INSP - Final | 1/22/1999 | 1/25/1999 | 1/25/1999 | A | PASS |
Wes Worcester
|
|
|
01/25/99 342 - robert head- ###-#### fn occ insp
|
INSP - Final | 1/21/1999 | 1/22/1999 | 1/22/1999 | P | FAIL |
Wes Worcester
|
|
|
01/22/99 342 - ROBERT ###-#### FINAL OCC no answer, unknown access, left
|
INSP - Final | 1/7/1999 | 1/7/1999 | 1/8/1999 | P | FAIL |
Wes Worcester
|
|
|
Robert Head ###-#### per 338, bcec, other inspections, clean crawl
|
INSP - Framing/Rough-in | 10/21/1998 | 10/22/1998 | 10/23/1998 | A | PASS |
|
|
|
10/22/98 333 - ROBERT HEAD-###-#### FR & INSULATION INSP FRAM-OK FRAMING
|
INSP - Framing/Rough-in | 10/19/1998 | 10/20/1998 | 10/20/1998 | A | PART |
Wes Worcester
|
|
|
10/20/98 342 - DON ###-#### CALL FIRST
|
INSP - Framing/Rough-in | 10/16/1998 | 10/16/1998 | 10/16/1998 | | PART |
Wes Worcester
|
|
|
10/16/98 342 - robert ###-#### conference at 1:30-2:00
|
SUPER- Supervisor's review | 10/14/1998 | 10/14/1998 | 10/14/1998 | | FAIL |
|
|
|
Winding stairs not as per code left current newsletter on site and contacted robert w/summerset.
|
INSP - Framing/Rough-in | 10/12/1998 | 10/12/1998 | 10/13/1998 | P | PART |
Wes Worcester
|
|
|
10/13/98 342 - DONALD ###-#### SHEARNAIL
|
INSP - Framing/Rough-in | 10/8/1998 | 10/8/1998 | 10/8/1998 | P | FAIL |
Wes Worcester
|
|
|
10/08/98 342 - ROBERT ###-#### SHEAR WALL 8am apt, not nailed off, not hdr bracing not in, sheathing membrane broken
|
INSP - Framing/Rough-in | 10/6/1998 | 10/6/1998 | 10/6/1998 | P | PART |
Wes Worcester
|
|
|
10/06/98 342 - robert ###-#### conference
|
INSP - Framing/Rough-in | 10/6/1998 | 10/6/1998 | 10/6/1998 | P | NR |
Carl Dependahl
|
|
|
conf only w/ Bob, owner; need resubmittal clarifying duplex only const: minimum (1) 1hr wall & draft stop to deck
|
INSP - Wall cover | 9/25/1998 | 9/25/1998 | 9/25/1998 | | PASS |
|
|
|
1hr walls in attic.
|
INSP - Framing/Rough-in | 9/25/1998 | 9/25/1998 | 9/24/1998 | P | PART |
|
|
|
09/25/98 333 - firewall ok
|
INSP - Wall cover | 9/22/1998 | 9/22/1998 | 9/22/1998 | | PASS |
|
|
|
Sheeyrock nailing and fireblock installation of 2 1hr walls.
|
INSP - Framing/Rough-in | 9/22/1998 | 9/22/1998 | 9/22/1998 | A | NR |
Wes Worcester
|
|
|
09/22/98 342 - don slynn-###-#### for fire wall insp-
|
INSP - Framing/Rough-in | 9/22/1998 | 9/22/1998 | 9/22/1998 | | PART |
Wes Worcester
|
|
|
09/22/98 342 - Bob A inspected
|
SUPER- Supervisor's review | 9/18/1998 | 9/18/1998 | 9/18/1998 | | PEND |
|
|
|
Conference on winding stair requirements and mechanical room clearances.
|
INSP - Wall cover | 9/14/1998 | 9/14/1998 | 9/14/1998 | P | PART |
Wes Worcester
|
|
|
09/14/98 342 - RON ###-#### FIRE WALL INSPECTION
|
INSP - Foundation | 8/24/1998 | 8/24/1998 | 8/25/1998 | P | CANC |
Tom Arcoraci
|
|
|
08/24/98 408 - ###-#### dwayne footing DONE BY 342
|
Telephone call | | | 8/12/1998 | | FAIL |
|
|
|
an answer
|
Issue PAID IN FULL permit | | | 8/12/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/11/1998 | | |
|
|
|
|
testing condition printout | | | 8/11/1998 | | PASS |
|
|
|
|
CHANGE STATUS TO (R) | | | 8/10/1998 | | PASS |
|
|
|
|
testing condition printout | | | 8/10/1998 | | PASS |
|
|
|
|
Plan assigned to (340) | 8/6/1998 | | 8/10/1998 | | PASS |
|
|
|
|
Print permit w/o conditions | | | 8/10/1998 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/10/1998 | | PASS |
|
|
|
|
Plan assigned to (DJO) | 7/10/1998 | | 8/10/1998 | | PASS |
Dan Overy
|
|
|
08/10/98 15:18:29 340 - this action updated by action script from <<>> in Case No. BLD98-2053
|
Telephone call | | | 8/7/1998 | | PASS |
|
|
|
CALLED BLDR...ENG'G REQ'D IN LIEU OF WALL BRACING, OK TO SUBMIT AFTER PLAN ISSUED. READY ASAP W/ PERMIT (MON. OR TUES.)
|
Telephone call | | | 8/7/1998 | | PASS |
|
|
|
CALLED BOB HEAD, BUILDER, NEED ENG'G...WILL PROVIDE AFTER PERMIT ISSUED...NOTED ON PLAN
|
Routing - PLANNING | 7/13/1998 | | 7/13/1998 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 7/10/1998 | | 7/13/1998 | | PASS |
|
|
|
|
Application received | | | 7/10/1998 | | |
|
|
|
|
Routing - PLAN CHECK | 7/14/1998 | | | | PEND |
|
|
|
|