Permit Information
Permit NumberBLD98-02047
StatusFinaled
Name KASNEY JOSEPH H & SHIRLEY D
Site Address 2135 S COLORADO AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
TO ADD A 707 SF ADDITION AND INSTALL NEW ENGINEERED TRUSS ROOF SYSTEM AT AN EXISTING SFD. WORK INCLUDES NEW WINDOWS, VINYL SIDING, AND NEW SHEETROCK AS NEEDED. SEPARATE PLBG, HTG, AND ELEC. PERMITS REQ'D. SMOKE DET'S. THROUGHOUT PER UBC 310.9 (BATTERY OK AT EXISTING). 340CD.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/9/20048/9/20048/9/2004PPASS
DetailsJim Storey
joe; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
DOC - Permit Finaled8/9/20048/9/20048/9/2004PPASS
DetailsJim Storey
Finaled by inspector at 8/9/2004 2:27:11 PM
BLD-Conference4/6/20044/7/20044/7/2004PPART
DetailsJim Storey
joe; Phone #: ###-#### Internet Inspection Request from: Annette Moore joe; Phone #: appointment with 301 at 400pm via 301.###-#### Internet Inspection Request from: Annette Moore 4/6/2004 2:58:30 PM landing out back door perimter insulation. wh berrior post/tape wall ceilling at garage. 4/7/2004 4:52:05 PM
CHANGE STATUS TO (ISS)  4/6/2004  
per george slane 3/31/2004
BLD-Conference10/27/200310/28/200310/28/2003PDONE
DetailsSteven Webb
joseph ###-#### Reviewed requirements for achieving a building final. Informed permitee to get mechanical final, fire and life safe done, insulate crawl stem walls and rim joist, landings at exterior door, handrails etc and call for building final. 10/28/2003 2:21:55 PM
BLD - Request for Extension5/12/20035/14/20035/14/2003APASS
DetailsJim Storey
###-#### shirley ###-#### shirley wip 5/14/2003 10:08:16 AM
PostCard Mailed  5/10/2003 SENT
PostCard has been mailed requesting inspection.
CHANGE STATUS TO (ISS)  3/31/2003  
Work still in progess ok to extend per George Slane
BLD-Conference11/4/200211/4/200211/4/2002 DONE
per jim storey work in progress
BLD-Conference11/15/200111/15/200111/15/2001 DONE
slow progress.
BLD-Conference5/16/20015/18/20015/18/2001APASS
DetailsJim Storey
conference to extend permit ###-#### called phone number not the corect number stopped at the site and could see that work is in progess with trim out and taping of gyp. 5/18/2001 9:41:46 AM
BLD-Conference12/27/200012/27/200012/27/2000 PASS
TO EXTEND PERMIT
BLD-Conference5/19/20005/19/20005/19/2000APART
DetailsJim Storey
extension on permit.
BLD-Energy code compliance12/10/199912/13/199912/13/1999APASS
DetailsRuss Owen
Mike ###-####
BLD-Framing/Rough-in12/3/199912/6/199912/6/1999APASS
DetailsJim Storey
MECH IS ALSO SCHEDULED MIKE ###-####
INSP - Framing/Rough-in4/9/19994/12/19994/12/1999APART
DetailsJim Storey
04/12/99 301 - roof systiem ok
INSP - Framing/Rough-in4/1/19994/2/19994/2/1999PFAIL
DetailsJim Storey
04/02/99 301 - Scheduled by Hello!. Contact phone is [3850214].
INSP - Framing/Rough-in4/1/19994/1/19994/1/1999PNR
DetailsJim Storey
04/01/99 301 - conf only
SUPER- Supervisor's review2/4/19992/4/19992/4/1999 FAIL
Truss and framing review w/Jim Storey and truss manufacturer.
INSP - Framing/Rough-in1/25/19991/27/19991/28/1999PFAIL
DetailsJim Storey
01/27/99 301 - joe- ###-#### home -homeowner call 1st before insp-roof & wall HAVE TRUSS ENGINEER MEET 301 ON SITE.
SUPER- Supervisor's review1/21/19991/21/19991/21/1999 PEND
Conference on permit status.
INSP - Foundation7/29/19987/29/19987/29/1998 PART
DetailsJim Storey
07/28/98 301 - footing/ lynn ###-#### cel ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED ok to cover will check upon r for wall insp.
Application received  7/10/1998
Issue PAID IN FULL permit  7/10/1998
PLANS/APPL TAKEN TO FRONT DESK  7/10/1998 PASS
CHANGE STATUS TO (R)  7/10/1998 PASS
Inspection Record Card- Bld  7/10/1998
Plan assigned to (340)7/10/1998 7/10/1998 PASS