Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD98-02396
StatusFinaled
Name J R SIMPLOT SELF DECLARATION
Site Address 6556 S FEDERAL WAY
Project NameCOLUMBIA MARKET "A"
Customer Number 
ePlanReviewNo
Description
COLUMBIA VILLAGE MARKET PLACE BUILDING "A" (SHELL BUILDING) - TO CONSTRUCT A NEW 8,215 SQ. FT., ONE STORY, RETAIL LEASE SPACE SHELL BUILDING AND RELATED SITE IMPROVEMENTS AS PART OF THE COLUMBIA MARKET COMPLEX. CONSTRUCTED OF CMU EXTERIOR WALLS, CONCRETE SLAB FLOOR AND STEEL ROOF JOIST AND DECK WITH BUILT-UP ROOFING SYSTEM. THIS BUILDING IS FULLY FIRE SPRINKLED. THIS IS A SHELL PERMIT ONLY WITH NO OCCUPANCY ALLOWED UNDER THIS PERMIT. A SEPARATE TENANT IMPROVEMENT PERMIT IS REQUIRED FOR EACH TENANT SPACE. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. DR#19-97/CU#6-95/PC#548-97/JCM SITE GRADING AND DRAINAGE PERMIT IS BLD98-0901. (BUILDINGS SUBMITTED UNDER ONE SET OF PLANS)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
(F) Reprint permit  10/20/2004 DONE
Letter of compliance  11/23/1999 DONE
Letter of Compliance #18191 issued 11-23-99.
BLD-Final11/12/199911/15/199911/15/1999APART
DetailsJim Storey
Mike, ###-#### - call 1st & he will meet you there Temp. ok, pending engineer reports for outstanding special insp. Report issue of bas posisiouevs- ok for final upon response.
FIRE-Final Inspection11/1/199911/1/199911/1/1999PPASS
DetailsRick Jackson
MIKE ###-#### Occupancy approved
Fee Review-notes5/24/1999 8/20/1999
Code Occupancy Approval  8/17/1999 PASS
ALL LANDSCAPE AS REQUIRED IN PLACE, FINAL SIGNED OFF AND WILL RELEASE BOND OF $5000.00.
SUPER- Supervisor's review8/9/19998/9/19998/9/1999
sent letter gary himes ladder for roof access to be within 8 foot of grade. code sent to gary
INSP-Alarm Testing8/2/19998/5/19998/5/1999APASS
DetailsRick Jackson
sprinkler system monitored okay; alarms okay
INSP-Final Inspection8/5/19998/5/19998/5/1999PPASS
DetailsRick Jackson
occ approved
INSP-Alarm Testing7/20/19997/21/19997/21/1999AFAIL
DetailsRick Jackson
GEORGE PAGER ###-#### ALARM no phone lines
Code Occupancy Approval  7/19/1999
Final requested by George Maxwell. 386--0311 pager
INSP-Final Inspection7/15/19997/15/19997/15/1999AFAIL
DetailsRick Jackson
need to test alarms and sprinklers; knox box
Code Occupancy Approval  6/8/1999 FAIL
A $5000 DOLLAR BOND HAS BEEN POSTED FOR THE REQUIRED DRH97-0019 CONDITIONS, NORTH FENCE AND SPEED BUMPS, WILL SIGN TEMPORARY WHEN CARDS FOUND.
Print Occupancy Form  5/5/1999
INSP-Supply line flush4/30/19994/30/19994/30/1999PPASS
DetailsRick Jackson
flush okay
INSP - Framing/Rough-in4/19/19994/19/19994/20/1999PPART
DetailsJim Storey
04/19/99 301 - ###-#### carl
INSP-Sprinkler Rough-in/Hydro1/27/19991/27/19991/27/1999 PART
DetailsRick Jackson
/ / 409 - UNDERGROUND OKAY TO COVER, THRUST BLOCKS POURED AND DEPTH OF
INSP - Foundation12/28/199812/28/199812/28/1998PFAIL
DetailsCarl Dependahl
Clint ###-#### pouring at 9...301 area; called,unable to contact; check the note "pouring at 9", sounds like a done deal to me ( I didn't get insp. til 10:30 am.)
INSP - Foundation12/17/199812/18/199812/18/1998PNR
DetailsRuss Owen
12/18/98 407 - ROD ###-####
INSP - Foundation12/14/199812/15/199812/15/1998PFAIL
DetailsJim Storey
12/15/98 301 - pre-const meetting re-bar not ready resch.
