Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD98-02259
StatusExpired
Name GORDON JONES
Site Address 2811 N BOGUS BASIN RD
Project NameBOGUS BASIN OFFICE
Customer Number 
ePlanReviewNo
Description
GORDON JONES BOGUS BASIN OFFICE BULDING * TO CONSTRUCT A NEW, 2300 SQ.FT. TWO STORY WITH A BASEMENT, WOOD FRAMED, FULLY FIRE SPRINKLERED, TYPE V NONRATED, MULTI TENANT STRUCTURE. THE FIRST FLOOR IS APPROXIMATELY 1492 SQ.FT. THE SECOND FLOOR IS APPROXIMATELY 808 SQ.FT. AND THE BASEMENT IS APPROXIMATELY 2325 SQ.FT. THE INSTALLATION OF THE FIRE SPRINKLER SYSTEM IS BEING USED FOR FIRE RESISTIVE SUBSTITUTION PURPOSES AND CAN NOT BE USED FOR ANYTHING ELSE. ALL WORK PER THE APPROVED PLANS, ATTACHED COMMENT LIST, CABO/ANSI A117.1 AND THE 1994 EDITION OF THE UBC. PERMIT TO INCLUDE ON SITE LAND SCAPING AND PARKING LOT. DRH97-0241 PC#510-98 GRADING PERMIT BLD98-1692 SUBMITTED ON SEPARATE PLANS. MJP
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print permit w/o conditions  1/31/2003  
BLD-Footing4/9/20024/10/20024/10/2002APART
DetailsTony Young
###-####
permit has been re-issued, existing ftgs ok per letter on file, all work done to this point has attached engineering of approval, needs to be on site w/ approved plans 4/10/2002 11:31:10 AM
(F) Reprint permit  3/4/2002 DONE
CHANGE STATUS TO (ISS)  1/29/2002 DONE
Paid fees. Reopen permit.
(F) Reprint permit  1/25/2002 DONE
DOC - Permit Expired2/22/20012/22/20012/22/2001APASS
DetailsTony Young
Added by Inspector: 415 On 2/22/2001 11:19:05 AM
Fee Review-notes  8/20/1999
(F) Reprint permit  7/23/1999
Issue PAID IN FULL permit  7/22/1999
Telephone call  7/13/1999
Called Gordon Jones and he said that he was going to pick them up on July 20th
Ready Permit EXTENDED  4/27/1999 EXTD
AS PER LETTER FROM JEFF JONES OKAY TO EXTEND PERMIT UNTIL JULY 22, 1999. NO ADDITIONAL EXTENSION WILL BE GRANTED.MPS
Telephone call  2/26/1999 PASS
talked to larry sundell-gave $ amount & needed achd app
Telephone call  2/1/1999
AMY TALKED TO CUSTOMER/PERMIT IS READY
Inspection Record Card- Bld  2/1/1999
Print Occupancy Form  2/1/1999
Inspection Record Card- Bld  2/1/1999
Plan Reviewer's activity  1/29/1999 PASS
PLANS/APPL TAKEN TO FRONT DESK  1/29/1999 PASS
Routing Off Site - STRUCTURAL1/29/1999 1/29/1999 PASS
Plan assigned to (M_P)7/28/1998 1/29/1999 PASS
DetailsMike Phillips
01/29/99 15:57:03 M_P - this action updated by action script from <<>> in Case No. BLD98-2259
Plan resubmittals received  1/27/1999 PEND
RECEIVED RESUBMITTALS FROM LARRY SUNDELL, FORWARDED SAME TO MIKE PHILLIPS. DAR 1/26/99
Plan resubmittals requested  1/22/1999 FAIL
Requested additional engineering and architectural detail which were not answered in previous correction.
Routing - FIRE1/14/1999 1/14/1999 PASS
attached letter from architect
Routing - FIRE1/11/1999 1/13/1999 FAIL
did not respond to all items in last review
Routing - PLANNING1/8/1999 1/11/1999 PASS
resubmittal approved.
Plan Reviewer's activity  1/8/1999
Received new drawing and begining to route again. routing to Planning for exterior finish change.
