Case Summary (BLD) | | | 8/26/2014 | | DONE |
|
|
|
|
BLD-Aging Inspection | 2/6/2008 | 2/6/2008 | 2/6/2008 | P | CANC |
Tom Arcoraci
|
|
|
|
Expired/Cancelled | 2/6/2008 | 2/6/2008 | 2/6/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 2/7/2005 | 2/7/2005 | 2/7/2005 | A | PASS |
Tom Arcoraci
|
|
|
ext work done ok to extend permit but only if more is completed in 180 days
|
BLD-Conference | 7/9/2004 | 7/9/2004 | 7/9/2004 | P | PASS |
Tom Arcoraci
|
|
|
STEVE; Phone #: ###-#### Internet Inspection Request from: Annette Moore wip ok to continue 7/9/2004 1:56:35 PM
|
Case Summary (BLD) | | | 7/9/2004 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/9/2004 | | DONE |
|
|
|
REACTIVIATED PER RON HILL
|
(F) Reprint permit | | | 7/9/2004 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 8/18/2000 | 8/21/2000 | 8/21/2000 | A | PART |
Carl Dependahl
|
|
|
Steve ###-####
|
BLD-Framing/Rough-in | 8/18/2000 | 8/18/2000 | 8/18/2000 | P | PART |
Carl Dependahl
|
|
|
Steve Telford ###-####; part ok to 1 side 1/2 wall 8/18/2000 3:58:21 PM
|
BLD-Framing/Rough-in | 7/14/2000 | 7/14/2000 | 7/14/2000 | P | PART |
Carl Dependahl
|
|
|
W/owner: re changes to framing- add post or repair notch @ beam. WIP.
|
BLD-Framing/Rough-in | 7/6/2000 | 7/7/2000 | 7/7/2000 | A | NR |
Carl Dependahl
|
|
|
###-#### or ###-#### Recall when sheathed. "Porch" 7/10/00 10:28:53 AM
|
BLD-Concrete | 4/27/2000 | 4/28/2000 | 4/28/2000 | A | PART |
Carl Dependahl
|
|
|
###-#### Porch ftg's 4/28/00 3:04:09 PM
|
BLD-Footing | 4/20/2000 | 4/21/2000 | 4/21/2000 | A | PART |
Carl Dependahl
|
|
|
###-#### Col's 4/24/00 10:58:07 AM
|
BLD-Conference | 4/6/2000 | 4/7/2000 | 4/7/2000 | A | PASS |
Carl Dependahl
|
|
|
PLEASE GIVE TO CARL\\###-#### STEVE W/owner- ok to change stairs to wood if P&Z ok (DR) 4/7/00 2:46:23 PM
|
BLD-Conference | 3/31/2000 | 4/3/2000 | 4/3/2000 | A | PART |
Jim Sly
|
|
|
###-#### No one on site called, Steve not there. 4/3/00 1:36:18 PM
|
BLD-Conference | 10/25/1999 | 10/25/1999 | 10/25/1999 | A | PASS |
Carl Dependahl
|
|
|
Conf. w/Steve Telford: referred to Plan Check
|
INSP - Foundation | 6/25/1999 | 6/25/1999 | 6/25/1999 | P | PART |
Carl Dependahl
|
|
|
06/25/99 340 - Steve ###-#### per 325 ; part bsmt wall ok
|
INSP - Foundation | 6/22/1999 | 6/22/1999 | 6/22/1999 | P | PART |
Carl Dependahl
|
|
|
06/22/99 340 - footings Steve ###-####
|
INSP - Foundation | 6/14/1999 | 6/15/1999 | 6/15/1999 | A | PART |
Carl Dependahl
|
|
|
06/15/99 340 - ###-####//CONCRETE FORMS, part walls
|
INSP - Foundation | 6/15/1999 | 6/15/1999 | 6/15/1999 | | PART |
Carl Dependahl
|
|
|
06/15/99 340 - ###-####//CONCRETE FORMS fnd wall
|
INSP - Foundation | 6/7/1999 | 6/7/1999 | 6/7/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - FTGAT BSMT EXIT OK
