Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD98-01966
StatusFinaled
Name ARAMARK DELI/PIZZA & BAR
Site Address 3201 AIRPORT WAY
Project NameAIRPORT
Customer Number 
ePlanReviewNo
Description
(ARAMARK DELI/PIZZA & BAR - BOISE AIR TERMINAL) Fire sprinklers are used to substitute for 1-hr fire-resistive construction. To modify an existing 1,764 square foot area within "Concourse B" to be used as a restaurant (including a preparation area) and a bar. Work is to include interior non-bearing walls, millwork, security grills, suspended gypsum board ceilings, suspended lay-in panel ceilings, gypsum board soffits, and (on the ground level) a walk-in refrigerator all per approved drawings and plan review conditions on file. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. PC-446-98 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/20/20036/20/20036/20/2003 DONE
Permanent occupancy  2/16/2000 DONE
Perm. Occ. Cert. #8137 issued 2-16-00 to the Aramark Deli/Pizza & Bar.
BLD-Final2/15/20002/15/20002/15/2000 PASS
DetailsJim Storey
Final ok - approved for occ.
Permanent Occupancy 2/15/20002/15/2000 DONE
Details
Temporary occupancy  1/24/2000 DONE
Temp. Occ. Cert. #3971 issued 1-24-00 to Aramark Deli/Pizza & Bar.
BLD-Final1/20/20001/21/20001/21/2000PCANC
DetailsJim Storey
jame ###-####
FIRE-Final Inspection1/20/20001/21/20001/21/2000PPASS
DetailsRick Jackson
james ###-#### structural going out also pm today
BLD-Final1/19/20001/20/20001/20/2000PCANC
DetailsJim Storey
###-####Gene called and cancelled
FIRE-Final Inspection1/3/20001/4/20001/4/2000AFAIL
DetailsRick Jackson
james ###-####. Door hardware; exiting.
BLD-Final1/3/20001/4/20001/4/2000AFAIL
DetailsJim Storey
james ###-####
BLD-Conference12/8/199912/9/199912/9/1999AFAIL
DetailsJim Storey
JAMES ###-#### PLEASE CALL BEFORE GOING OUT Resubmit for new tenniet changes to plan review.
Recd Pcfee & Taken To Pln CK  12/3/1999 DONE
Receive PAYMENT IN FULL  8/3/1999
Fee Review-notes11/2/1998 4/23/1999 DONE
ADDITIONAL VALUES FROM SUBS
FIRE-Final Inspection1/19/20001/20/20001/20/1999PCANC
DetailsRick Jackson
###-####gene called and cancelled
CHANGE STATUS TO (I)  11/16/1998
INSP - Framing/Rough-in10/29/199811/2/199811/2/1998APASS
DetailsJim Storey
11/02/98 301 - FRAM-OK FRAMING
Issue & PRINT FEE-DUE permit  10/1/1998
Telephone call  8/12/1998 PASS
TALKED TO CARRIE AT ###-#### THAT PLANS ARE READY
Inspection Record Card- Bld  8/11/1998
Print Occupancy Form  8/11/1998
Routing - PLAN CHECK8/11/1998 8/11/1998
PLANS/APPL TAKEN TO FRONT DESK  8/11/1998 PASS
Plan assigned to (CJW)7/7/1998 8/11/1998 PASS
DetailsCarl Westfall
08/11/98 11:11:42 CJW - this action updated by action script from <<>> in Case No. BLD98-1966
Routing - FIRE8/7/1998 8/10/1998 PASS
Routing - PLAN CHECK8/3/1998 8/7/1998
Print permit w/o conditions  8/6/1998
testing condition printout  8/6/1998
Plan Reviewer's activity  8/5/1998 PASS
UBC plan review started August 5, 1998 and finished August 6, 1998. Drawings approved, with conditions, as noted and attached to the drawings.
Routing - PLUMBING7/21/1998 8/3/1998 PASS
Routing - PUBLIC WORKS7/16/1998 7/21/1998 PASS
Routing Off Site - C.D.H7/8/1998 7/16/1998 PASS
CALLED DAVE WARD TO TAKE PLANS TO CDH. PH ###-####
Plan routing begun/TENANTS  7/7/1998
Route to CENTRAL DISTRICT HEALTH, PUBLIC WORKS, PLUMBING, PLAN CHECK and FIRE.
Plans ACCEPTED BY PLAN CHECK  7/7/1998 PASS
Plan assigned to (MYS)7/2/1998 7/7/1998
DetailsMarlene Southard
Application received  7/2/1998
Case Summary (BLD)