Case Summary (BLD) | | | 2/18/2004 | | |
|
|
|
|
Fee Review-notes | 9/24/1998 | | 12/15/1998 | | |
|
|
|
|
INSP - Final | 12/4/1998 | 12/4/1998 | 12/4/1998 | P | PASS |
Carl Dependahl
|
|
|
joe ###-#### fn occ insp...ok, card to contractor.
|
Permanent Occupancy | | 12/4/1998 | 12/4/1998 | | DONE |
|
|
|
|
Permanent occupancy | | | 12/4/1998 | | PASS |
|
|
|
Perm. Occ. Cert. #7525 issued 12-4-98 to Davies & Rourke.
|
INSP - Final | 12/3/1998 | 12/3/1998 | 12/3/1998 | P | FAIL |
Carl Dependahl
|
|
|
keep c/n, rec'd arch's letter re exit signs, ok. still need code enforcement ok
|
Code Occupancy Approval | | | 12/3/1998 | | PASS |
|
|
|
Signed final on project.
|
INSP - Final | 11/30/1998 | 12/1/1998 | 12/1/1998 | A | CANC |
Russ Owen
|
|
|
12/01/98 407 - TRANS TO CARL .D
|
INSP - Final | 12/1/1998 | 12/1/1998 | 12/1/1998 | P | FAIL |
Carl Dependahl
|
|
|
need P&Z ok, install temp glass & all signage (exit, accessible, etc.) OK for T/O, card to contractor.
|
INSP - Final | 11/30/1998 | 11/30/1998 | 11/30/1998 | P | FAIL |
Carl Dependahl
|
|
|
joe 870 4930...question re final insp...need plbg, install temp glazing. not complete insp.
|
INSP-Final Inspection | 11/27/1998 | 11/27/1998 | 11/27/1998 | A | PASS |
Rick Jackson
|
|
|
occ approved
|
INSP - Final | 11/25/1998 | 11/27/1998 | 11/27/1998 | P | NR |
Wes Worcester
|
|
|
11/27/98 342 - JOE ###-####
|
INSP-Final Inspection | 11/25/1998 | 11/25/1998 | 11/25/1998 | A | FAIL |
Rick Jackson
|
|
|
address; mount extinguishers
|
Temporary occupancy | | | 11/25/1998 | | PEND |
|
|
|
Temporary occupancy signed.
|
INSP - Framing/Rough-in | 10/27/1998 | 10/28/1998 | 10/28/1998 | A | PART |
Carl Dependahl
|
|
|
joe ###-#### ok to cover shear walls ok
|
INSP - Framing/Rough-in | 10/27/1998 | 10/27/1998 | 10/27/1998 | A | PART |
Carl Dependahl
|
|
|
conf only, re c/n 10-26-98.
|
INSP - Framing/Rough-in | 10/23/1998 | 10/26/1998 | 10/26/1998 | P | FAIL |
Carl Dependahl
|
|
|
JOE ###-####,c/n, need eng's report for trusses cut, fireblocks, temp glazing at doors, etc. ok to insul
|
INSP - Conference | 10/22/1998 | 10/22/1998 | 10/22/1998 | | PASS |
Alan Hauser
|
|
|
/ / 350 - called to see if hvac had permit, they did
|
INSP - Framing/Rough-in | 10/15/1998 | 10/15/1998 | 10/15/1998 | P | PART |
Carl Dependahl
|
|
|
carpentry only; met w/ super, need all shear panels installed per eng'd plan.
|
INSP - Framing/Rough-in | 10/13/1998 | 10/13/1998 | 10/13/1998 | P | FAIL |
Carl Dependahl
|
|
|
not complete frame, carpentry only; has detail for alternate brg at int wall (pony wall on spead ftg shares load w/ stem wall.) need truss eng's detail for trusses to be cut/trimmed at brg
|
INSP - Framing/Rough-in | 10/12/1998 | 10/12/1998 | 10/12/1998 | P | FAIL |
Carl Dependahl
|
|
|
conf only w/ super re truss bracing....need lateral braces in lieu of hard lid. verbal c/n.
|
INSP - Framing/Rough-in | 10/8/1998 | 10/8/1998 | 10/8/1998 | P | NR |
Carl Dependahl
|
|
|
CARPENTRY ONLY, SPOKE W/ FRAMER. NEED ENG'S REPORT PRIOR TO COMPLETE FRAME INSP.
|
INSP - Foundation | 10/5/1998 | 10/5/1998 | 10/5/1998 | P | PART |
Carl Dependahl
|
|
|
met w/ framer...need eng's design for change in brg at strip ftg rather than isolated pads (roof/wall loads). wip/ carpentry insp only.
