Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD98-02202
StatusFinaled
Name MIKE HASHIM
Site Address 8515 W FAIRVIEW AVE
Project NameBURGER KING
Customer Number 
ePlanReviewNo
Description
TO CONSTURCT A 2728 s.f.BURGER KING RESTAURANT AND 825 s.f. PLAYGROUND INCLUDING SITE WORK * THE CONSTRUCTION IS SLAB ON GRADE WITH WOOD AND STEEL STRUCTURAL WALLS AND A TRUSSED ROOF SYSTEM AND STUCCO SIDING. DRH98-0112 CUP98-0056 PC#502-98 JML
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 4/8/19994/8/1999 DONE
Details
Permanent occupancy  4/8/1999 PASS
Perm. Occ. Cert. #7724 issued 4-8-99 to Burger King.
Receive PAYMENT IN FULL PRINT  4/7/1999
INSP - Final3/30/19993/30/19993/30/1999PPART
DetailsCarl Dependahl
03/30/99 340 - ###-#### struct ok for perm occ, has fee due???
(F) Reprint permit  3/30/1999
Fee Review-notes7/23/1998 3/30/1999 DONE
final cert from gc
INSP-Conference3/25/19993/25/19993/25/1999 PASS
DetailsJoe Tawney
/ / 406 - GAVE CONTR APPROVAL FOR ASSEMBLY PERMIT
INSP-Conference3/25/19993/25/19993/25/1999 PASS
DetailsJoe Tawney
/ / 406 - GAVE CONTR APPROVAL FOR ASSEMBLY PERMIT
INSP - Final3/25/19993/25/19993/25/1999PFAIL
DetailsCarl Dependahl
03/25/99 340 - burger king\\###-#### ty keep c/n, need eng's letter. recall
Code Occupancy Approval  3/25/1999 PASS
INSPECTED ON 3/23/99 - POST BOND FOR WHEEL RESTRAINTS- 14 JUNIPERS AND HANDRAIL ($1,125.) - RE-INSPECTD ON 3/24/99 - ALL COMPLETE PER DRH98-0112 - PASS
INSP-Final Inspection3/23/19993/24/19993/24/1999APASS
DetailsJoe Tawney
03/24/99 406 - REINSP OK FOR PERM OCC
INSP - Final3/23/19993/24/19993/24/1999AFAIL
DetailsCarl Dependahl
03/24/99 340 - ###-#### TY//FINAL c/n,need plbg, c.dh.d.& eng's final acceeptance. ok for t/o card to bldr
Temporary occupancy  3/24/1999 PASS
Temp. Occ. Cert. #3804 issued 3-24-99 to Burger King.
INSP-Final Inspection3/22/19993/23/19993/23/1999AFAIL
DetailsJoe Tawney
03/23/99 406 - REINSP FAIL DUCT DET, AIR BAL FOR HOODS
INSP - Final3/22/19993/22/19993/22/1999PFAIL
DetailsCarl Dependahl
03/22/99 340 - need other finals, recall
INSP-Final Inspection3/19/19993/22/19993/22/1999ANR
DetailsJoe Tawney
03/22/99 406 - NOT READY FOR FINAL
INSP - Framing/Rough-in3/19/19993/19/19993/19/1999PFAIL
DetailsCarl Dependahl
03/19/99 340 - ###-#### TY//RI CEILING GRID install seismic braces, has elec cn
Code Occupancy Approval  3/18/1999
Final Occupancy requested by Ty @ ###-####.
