(MK PLAZA II - FIRST FLOOR LOBBY REMODEL) This building is not fire sprinkled. To remodel the first floor elevator and entry lobby within an existing building. Work is to include constructing two new 2-hr stair enclosure corridors to independently connect 2 existing stair enclosures to the outside. A non-rated elevator lobby and a 1-hr fire-resistive corridor are also being built. A new noncombustible entry canopy at the West entry is being provided. All work shall comply with the approved drawings and plan review conditions on file. This permit is not intended to establish a Certificate of Occupancy. **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes10/27/1998 4/20/1999 DONE
Letter of compliance  2/9/1999 PASS
Letter of Compliance #14969 issued 2-9-99.
INSP - Final2/3/19992/3/19992/3/1999PNR
DetailsRuss Owen
INSP-Final Inspection2/1/19992/1/19992/1/1999PPASS
DetailsRick Jackson
approved per plans
INSP-Final Inspection1/29/19991/29/19991/29/1999AFAIL
DetailsRick Jackson
LARRY ###-#### exit signs; penetrations in 2 hr walss
INSP - Final1/29/19991/29/19991/29/1999PFAIL
DetailsWes Worcester
01/29/99 342 - LARRY ###-####
INSP - Framing/Rough-in11/10/199811/12/199811/12/1998PFAIL
DetailsJim Storey
11/10/98 301 - trans to wes via phone
INSP - Framing/Rough-in10/26/199810/26/199810/27/1998PFAIL
DetailsWes Worcester
10/26/98 342 - LARRY ###-#### need listed assemblies for 2 hr wall penet
INSP - Framing/Rough-in10/16/199810/19/199810/19/1998APART
DetailsWes Worcester
10/19/98 342 - larry fischer-###-#### partial fr insp
INSP - Framing/Rough-in10/16/199810/16/199810/16/1998 PART
DetailsWes Worcester
10/16/98 342 - larry fischer-###-#### partial fr insp
INSP - Framing/Rough-in10/6/199810/6/199810/6/1998PPART
DetailsWes Worcester
10/06/98 342 - larry ###-####
INSP - Framing/Rough-in10/6/199810/6/199810/6/1998 PART
DetailsWes Worcester
/ / 342 -
INSP - Framing/Rough-in9/23/19989/23/19989/23/1998PPART
DetailsWes Worcester
09/23/98 342 - LARRY ###-#### PAGER
INSP - Framing/Rough-in9/17/19989/17/19989/17/1998PPART
DetailsWes Worcester
09/17/98 342 - larry ###-####
(F) Reprint permit  9/9/1998
Issue PAID IN FULL permit  9/9/1998
Telephone call  8/27/1998
CALLED JOHN AT ###-#### PERMIT READY
PLANS/APPL TAKEN TO FRONT DESK  8/27/1998 PASS
Routing - PLAN CHECK8/27/1998 8/27/1998
Inspection Record Card- Bld  8/27/1998
Print Occupancy Form  8/27/1998
Plan assigned to (CJW)7/24/1998 8/27/1998 PASS
DetailsCarl Westfall
08/27/98 08:21:09 CJW - this action updated by action script from <<>> in Case No. BLD98-2166
Routing - FIRE8/18/1998 8/26/1998 PASS
testing condition printout  8/18/1998
Print permit w/o conditions  8/18/1998
Plan Reviewer's activity  8/18/1998 PASS
Drawings approved, with conditions, after resubmittal review.
Routing - PLAN CHECK7/31/1998 8/18/1998
Plan resubmittals received  8/17/1998
RECEIVED 2 COPIES OF REVISED SHEETS A1.0, A2.2, A3.1, M1.1 ROUTED TO CARL W.
Plan resubmittals received  7/30/1998
RECEIVED 1 COPY OF RESPONSE TO PLAN CHECK REVIEW 2 COPIES OF SHEET M1.1. 1 COPY OF KEY PLAN 1 COPY OF PARTIAL FLOOR PLAN 2 COPIES OF STRUCTURAL DESIGN CALC. 1 ADDENDUM #5 1 ADDENDUM #6 ROUTED TO CARL W. KMM
Routing - PLANNING7/28/1998 7/29/1998 PASS
Routing - PLAN CHECK7/24/1998 7/28/1998
Plan routing begun/TENANTS  7/28/1998
This plan to be reviewed by Plan Check, Planning, and Fire.
Plan assigned to (MYS)7/17/1998 7/24/1998
DetailsMarlene Southard
Plan resubmittals received  7/24/1998
RECEIVED 2 COPIES OF SHEETS P1.1 AND M1.1, AND 2 COPIES OF ADDENDUM FOUR. ROUTED TO CARL.
Plan Reviewer's activity  7/24/1998
UBC plan review started July 24, 1998 and finished July 28, 1998. A response from the Architect is required. See the conditions list. Because other projects were not available to review, the UBC plan review on this project was done first before being routed to any other agency.
Application received  7/17/1998
Recd Pcfee & Taken To Pln CK  7/17/1998
Routing - FIRE7/30/1998 7/31/1997 FAIL
Routing - PLAN CHECK9/25/1998