DOC - Permit Finaled | 2/27/2001 | 2/27/2001 | 2/27/2001 | P | PASS |
Steven Webb
|
|
|
Added by Inspector: 420 On 2/27/2001 1:28:55 PM
|
INSP - Letter of compliance | 10/14/1998 | 10/14/1998 | 10/14/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#17376.
|
INSP - Letter of compliance | 10/14/1998 | 10/14/1998 | 10/14/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - LC#17376.
|
INSP - Final | 10/13/1998 | 10/14/1998 | 10/14/1998 | P | PASS |
Russ Owen
|
|
|
10/14/98 407 - JAY ###-#### FN INSP
|
INSP - Energy code compliance | 8/31/1998 | 9/1/1998 | 9/1/1998 | P | PASS |
Russ Owen
|
|
|
09/01/98 407 - jay ###-####
|
INSP - Framing/Rough-in | 8/31/1998 | 9/1/1998 | 9/1/1998 | P | PASS |
Russ Owen
|
|
|
09/01/98 407 - jay ###-####
|
INSP - Wall cover | 8/31/1998 | 8/31/1998 | 8/31/1998 | | PART |
|
|
|
Conference on weather barrier underneath vinyl siding. Contractor is allowed to side with out barrier because entire structure is sheathed w/Sturdi board. Contractor will also supply a stamped engineers response from manufacture deleting the requirements for vapor barrier prior to siding next structure or will provide barrier if unable to obtain engineering.
|
INSP - Wall cover | 8/31/1998 | 8/31/1998 | 8/31/1998 | A | PART |
Russ Owen
|
|
|
/ / 407 - re-insp exterior correction,also left acorrection of wether under vynil siding,per ICBO ner report.
|
INSP - Framing/Rough-in | 8/24/1998 | 8/25/1998 | 8/25/1998 | A | FAIL |
Russ Owen
|
|
|
08/25/98 407 - SHEAR WALL ###-####
|
INSP - Foundation | 7/15/1998 | 7/16/1998 | 7/16/1998 | A | PASS |
Russ Owen
|
|
|
07/16/98 407 - footings ok but front porch will need to be poured out si backs,Contractor has been notified.
|
Issue PAID IN FULL permit | | | 7/14/1998 | | |
|
|
|
|
Telephone call | | | 7/9/1998 | | PASS |
|
|
|
CALLED J&J W/ COMMENTS ON PLANS
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/9/1998 | | PASS |
|
|
|
|
testing condition printout | | | 7/9/1998 | | PASS |
|
|
|
|
CHANGE STATUS TO (R) | | | 7/9/1998 | | PASS |
|
|
|
|
Plan assigned to (340) | 7/9/1998 | | 7/9/1998 | | PASS |
|
|
|
|
Telephone call | | | 7/9/1998 | | PASS |
|
|
|
talked to jay at ###-#### plans are ready
|
Print permit w/o conditions | | | 7/9/1998 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 7/9/1998 | | |
|
|
|
|
Routing - PUBLIC WORKS | 7/1/1998 | | 7/6/1998 | | PASS |
|
|
|
|
Office Staff conference/action | | | 6/30/1998 | | PEND |
|
|
|
sent to Carl
|
Application received | | | 6/29/1998 | | |
|
|
|
|
Routing - PLANNING | 6/29/1998 | | 6/29/1998 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 7/6/1998 | | | | PEND |
|
|
|
|