INSP - Framing/Rough-in3/11/19993/11/19993/12/1999PFAIL
DetailsCarl Dependahl
03/11/99 340 - SCOTT ###-#### SUSPENDED ACOUSTICAL CEILING INSPECTION need seismic braces
INSP - Framing/Rough-in2/19/19992/22/19992/24/1999AFAIL
DetailsCarl Dependahl
shaft for broiler hood ###-#### Ty...looks ok, need detail for 1hr const. chk w/ ISI & alan H. for his ok
INSP - Framing/Rough-in2/23/19992/23/19992/23/1999APART
DetailsAlan Hauser
shaft not ready, had to change for clearances
INSP - Wall cover2/16/19992/16/19992/16/1999PPART
DetailsCarl Dependahl
02/16/99 340 - ###-#### Ty; part, rec'd eng's clarification, ok to cover report for steel frame (field insp onsite)
INSP - Framing/Rough-in2/16/19992/16/19992/16/1999 PART
DetailsCarl Dependahl
/ / 340 - play area, part
INSP - Framing/Rough-in2/11/19992/11/19992/12/1999PPART
DetailsCarl Dependahl
02/11/99 340 - PLAY GROUND\\###-####
INSP - Framing/Rough-in2/8/19992/9/19992/9/1999APART
DetailsCarl Dependahl
02/09/99 340 - ###-#### TY, c/n need all other oks, spec insp for t.s. m
INSP - Framing/Rough-in2/8/19992/8/19992/8/1999PCANC
Details
cover inspection tye ###-#### cant do because plumbing is not done
INSP - Wall cover2/3/19992/4/19992/4/1999PFAIL
DetailsCarl Dependahl
02/04/99 340 - TY ###-#### keep cn, ok to cover int wall as noted
INSP - Framing/Rough-in2/3/19992/3/19992/3/1999 FAIL
DetailsCarl Dependahl
/ / 340 - part, 2nd cn, need fix at west wall, plate missed at trusss, walls as noted
INSP - Framing/Rough-in2/3/19992/3/19992/3/1999PFAIL
DetailsCarl Dependahl
TY ###-####, part, dining, kitchen only, c/n; has plbg c/n
INSP - Framing/Rough-in2/2/19992/2/19992/2/1999PFAIL
DetailsCarl Dependahl
###-#### Ty c/n
INSP - Framing/Rough-in2/2/19992/2/19992/2/1999 FAIL
DetailsCarl Dependahl
/ / 340 - ext walls ...c/n , need fireblocks, detail shear panels ( en
INSP - Framing/Rough-in2/1/19992/1/19992/1/1999PFAIL
DetailsCarl Dependahl
02/01/99 340 - TY ###-#### COVER INSP fail, has plbg c/n
INSP - Framing/Rough-in1/29/19991/29/19991/29/1999PFAIL
DetailsRuss Owen
01/29/99 407 - need other inspections before a structural.
INSP - Framing/Rough-in1/21/19991/21/19991/21/1999PPART
Details
ty- ###-#### fr insp-sheathing for roof & ex siding & hold downs need to tighten down the nuts on the east side shear panel.
INSP - Framing/Rough-in12/15/199812/15/199812/15/1998PPART
Details
12/15/98 338 - ok to pour only signed off areas c/n in force need compac
INSP - Foundation12/10/199812/11/199812/11/1998AFAIL
Details
12/11/98 338 - not ready organics in the pour area
Issue PAID IN FULL permit  12/3/1998
Print Occupancy Form  12/3/1998
Inspection Record Card- Bld  12/3/1998
CHANGE STATUS TO (R)  11/23/1998 PASS
Issue PAID IN FULL permit  10/23/1998
Print Occupancy Form  10/16/1998
Inspection Record Card- Bld  10/16/1998
Telephone call  10/16/1998
CALLED PAT..NEED ACHD APPROVAL AND CALCS..DF
Telephone call  10/16/1998
CALLED TALKED TO CAMILLA GAVE NEW DOLLAR AMOUNT FOR B.K.-P.W.S CHANGED FEES
Routing - PLAN CHECK10/14/1998 10/15/1998 PASS
PLANS/APPL TAKEN TO FRONT DESK  10/15/1998 PASS
Print Pending Permit.LaserJet4  10/15/1998 PASS
Plan assigned to (JML)7/23/1998 10/15/1998 PASS
Details
Routing - PLANNING10/14/1998 10/14/1998 PASS
APPROVED PER DRH98-0112.
Routing - PLANNING9/28/1998 10/7/1998 PASS
Site plan now includes more land to south and has parking on east side. There is a residential use next to east property line. Need fencing between service drive and residential use as per Boise City Zoning Ordinance 11-10-04.4.F.2. Need to indicate location of bike rack on site plan.