|
INSP - Framing/Rough-in | 9/22/1998 | 9/22/1998 | 9/22/1998 | P | PART |
Carl Dependahl
|
|
|
joe/ beniton constr; floor framing: verbal to strap pony walls...still need eng'g report for change in brg locations from pads to pony wall.
|
INSP - Framing/Rough-in | 9/17/1998 | 9/17/1998 | 9/17/1998 | P | PART |
Carl Dependahl
|
|
|
joe ###-#### partial insp...FLOOR FRAMING...NEED ENG'S DESIGN FOR ADD'L BEARING PONY WALL IN LIEU OF PIERS/SADDLES...WORK LOOKS OK. SUPT. WILL PROVIDE (HAS?) INFO.
|
INSP - Concrete | 9/11/1998 | 9/11/1998 | 9/11/1998 | P | PART |
Carl Dependahl
|
|
|
conf w/ wes re eng'd resubmittal...he approved ftg pour
|
INSP - Foundation | 9/10/1998 | 9/10/1998 | 9/10/1998 | A | NR |
Carl Dependahl
|
|
|
conf only ...w/ Bruce Poe , arch
|
INSP - Foundation | 9/10/1998 | 9/10/1998 | 9/10/1998 | P | PASS |
Wes Worcester
|
|
|
09/10/98 342 - TIM ###-####
|
INSP - Foundation | 9/9/1998 | 9/9/1998 | 9/9/1998 | P | NR |
Carl Dependahl
|
|
|
conf only...w/ arch, resubmittal
|
INSP - Foundation | 9/8/1998 | 9/8/1998 | 9/8/1998 | P | NR |
Carl Dependahl
|
|
|
conf only...rec'd add'l resub re roof framing/found. modifications. Discussed w/ Jon Levien.
|
INSP - Foundation | 9/8/1998 | 9/8/1998 | 9/8/1998 | | PART |
Wes Worcester
|
|
|
09/08/98 342 - need engineering for change of 4 sq ft from 9 sq ft pier
|
INSP - Foundation | 9/4/1998 | 9/8/1998 | 9/8/1998 | A | PART |
Wes Worcester
|
|
|
09/08/98 342 - tim ###-####
|
Plan resubmittals requested | | | 9/8/1998 | | PART |
|
|
|
add'l changes, need eng's ok for modifications to brg points/pads as built.
|
INSP - Foundation | 9/3/1998 | 9/3/1998 | 9/3/1998 | | PASS |
Wes Worcester
|
|
|
/ / 342 - went bk at 11 am
|
INSP - Foundation | 9/3/1998 | 9/3/1998 | 9/3/1998 | P | NR |
Wes Worcester
|
|
|
09/03/98 342 - tim ###-####
|
Plan resubmittals received | | | 9/3/1998 | | PART |
|
|
|
rec'd new fnd plan...need roof framing to justify
|
Plan resubmittals received | | | 9/3/1998 | | PEND |
|
|
|
RECEIVED RESUBMITTALS FROM BRUCE POE, FORWARDED SAME TO CARL DEPENDAHL.
|
INSP - Foundation | 9/2/1998 | 9/2/1998 | 9/2/1998 | A | NR |
Carl Dependahl
|
|
|
conf only w/ Bruce Poe...will send roof diagram for previous resubmittal.
|
Plan resubmittals requested | | | 9/1/1998 | | PEND |
|
|
|
need roof framing & modifications to fnd.
|
INSP - Foundation | 8/31/1998 | 8/31/1998 | 8/31/1998 | P | PEND |
Carl Dependahl
|
|
|
conf only w/ John Levein re fnd resubmittal. Need roof framing diagram for full review.
|
INSP - Foundation | 8/31/1998 | 8/31/1998 | 8/31/1998 | P | PEND |
Carl Dependahl
|
|
|
requested roof diagram from Doug Tamura to attach to fnd resub.