(F) Reprint permit  12/15/1998
PLANS/APPL TAKEN TO FRONT DESK  12/14/1998 PASS
Plan resubmittals received  12/14/1998 PASS
RECEIVED COPY OF RECORDED LOT LINE ADJUSTMENT.
Inspection Record Card- Bld  12/14/1998
Telephone call  12/14/1998
called permit ready
Issue PAID IN FULL permit  12/14/1998
Print Occupancy Form  12/14/1998
Plan assigned to (JCM)8/10/1998 12/14/1998 PASS
DetailsJohn Menard
Routing - PLAN CHECK10/23/1998 12/14/1998 PASS
Plan resubmittals received  11/9/1998
RECEIVED TWO COPIES OF REVISED SHEETS 1.0, 2.0, 2.1, 2.3, 2.4, 3.0, 3.1, 3.2, 3.4, PLUS ONE COVER LETTER. ROUTED TO JOHN M.
Routing - PLAN CHECK9/24/1998 10/23/1998 PEND
Plan resubmittals received  10/23/1998
RECEIVED 2 COPIES OF CONSTRUCTION DOCUMENTS 2 PROJECT MANUALS ONE RESPONSE LETTER ROUTED TO JOHN M. KMM
Routing - PLANNING10/23/1998 10/23/1998 PASS
approved per DRH97-0019 and CU-9-95.
Routing - PUBLIC WORKS9/24/1998 9/24/1998 PASA
Routing - PLAN CHECK9/16/1998 9/23/1998
Plan Review Completed(1st rev)  9/16/1998 FAIL
planning, pw, ubc
Routing - FIRE9/14/1998 9/16/1998 PASS
Plan resubmittals requested  9/9/1998 PEND
FAXED TIM STAGGS A COPY OF THE STRUCTURAL COMMENT LIST REQUESTING REVISIONS.
Routing Off Site - STRUCTURAL8/17/1998 9/9/1998
CONTACTED PDQ TO TAKE PLANS OUT TO CH2MHILL REQUIRES A SOILS REPORT. ROUTE TO CH2MHILL WHEN IT IS RECEIVED 8/18/98 RECEIVED SOILS REPORT, FORWARDED SAME TO CH2MHILL. DAR
Routing - PLUMBING8/28/1998 8/31/1998 PASS
Routing - PLANNING8/26/1998 8/27/1998 PEND
Design Review approved per DRH97-0019. Pending conditional use analyst review and approval (CU-6-95).
Routing - PUBLIC WORKS8/20/1998 8/26/1998 FAIL
SUB-DIVISION NOT RECORDED.
Routing - PLAN CHECK8/17/1998 8/20/1998
Plan resubmittals requested  8/19/1998 PEND
MAILED TIM STAGGS AT PETERSEN-STAGGS A COPY OF THE CORRECTION LIST REQUESTING REVISIONS.
Plan routing begun/NEW & ADDTN  8/17/1998
Plans ACCEPTED BY PLAN TECH  8/17/1998 PASS
STILL WAITING FOR A SOILS REPORT. WILL WAIT ROUTE PLANS TO CH2MHILL. WILL ROUTE REPORT OVER WHEN IT IS RECEIVED. KMM 8/18/98 RECEIVED SOILS REPORT. FORWARDED SAME TO CH2M HILL.
Waiting for Cert. of Value  8/10/1998
REQUIRES A REVISED CERT. OF VALUE MINUS BUILDING B.
Plans ACCEPTED BY PLAN TECH  8/10/1998 FAIL
REQUIRES A SOILS REPORT, AN ADDITIONAL COPY OF STRUCT. CALCS., A NEW CERT. OF VALUE MINUS BLD. "B", AND AN APPLICATION FOR BUILDING "B". CONTACTED TRACY OF PETERSON STAGGS AT ####-####. 8-14-98 RECEIVED 1. EXTRA STRUCT. CALCS. 2. A NEW CERT. OF VALUE FOR BLDG. "A" 3. AN APPLICATION FOR BLDG. "B"
Plan assigned to (MYS)8/7/1998 8/10/1998 PEND
DetailsMarlene Southard
Recd Pcfee & Taken To Pln CK  8/7/1998
Application received  8/7/1998