSP - Foundation | 11/16/1998 | 11/16/1998 | 11/16/1998 | P | CANC |
Tom Arcoraci
|
|
|
11/16/98 408 - Scheduled by Hello!. Contact phone is [8675068].
|
INSP - Foundation | 11/12/1998 | 11/13/1998 | 11/13/1998 | A | PART |
Jim Sly
|
|
|
11/13/98 316 - Footing OK Pending special insp approval.
|
(F) Reprint permit | | | 8/31/1998 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/28/1998 | | |
|
|
|
|
Telephone call | | | 8/25/1998 | | |
|
|
|
talked to randy will be into pick up permit
|
Print Occupancy Form | | | 8/24/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/24/1998 | | |
|
|
|
|
Plan assigned to (M_P) | 6/24/1998 | | 8/21/1998 | | PASS |
Mike Phillips
|
|
|
08/21/98 14:11:25 M_P - this action updated by action script from <<>> in Case No. BLD98-1858
|
Plan Reviewer's activity | | | 8/21/1998 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 8/21/1998 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/21/1998 | | PASS |
|
|
|
|
Plan resubmittals received | | | 8/18/1998 | | PEND |
|
|
|
RECEIVED RESUBMITTALS FROM ARCHITECTS NORTHWEST, FORWARDED SAME TO MIKE PHILLIPS. DAR
|
Plan resubmittals requested | | | 8/7/1998 | | FAIL |
|
|
|
Requested additional information to be reviewed
|
Plan resubmittals received | | | 8/3/1998 | | PEND |
|
|
|
RECEIVED RESUBSMITTALS FOR MIKE PHILLIPS, FORWARDED SAME TO MIKE.
|
Routing - FIRE | 7/13/1998 | | 7/20/1998 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 7/20/1998 | | FAIL |
|
|
|
UBC issues
|
Print Pending Permit.LaserJet4 | | | 7/10/1998 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 7/10/1998 | | FAIL |
|
|
|
REQUESTED ADDITIONAL INFORMATION TO BE SUBMITTED.
|
Routing - PLUMBING | 7/2/1998 | | 7/8/1998 | | PASS |
|
|
|
|
Routing - PLANNING | 6/29/1998 | | 7/1/1998 | | PASS |
|
|
|
approved per DRH97-0234 and as noted on sht. A-1.0 (which is to adjust handicap parking spaces so that at least one is 16'0" wide, including the loading aisle).
|
Routing - PUBLIC WORKS | 6/25/1998 | | 6/26/1998 | | PASS |
|
|
|
|
Received Certificate of Value | | | 6/25/1998 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 6/25/1998 | | 6/25/1998 | | |
|
|
|
WE WILL BE DOING ENGINEERING IN HOUSE PER JOHN M.
|
Plan routing begun/NEW & ADDTN | | | 6/25/1998 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 6/24/1998 | | PASS |
|
|
|
|
Plan assigned to (MYS) | 6/24/1998 | | 6/24/1998 | | PASS |
Marlene Southard
|
|
|
|
Application received | | | 6/24/1998 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/24/1998 | | PEND |
|
|
|
|