Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD98-02163
StatusExpired
Name ALLEN QUINTERI
Site Address 300 W FORT ST
Project NameSCHOOL
Customer Number 
ePlanReviewNo
Description
BOISE HIGH SCHOOL BASEBALL FIELD AT FORT BOISE * THE WORK INCLUDES RECONFIGURING AND REHABILITATING EXISTING AREA INTO A BALL FIELD COMPLETE WITH FENCING, TWO STORY 827 SQ. FT., TYPE VN, CONCESSIONS BUILDING WITH RESTROOMS AND PRESSBOX ON SECOND FLOOR, DUGOUTS, CONCRETE PAVING, LANDSCAPING, AND INSTALLATION OF A LAWN SPRINKLER SYSTEM. PC#497-98 FIRST FLOOR OF CONCESSION IS 525 SQ. FT. WITH SECOND FLOOR AT 302 SQ. FT. NO SPECTATOR SEATING IS INCLUDED WITH THIS PERMIT.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Receive PAYMENT IN FULL  5/18/1999
(F) Reprint permit  4/28/1999
Fee Review-notes1/15/1999 4/28/1999
CONNELLY CONST. FAXED CONTRACT VALUE WENT UP LH
Fee Review-notes10/27/1998 4/28/1999
INSP - Framing/Rough-in11/23/199811/24/199811/24/1998ANR
Details
11/24/98 333 - frame not ready
INSP - Wall cover10/2/199810/5/199810/5/1998AFAIL
DetailsJim Storey
10/05/98 301 - cmu walls randy ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED cmu gruted with out insp have special insp. verify bar location.
INSP - Foundation9/18/19989/18/19989/18/1998PPART
DetailsJim Storey
09/18/98 301 - special insp on site pending report slip form cason pour.
INSP - Foundation9/16/19989/17/19989/17/1998AFAIL
DetailsJim Storey
09/17/98 301 - Scheduled by Hello!. Contact phone is [9392822]. insp allready done c/n posted by wes w.
Issue PAID IN FULL permit  9/8/1998
PLANS/APPL TAKEN TO FRONT DESK  9/1/1998 PASS
Inspection Record Card- Bld  9/1/1998
Print Occupancy Form  9/1/1998
Telephone call  9/1/1998 PASS
steve ###-####
Plan assigned to (MLO)7/20/1998 9/1/1998 PASS
DetailsMike Otto
Routing - PUBLIC WORKS8/28/1998 8/31/1998 PASS
Plan Review Completed(1st rev)  8/24/1998 FAIL
PW issues
Routing - FIRE8/19/1998 8/24/1998 PASS
Routing - PLAN CHECK8/12/1998 8/19/1998 PASS
Routing - PLANNING8/11/1998 8/12/1998 PASS
Routing - PLUMBING8/10/1998 8/11/1998 PASS
Routing - PARKS DEPARTME7/23/1998 8/7/1998 PASS
PUT A CALL INTO MARK DOOLEY OF PARKS AND REC. TO SEE IF HE NEEDS TO SIGN OFF ON PLANS. MARK DOOLEY REQUESTED TO SEE PLANS, WILL ROUTE TO MARK AFTER PW
Routing - PUBLIC WORKS7/20/1998 7/22/1998 FAIL
BRIAN LOOKED AT PLANS AND REQUESTED DRAINAGE CALCS. AND SPOKE WITH MIKE HUFFAKER ABOUT THIS NEED. BRIAN REQUESTED I ROUTE TO HIM NOW BECAUSE HE WILL BE GONE THE WEEK OF 7-27 THRU 7-23 ROUTE TO PARKS WHEN DONE WITH PW BRIAN FAILED PLANS AND REQUESTED A LETTER AND DRAINAGE CACULATIONS.
Plan routing begun/NEW & ADDTN  7/20/1998
Routing Off Site - C.D.H6/22/1998 7/20/1998 PASS
CAROL HAD APPROVED PAPER WORK WITH PLANS WHEN CSHQA SUBMITTED. STEVE SIGNED OFF ON PLANS FOR CAROL.
Received Certificate of Value  7/20/1998
Plans ACCEPTED BY PLAN CHECK  7/20/1998 PASS
REQUIRES LETTER REQUESTING THE USE OF THE 1997 UBC. SPOKE WITH STEVE BENNER OF THIS NEED. KMM GAVE ONE STRUCT. CALC AND TWO PROJECT MANUALS TO MIKE O. TO KEEP AT HIS DESK. PUT ONE COPY OF EACH WITH PLANS.
Application received  7/17/1998