Routing - PLAN CHECK10/7/1998 10/7/1998 PEND
sent to John L
Routing - PLUMBING9/25/1998 9/28/1998 PASS
Routing - PLAN CHECK9/28/1998 9/28/1998 PEND
NEEDS P&Z APPROVAL
Plan resubmittals received  9/25/1998 PEND
RECEIVED RESUBMITTALS FOR PLUMBING, FORWARDED SAME TO BILL VANDEGRIFT.
Routing - PLAN CHECK9/25/1998 9/25/1998
Routing - PLUMBING9/24/1998 9/24/1998 FAIL
Plan resubmittals received  9/24/1998
RECEIVED 2 COPIES OF REVISED SHEETS A12C AND A12D AND S-3 ROUTED TO JOHN LEVIEN.
Routing - PUBLIC WORKS9/22/1998 9/23/1998 PASS
Routing - PLAN CHECK9/23/1998 9/23/1998
Routing - FIRE9/21/1998 9/22/1998 PASS
second exit from each room provided
Telephone call  9/18/1998 FAIL
The response to the structural questions adaquately addressed them but they need to be in blueprint form. Trenton of Architects' office was informed of such. Non-structural issues are approved.
Plan resubmittals received  9/16/1998
RECEIVED RESUBS AND TAKEN TO FLOYD V.
Routing - PLAN CHECK9/8/1998 9/8/1998 PEND
Routing - PLUMBING9/8/1998 9/8/1998 FAIL
STILL WAITING ON REVISIONS PER BILL V.
Plan Review Completed(1st rev)  9/4/1998 FAIL
all agencies except CDH failed
Routing - FIRE9/3/1998 9/4/1998 FAIL
plans look like a mixture of different buildings... doors move around, seating arrangements change, etc
Routing - PLAN CHECK8/27/1998 9/2/1998 FAIL
I Sent my plan review findings to the architect by mail and fax. Needs resubmittals.
Routing - FIRE8/14/1998 8/27/1998 CANC
ubc plan review is required before UFC plan review
Routing - PLAN CHECK8/11/1998 8/11/1998
RECEIVED
Routing - PLUMBING8/10/1998 8/11/1998 FAIL
Routing - PLANNING8/4/1998 8/10/1998 FAIL
plans do not comply with DRH98-0112 conditions of approval.
Routing - PUBLIC WORKS7/29/1998 8/7/1998 FAIL
A LIGHTING PLAN NEEDS TO BE SUBMITTED TO BILL COLSON.
Routing Off Site - C.D.H7/22/1998 7/29/1998 PASS
CONTACTED TRENTON JONES TO TAKE PLANS OUT TO CDH (###-####)
Plan assigned to (JCM)7/22/1998 7/23/1998 PASS
DetailsJohn Menard
Received Certificate of Value  7/22/1998 PASS
Application received  7/22/1998
Routing Off Site - STRUCTURAL7/22/1998 7/22/1998
WILL ASK JOHN ON 7-23-98 IF HE WOULD LIKE PLANS TO GO TO OUTSIDE ENG. NO OUTSIDE ENG. ENG. WILL BE DONE IN HOUSE
Plan routing begun/NEW & ADDTN  7/22/1998
Plans ACCEPTED BY PLAN CHECK  7/22/1998 PEND
CONTACTED PAT MCKEEGAN TO LET HIM KNOW THAT I NEED 1. 3 ADDITIONAL CIVIL SHEETS 2. 1 PACKATE #2 FOR OUTSIDE ENGINEERING. I WILL ROUTE TO CDH THEN PW, PLUMBING, P&Z, PC, AND FIRE RECEIVED ON 7-23-98 3 ADDITIONAL CIVIL SHEETS AND ONE PACKAGE #2 FOR OUT SIDE ENG. ROUTED TO CDH
Recd Pcfee & Taken To Pln CK  7/22/1998 PEND
Plan assigned to (MYS)7/22/1998 7/22/1998
DetailsMarlene Southard