Fee Review-notes | 9/24/1998 | | 4/20/1999 | | OK |
|
|
|
|
Permanent occupancy | | | 1/22/1999 | | PASS |
|
|
|
Perm. Occ. Cert. #7601 issued 1-22-99 to Idaho Gastroenteroloy Assoc.
|
INSP - Final | 1/19/1999 | 1/20/1999 | 1/20/1999 | P | PASS |
|
|
|
made ok for perm signed the perm col
|
INSP-Final Inspection | 1/19/1999 | 1/20/1999 | 1/20/1999 | A | PASS |
Rick Jackson
|
|
|
01/20/99 409 - JR ###-#### occ approved
|
Permanent Occupancy | | 1/20/1999 | 1/20/1999 | | DONE |
|
|
|
|
INSP - Final | 1/8/1999 | 1/11/1999 | 1/11/1999 | A | PART |
|
|
|
01/11/99 338 - signed the temp col of the occ req card need hood for the
|
INSP-Final Inspection | 1/8/1999 | 1/11/1999 | 1/11/1999 | A | PART |
Rick Jackson
|
|
|
JR ###-#### NFPA 72; detector for doors on upper floor; elevator shaft has expsoed wood
|
INSP - Final | 1/7/1999 | 1/8/1999 | 1/8/1999 | P | FAIL |
|
|
|
01/08/99 333 - not ready
|
INSP-Final Inspection | 1/7/1999 | 1/8/1999 | 1/8/1999 | P | FAIL |
Rick Jackson
|
|
|
JR ###-#### doors in corridor not complete, retest alarms
|
INSP - Final | 12/29/1998 | 12/30/1998 | 12/30/1998 | A | FAIL |
|
|
|
12/30/98 333 - not ready left note to Jr that its not ready
|
INSP-Final Inspection | 12/22/1998 | 12/22/1998 | 12/22/1998 | P | FAIL |
Rick Jackson
|
|
|
JR ###-#### test generator and alarms; knox box; sprinkler line wrong; label and certify gas; install doors and hardware; extinguishers; penetrations; finish elevator and doors
|
INSP - Framing/Rough-in | 12/4/1998 | 12/4/1998 | 12/4/1998 | P | PART |
|
|
|
12/04/98 333 - ceilings ok all but corridors firestops not done in corri
|
INSP - Framing/Rough-in | 11/30/1998 | 12/1/1998 | 12/1/1998 | A | PART |
|
|
|
12/01/98 333 - conf on ceilings
|
INSP - Framing/Rough-in | 11/19/1998 | 11/19/1998 | 11/19/1998 | P | FAIL |
|
|
|
11/19/98 333 - elevator not complete need cover at landings ok to cover
|
INSP - Framing/Rough-in | 11/5/1998 | 11/5/1998 | 11/6/1998 | P | PART |
Tom Arcoraci
|
|
|
11/05/98 408 - JR ###-#### ok to vover int walls and lid check shaft for gen set
|
INSP-Conference | 11/2/1998 | 11/2/1998 | 11/2/1998 | A | PART |
|
|
|
discussed 1 hr ceiling membrane, advised to present assempbly to structural inspector for review to drop 1 hr celing below services. advise the med gas room ventialtion may not be changed without revising plans. smoke damper in coridor was being installed improperly. showed mech contractor and general.
