Case Summary (BLD) | | | 7/2/2013 | | DONE |
|
|
|
|
INSP - Final | 11/5/1998 | 11/6/1998 | 11/6/1998 | A | PASS |
Russ Owen
|
|
|
PHILLIP ALLEN-###-#### OFFICE -FN INSP-2ND FLOOR-VOICE PAGER ###-####
|
INSP-Sprinkler Rough-in/Hydro | 11/5/1998 | 11/6/1998 | 11/6/1998 | A | CANC |
Joe Tawney
|
|
|
11/06/98 406 - PHILLIP ###-#### OFF-FN? INSP-VOICE PAGER-###-#### CANCEL TO BE DONE BY 405
|
Application received | | | 11/5/1998 | | |
|
|
|
|
INSP - Framing/Rough-in | 9/15/1998 | 9/15/1998 | 9/15/1998 | P | PASS |
Jim Storey
|
|
|
09/15/98 301 - phillip ###-#### FRAM-OK FRAMING
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/26/1998 | | PASS |
|
|
|
Took revised permit to Linda Hartwell to assist in redistribution of the fees collected and to issue.
|
Fee Review-notes | 8/26/1998 | | 8/26/1998 | | FEES |
|
|
|
this was split into two permits. no fees on bld98-2618. this permit fees cover the fees because of value split. lh
|
CHANGE STATUS TO (I) | | | 8/26/1998 | | |
|
|
|
|
Print Occupancy Form | | | 8/26/1998 | | |
|
|
|
|
Print Occupancy Form | | | 8/26/1998 | | |
|
|
|
|
Plan resubmittals received | | | 8/25/1998 | | PASS |
|
|
|
Plan resubmittals received on 8/17/98 to split the 1 tenant space into 2 spaces. The other tenant space is to be occupied by the tenant Conversion Training.
|
Issue PAID IN FULL permit | | | 8/17/1998 | | |
|
|
|
|
Telephone call | | | 8/14/1998 | | MESS |
|
|
|
LEFT MESSA AT ###-#### THAT PLANS ARE READY
|
Plan assigned to (MYS) | 7/17/1998 | | 8/13/1998 | | PASS |
Marlene Southard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/13/1998 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 8/13/1998 | | |
|
|
|
|
Received Certificate of Value | | | 7/20/1998 | | PEND |
|
|
|
REQUESTED A SIGNED CERT. OF VALUE
|
Application received | | | 7/17/1998 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/17/1998 | | |
|
|
|
|