Plan resubmittals received  1/7/1999
RECEIVED TWO COPIES OF REVISED PLANS PLUS RESPONSE TO YOUR PLAN REVIEW DATED AUGUST 31,1998 AND COPY OF THREE-HOUR FIRE SESISTANCE TEST OF REWARD WALL SYSTEMS'EPS INSULATED CONCRETE FORM WALL. ROUTED TO MIKE P. KMM
Plan Reviewer's activity  1/6/1999
Waiting for new drawings to be submitted for changing building from reward walls system to CMU construction. Reveived from hold and sending back to Planning for approval. 01-08-99
Plan resubmittals received  1/5/1999
RECEIVED THREE COPIES OF REVISED SHEETS 1 THRU TWELVE PLUS A LETTER IN RESPONSE TO MIKE P'S PLAN REVIEW DATED AUGUST 31 1998. ROUTED TO MIKE P. KMM
Routing Off Site - STRUCTURAL12/16/1998 12/30/1998 FAIL
SENT 2ND RESUB TO ATWOOD, HINZMAN, JONES. DAR 12/16/98 Additional corrections required gave to Larry Sundell 12-30-98.
Plan resubmittals received  12/15/1998 PEND
RECEIVED RESUBMITTALS FROM LARRY SUNDELL, FORWARDED SAME TO MIKE PHILLIPS. DAR 12/15/98
Routing Off Site - STRUCTURAL11/18/1998 12/4/1998 FAIL
SENT RESUBS TO ATWOOD,HINZMAN JONES. 11/18/98 DAR Additional information requested from outside engineering firm. Discussed with reviewer about making personel contact with engineer of record. AHJ agreed to working with engineer of record with out going through me.
Plan resubmittals received  11/12/1998
RECEIVED ONE COPY OF REVISED PLANS PLUS TWO COPIES OF REVISED CALCS. AND ONE COPY LETTER. ROUTED TO MIKE P. KMM
Plan resubmittals received  11/10/1998
RECEIVED TWO COPIES OF REVISED STRUCT. SHEETS AND CALCS. AND COVER LETTER. ROUTED TO MIKE P.
Routing Off Site - STRUCTURAL9/17/1998 10/1/1998 FAIL
resubs sent to atwood hinzman jones 10-01-98 REVIEW COMMENTS RECEIVED AND ROUTED TO MIKE P. Second set of calculations with corrections faxed to Larry on 10/2/98
Plan resubmittals received  9/16/1998 PEND
RECEIVED RESUBMITTALS FROM LARRY SUNDELL, FORWARDED SAME TO MIKE PHILLIPS.
Plan Review Completed(1st rev)  9/4/1998 FAIL
ubc and ufc
Routing - FIRE9/1/1998 9/4/1998 FAIL
Routing - PLAN CHECK8/7/1998 9/1/1998
Plan resubmittals requested  8/31/1998 FAIL
REQUESTED ADITIONAL INFORMATION TO BE SUBMITTED FOR FURTHER REVIEW, ALONG WITH A COMPLETE ENGINEERING DESIGN,
Routing - PLANNING7/28/1998 8/7/1998 PASS
approved per DRH97-0241. Note: a total of 13 new parking spaces must be constructed for the new building.
Routing - PLUMBING8/4/1998 8/5/1998 PASS
Routing Off Site - STRUCTURAL7/31/1998 8/4/1998
contacted pdq to take plans out to ATWOOD
Routing - PUBLIC WORKS7/29/1998 8/4/1998 PASS
Plans ACCEPTED BY PLAN CHECK  7/31/1998 PASS
Plan routing begun/NEW & ADDTN  7/28/1998 PASS
Recd Pcfee & Taken To Pln CK  7/28/1998
Application received  7/28/1998
Received Certificate of Value  7/28/1998 PASS
Plans ACCEPTED BY PLAN CHECK  7/28/1998 PEND
'ONTACTED LARRY SUNDELL TO LET HIM KNOW THAT I NEED 1 PACKAGE FOR OUTSIDE ENG. 7-29-98 THE PACKAGE HE GAVE ME WAS NOT STAMPED OR SIGNED. 7-31-98 LARRY CAME AND STAMPED AND SIGNED PLANS. ROUTED TO ATWOOD