INSP - Final | 11/20/1998 | 11/23/1998 | 11/23/1998 | A | PASS |
Jim Sly
|
|
|
11/23/98 316 - C/C # 015744
|
INSP - Final | 11/19/1998 | 11/19/1998 | 11/19/1998 | P | FAIL |
Jim Sly
|
|
|
11/19/98 316 - CHAD- ###-#### FN INSP FOR OCC C/N...Need plumb final.
|
INSP - Final | 11/18/1998 | 11/18/1998 | 11/19/1998 | P | CANC |
Russ Owen
|
|
|
11/19/98 407 - transfer to another inspector.
|
INSP - Final | 11/18/1998 | 11/18/1998 | 11/18/1998 | | FAIL |
Tom Arcoraci
|
|
|
11/18/98 408 - DON ###-#### CELL # FN OCC INSP
|
INSP - Framing/Rough-in | 9/14/1998 | 9/15/1998 | 9/15/1998 | P | PASS |
Jim Sly
|
|
|
09/15/98 316 - CHAD CROCKER ###-#### FR INSP
|
INSP - Energy code compliance | 9/15/1998 | 9/15/1998 | 9/15/1998 | | PASS |
Jim Sly
|
|
|
/ / 316 -
|
INSP - Framing/Rough-in | 9/14/1998 | 9/14/1998 | 9/14/1998 | | FAIL |
Tom Arcoraci
|
|
|
/ / 408 -
|
INSP - Framing/Rough-in | 9/10/1998 | 9/11/1998 | 9/14/1998 | P | FAIL |
Jim Storey
|
|
|
09/11/98 301 - CHAD CROCKER ###-#### FR INSP trans to j.sly 9/14/98
|
INSP - Framing/Rough-in | 9/1/1998 | 9/1/1998 | 9/1/1998 | | FAIL |
Tom Arcoraci
|
|
|
09/01/98 408 - SHEAR WALL ###-####
|
INSP - Framing/Rough-in | 8/31/1998 | 9/1/1998 | 9/1/1998 | A | CANC |
Tom Arcoraci
|
|
|
SHEAR WALL ###-####
|
INSP - Framing/Rough-in | 8/28/1998 | 8/28/1998 | 8/28/1998 | | CANC |
Jim Sly
|
|
|
08/28/98 316 - Done AM
|
INSP - Framing/Rough-in | 8/28/1998 | 8/28/1998 | 8/28/1998 | | CANC |
Jim Sly
|
|
|
08/28/98 316 - Done AM
|
INSP - Framing/Rough-in | 8/28/1998 | 8/28/1998 | 8/28/1998 | | FAIL |
Jim Sly
|
|
|
08/28/98 316 - shear wall C/N...Need appr plans.....
|
INSP-Conference | 8/24/1998 | 8/25/1998 | 8/25/1998 | A | PASS |
Jim Sly
|
|
|
08/25/98 316 - RE: WINDER STAIRS Conf with framers......
|
Plan assigned to (ADS) | 8/10/1998 | | 8/16/1998 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 7/28/1998 | | 8/13/1998 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 8/13/1998 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 8/13/1998 | | PASS |
|
|
|
|
Plan resubmittals received | | | 8/13/1998 | | PASS |
|
|
|
|
Telephone call | | | 8/13/1998 | | MESS |
|
|
|
LEFT MESS THAT PLANS ARE READY AT ###-####
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/13/1998 | | PASS |
|
|
|
|
Issue PAID IN FULL permit | | | 8/13/1998 | | |
|
|
|
|
Plan resubmittals requested | | | 8/11/1998 | | FAIL |
|
|
|
by phone: Requested engineered design for resisting lateral loads on the garage front wall.
|
Plan assigned to (DJO) | 7/24/1998 | | 8/10/1998 | | PEND |
Dan Overy
|
|
|
|
INSP - Footings | 8/3/1998 | 8/3/1998 | 8/3/1998 | | FAIL |
Jim Sly
|
|
|
/ / 316 - Poured W/O...Foot width, height, soil Ok..setbks appear OK..
|
INSP - Framing/Rough-in | 8/3/1998 | 8/3/1998 | 8/3/1998 | P | NR |
Jim Sly
|
|
|
08/03/98 316 - Should have been footing insp......
|
Routing - PUBLIC WORKS | 7/24/1998 | | 7/28/1998 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 7/24/1998 | | |
|
|
|
|
Application received | | | 7/24/1998 | | |
|
|
|
|
Routing - PLANNING | 7/24/1998 | | 7/24/1998 | | PASS |
|
|
|
|