|
INSP - Concrete | 6/4/1999 | 6/4/1999 | 6/4/1999 | P | PART |
Carl Dependahl
|
|
|
06/04/99 340 - STEVE ###-#### CONCRETE FOOTINGS, formsok, need clarifica
|
INSP - Foundation | 5/26/1999 | 5/26/1999 | 5/26/1999 | P | FAIL |
Carl Dependahl
|
|
|
05/26/99 340 - walk through with Steve Telford ###-####
|
Issue PAID IN FULL permit | | | 3/5/1999 | | |
|
|
|
|
Telephone call | | | 3/4/1999 | | |
|
|
|
called permit ready
|
Inspection Record Card- Bld | | | 3/4/1999 | | |
|
|
|
|
Print Occupancy Form | | | 3/4/1999 | | |
|
|
|
|
Routing - PLAN CHECK | 8/18/1998 | | 3/1/1999 | | PASS |
|
|
|
|
Plan assigned to (R_H) | 8/4/1998 | | 3/1/1999 | | PASS |
|
|
|
03/01/99 11:32:18 RMH - this action updated by action script from <<>> in Case No. BLD98-2283
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/1/1999 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 2/22/1999 | | 3/1/1999 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 2/22/1999 | | 2/22/1999 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 2/8/1999 | | 2/22/1999 | | |
|
|
|
|
Routing - PUBLIC WORKS | 2/2/1999 | | 2/8/1999 | | FAIL |
|
|
|
REQUIRES DRAINAGE PLAN PER BM. DAR 2/8/99
|
Application received | | | 2/8/1999 | | |
|
|
|
|
Routing - PLAN CHECK | 12/14/1998 | | 2/2/1999 | | |
|
|
|
|
Routing - PUBLIC WORKS | 12/9/1998 | | 12/14/1998 | | FAIL |
|
|
|
REQUIRES DRAINAGE PLAN PER BM. DAR 122/14/98
|
Routing - PLANNING | 11/24/1998 | | 12/9/1998 | | PASS |
|
|
|
approved per DRH98-0117 and resubmitted plans.
|
Plan resubmittals received | | | 11/20/1998 | | |
|
|
|
RECEIVED TWO COPIES OF REVISED ARCHITECTURAL PLANS. TWO COPIES OF STRUCTURAL CALCULATIONS DATED 7-17-98. TWO COPIES OF STRUCTURAL CALCULATIONS DATED 10-13-98. ROUTED TO RON H. KMM
|
Plan Reviewer's activity | | | 10/8/1998 | | FAIL |
|
|
|
Recieved Phone Call 10-7-98, From Architect, Went over some of the requested items.
|
Routing - FIRE | 8/14/1998 | | 8/18/1998 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 8/13/1998 | | FAIL |
|
|
|
fAXED REQUIREMENTS TO ROCKY TOWLE / WILL ROUTE TO FIRE DEPARTMENT
|
Routing - PLANNING | 8/5/1998 | | 8/10/1998 | | FAIL |
|
|
|
Handicap space does not meet Code requirements. Phoned Dennis at Desiggn Resources and informed him of the problem.
|
Routing - PUBLIC WORKS | 8/4/1998 | | 8/5/1998 | | FAIL |
|
|
|
REQUIRES DRAINAGE PLAN
|
Plan routing begun/TENANTS | | | 8/4/1998 | | |
|
|
|
Route to PUBLIC WORKS, PLANNING, PLAN CHECK and FIRE. This will also need ACHD approval.
|
Plan assigned to (MYS) | 7/30/1998 | | 8/4/1998 | | |
Marlene Southard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/30/1998 | | PEND |
|
|
|
|
Application received | | | 7/30/1998 | | |
|
|
|
|