|
INSP-Sprinkler Rough-in/Hydro | 10/30/1998 | 11/2/1998 | 11/2/1998 | A | CANC |
Joe Tawney
|
|
|
11/02/98 406 - jr ###-#### ceiling reading CANCEL TO BE DONE BY 405
|
INSP - Framing/Rough-in | 10/29/1998 | 10/30/1998 | 10/30/1998 | A | PART |
|
|
|
10/30/98 333 - talked about 1hr wall at entry
|
INSP - Framing/Rough-in | 10/15/1998 | 10/16/1998 | 10/16/1998 | A | PART |
|
|
|
10/16/98 333 - checked on ada per plan
|
SUPER- Supervisor's review | 10/8/1998 | 10/7/1998 | 10/7/1998 | | |
|
|
|
confused about paying double fee claims they could frame without permit. this is not a new shell and core building and no permission to start early was given.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/6/1998 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 10/6/1998 | | PASS |
|
|
|
|
Issue PAID IN FULL permit | | | 10/6/1998 | | |
|
|
|
|
Print Occupancy Form | | | 10/6/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 10/6/1998 | | |
|
|
|
|
Routing - PLAN CHECK | 9/22/1998 | | 10/6/1998 | | PASS |
|
|
|
|
Plan assigned to (R_H) | 7/10/1998 | | 10/6/1998 | | PASS |
|
|
|
10/06/98 13:33:07 R_H - this action updated by action script from <<>> in Case No. BLD98-1998
|
Routing - FIRE | 10/5/1998 | | 10/5/1998 | | PASS |
|
|
|
moved plans out with extensive conditions
|
Plan Reviewer's activity | | | 10/2/1998 | | PEND |
|
|
|
Received correccted plans, still require mechanical engineering for exhaust of emergency generator room. Will route to fire department.
|
Plan resubmittals received | | | 10/2/1998 | | PASS |
|
|
|
RECEIVED TWO COPIES OF M-1 SHEET
|
Plan resubmittals received | | | 9/25/1998 | | |
|
|
|
RECEIVED TWO COPIES OF PLUMB. SHEETS. ROUTED TO RON HILL
|
Plan Reviewer's activity | | | 9/25/1998 | | FAIL |
|
|
|
reviewed resubmited plans, still require correction and more details. Talked to Mechanical designer from TVR (Daron) told him what was required and that the plans needed to stamped and signed by the architect or an engineer, Talked to Mike From BRS, esplained what was needed, faxed Mike the requirement list. Plans were approved 9-24-98 by Plumbing Department.
|
Routing - PLUMBING | 9/24/1998 | | 9/24/1998 | | PASS |
|
|
|
|
Routing - PLUMBING | 9/15/1998 | | 9/23/1998 | | FAIL |
|
|
|
|
Routing - PUBLIC WORKS | 9/10/1998 | | 9/15/1998 | | PASS |
|
|
|
|
Plan resubmittals received | | | 9/10/1998 | | |
|
|
|
RECEIVED RESUBMITTALS AND TAKEN TO RON H.
|
Plan Review Completed(1st rev) | | | 8/26/1998 | | FAIL |
|
|
|
multiple agencies fail
|
Routing - FIRE | 8/20/1998 | | 8/26/1998 | | FAIL |
|
|
|
med gas room not correct
|
Plan Reviewer's activity | | | 8/19/1998 | | FAIL |
|
|
|
Recieved resubmittal, still need more correction and information. Faxed requirements to Mike Capshaw, Will Route to fire department.,
|
Plan Reviewer's activity | | | 7/24/1998 | | FAIL |
|
|
|
Needed more information on plans before I route to fire department. Faxed requested items to Mike Capshaw, and mailed list,of BRS Architects.
|
Routing - PLUMBING | 7/15/1998 | | 7/20/1998 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 7/16/1998 | | PEND |
|
|
|
|
Routing - PUBLIC WORKS | 7/13/1998 | | 7/15/1998 | | FAIL |
|
|
|
REQUIRES PLUMBING DRAWINGS FROM ARCHITECT, PER LOUISE WALDORF.
|
Plan assigned to (MYS) | 7/7/1998 | | 7/10/1998 | | |
Marlene Southard
|
|
|
|
Plan routing begun/TENANTS | | | 7/10/1998 | | |
|
|
|
Route to PUBLIC WORKS, PLUMBING, PLAN CHECK and FIRE.
|
Recd Pcfee & Taken To Pln CK | | | 7/7/1998 | | |
|
|
|
|
Application received | | | 7/7/1998 | | |
|
|
|
|