Case Summary (BLD) | | | 8/21/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/24/2001 | | |
|
|
|
|
Letter of compliance | | | 9/30/1998 | | PASS |
|
|
|
LETTER OF COMPLIANCE #15998 ISSUED 9-30-98.
|
INSP - Final | 9/18/1998 | 9/18/1998 | 9/18/1998 | P | PASS |
Jim Storey
|
|
|
09/18/98 301 - JASON ###-#### FNL -OK FINAL card on site.
|
INSP-Final Inspection | 9/17/1998 | 9/17/1998 | 9/17/1998 | P | PASS |
Rick Jackson
|
|
|
jason ###-#### occ approved
|
INSP-Sprinkler Rough-in/Hydro | 9/16/1998 | 9/16/1998 | 9/16/1998 | P | FAIL |
Rick Jackson
|
|
|
JASON ###-#### FIRE LIFE SAFETY INSP-4TH FLOOR SUITE 410 heads within 6 ft of each other; hangers not correct
|
INSP - Framing/Rough-in | 8/26/1998 | 8/26/1998 | 8/26/1998 | P | PASS |
Jim Storey
|
|
|
08/26/98 301 - jason ###-#### FRAM-OK FRAMING
|
INSP - Framing/Rough-in | 8/21/1998 | 8/21/1998 | 8/21/1998 | P | FAIL |
Jim Storey
|
|
|
08/21/98 301 - JASON ###-#### SUITE 410 CORR-CORREC-CALL FOR REINSP WHEN COMPLETED need ele and mech as well as approved plan on site for reinsp.
|
Issue PAID IN FULL permit | | | 8/4/1998 | | |
|
|
|
|
Print Occupancy Form | | | 8/3/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/3/1998 | | |
|
|
|
|
Telephone call | | | 8/3/1998 | | PASS |
|
|
|
mike will be in
|
Plan assigned to (DRS) | 7/29/1998 | | 7/31/1998 | | PASS |
Dan Stuart
|
|
|
|
Routing - PLAN CHECK | 7/31/1998 | | 7/31/1998 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 7/31/1998 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/31/1998 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 7/31/1998 | | |
|
|
|
Reviewed files and micro fiche on file for the building. Contacted Floyd Varley to verify the building is fully sprinkled and that the existing ceiling assembly does not qualify as a 1-hour assembly. Reviewed building areas as shown on original approved plans to varify the square footage was acceptable based on story increases, yards and type of construction to allow use of sprinkler system as substitution for the one hour construction. It was determined that this is acceptable and is so noted in the permit and plan review for future reference.
|
Print Pending Permit.LaserJet4 | | | 7/31/1998 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 7/31/1998 | | PASS |
|
|
|
|
Application received | | | 7/30/1998 | | |
|
|
|
|
Meeting | | | 7/29/1998 | | |
|
|
|
Met with Mike Tsu to review scope of project and possibilty of processing plan review on a fast-track basis. Approved for desk permit review.
|