|
INSP - Foundation | 8/27/1998 | 8/28/1998 | 8/28/1998 | A | PASS |
Wes Worcester
|
|
|
08/28/98 342 - joe ###-####
|
INSP - Foundation | 8/27/1998 | 8/27/1998 | 8/27/1998 | P | NR |
Carl Dependahl
|
|
|
conf only...no spec insp req'd; resubmittal ok for foundation
|
INSP - Foundation | 8/26/1998 | 8/27/1998 | 8/27/1998 | A | FAIL |
Wes Worcester
|
|
|
08/27/98 342 - rebar in dirt ì
|
INSP - Foundation | 8/25/1998 | 8/26/1998 | 8/27/1998 | P | PART |
Wes Worcester
|
|
|
08/26/98 342 - footing as close to 3:30pm joe ###-####
|
INSP - Foundation | 8/26/1998 | 8/26/1998 | 8/26/1998 | A | NR |
Carl Dependahl
|
|
|
conf only, rec'd reusubmittal for fnd; chk'd vault for original plans
|
INSP - Foundation | 8/25/1998 | 8/26/1998 | 8/26/1998 | A | NR |
Wes Worcester
|
|
|
08/26/98 342 - FOOTING--###-#### JOE
|
(F) Reprint permit | | | 8/26/1998 | | |
|
|
|
|
Plan resubmittals received | | | 8/26/1998 | | PEND |
|
|
|
RECEIVED RESUBMITTALS FROM TAMURA AND ASSOCIATES, FORWORDED SAME TO CARL DEPENDAHL.
|
INSP - Foundation | 8/25/1998 | 8/25/1998 | 8/25/1998 | P | NR |
Carl Dependahl
|
|
|
conf only...w/ Bruce Poe, project arch.
|
Issue PAID IN FULL permit | | | 8/25/1998 | | |
|
|
|
|
Telephone call | | | 8/18/1998 | | PASS |
|
|
|
TALKED TO BRUCE POE AT ###-#### THAT PLANS ARE READY
|
Print Pending Permit.LaserJet4 | | | 8/13/1998 | | PASS |
|
|
|
|
Print Occupancy Form | | | 8/13/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/13/1998 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/13/1998 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 8/12/1998 | | 8/12/1998 | | PASS |
|
|
|
|
Routing - PLANNING | 8/11/1998 | | 8/12/1998 | | PASS |
|
|
|
A master landscape plan is still required to be approved by Planning.
|
Plan assigned to (JML) | 7/10/1998 | | 8/12/1998 | | PASS |
|
|
|
|
Plan resubmittals received | | | 8/7/1998 | | |
|
|
|
RECEIVED * TWO COPIES OF SUPPLEMENTAL STRUCTURAL CALCULATIONS. TWO SETS OF DRAWINGS WITH PLAN REVIEW MODIFICATIONS CLOUDED. LETTER OF RESPONSE TO PLAN REVIEW COMMENTS. ROUTED TO JOHN L.
|
Routing - PLUMBING | 7/29/1998 | | 8/4/1998 | | PASS |
|
|
|
|
Plan resubmittals received | | | 7/28/1998 | | |
|
|
|
RECEIVED 2 COPIES OF SHEETS P1.O ROUTED TO JOHN L. KMM
|
Plan Review Completed(1st rev) | | | 7/27/1998 | | FAIL |
|
|
|
UBC issues
|
Routing - FIRE | 7/24/1998 | | 7/27/1998 | | PASS |
|
|
|
field to check haz mat list. Defer rating of corridors to UBC staff
|
Plan Reviewer's activity | | | 7/24/1998 | | FAIL |
|
|
|
I met with Bruce Poe here regarding the inclusion of the corridor in the occupant load and the impact on the corridor construction requirements. In my prelim. meeting w/ John Price I did not say to exclude the corridor according to my notes.
|
Routing - PLAN CHECK | 7/21/1998 | | 7/24/1998 | | FAIL |
|
|
|
needs resub but final review is waiting for staff decision on occupant load.
|
Routing - PLUMBING | 7/20/1998 | | 7/21/1998 | | FAIL |
|
|
|
|
Routing - PLANNING | 7/17/1998 | | 7/17/1998 | | FAIL |
|
|
|
Still need to submit revised plans per Design Review conditions of approval (DRH98-0105).
|
Routing - PUBLIC WORKS | 7/10/1998 | | 7/17/1998 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 7/10/1998 | | PASS |
|
|
|
SPOKE WITH BRUCE POE HE WILL BRING OVER STRUCT. CALCS. 7-13-98 RECEIVED STRUCT. CALCS.
|
Routing Off Site - STRUCTURAL | 7/10/1998 | | 7/10/1998 | | PASS |
|
|
|
ENG. WILL BE DONE IN HOUSE PER JOHN L.
|
Plan assigned to (MYS) | 7/8/1998 | | 7/10/1998 | | |
Marlene Southard
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 7/10/1998 | | PASS |
|
|
|
WAITING FOR STRUC. CALCS. BUT WILL ROUTE TO PW RECEIVED STRUCT. CALCS. 7-13-98
|
Recd Pcfee & Taken To Pln CK | | | 7/8/1998 | | |
|
|
|
|
Received Certificate of Value | | | 7/8/1998 | | PASS |
|
|
|
|
Application received | | | 7/8/1998 | | |
|
|
|
|