Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD98-02420
StatusFinaled
Name ST ALPHONSUS (MATERIALS MANAGE
Site Address 1055 N CURTIS RD
Project NameST ALS - 1ST FLR
Customer Number 
ePlanReviewNo
Description
To remodel the existing 17,465 sq.ft. receiving / distribution admin area per approved plans on file. Work to include removal of interior non-bearingg walls to create a new open suite area for receiving supplies & orginizing for distribution for the hospital facility. To increase the storage area for compressed gas cylinders, remodel existing office spaces & create new office, breakroom & reception areas. To remodel the Print Shop, add three carousel for storage / distribution & to upgrade electrical, mechanical & plumbing to meet the needs of the remodeled areas. All framing materials to be noncombustible with fire-code sheetrock cover with all wall & ceiling finish materials to comply w/ Ch. 8 for flame spread ratings. This building is fully fire sprinklered. (P.C.#555-98)/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Receive PAYMENT IN FULL  12/23/1999 DONE
Letter of compliance  12/23/1999 DONE
Letter of Compliance #18216 issued 12-23-99.
BLD-Final12/1/199912/2/199912/2/1999APASS
DetailsCarl Dependahl
cecil ###-#### fn occ
Fee Review-notes2/17/1999 11/23/1999 DONE
ADDITIONAL FROM SUBS
(F) Reprint permit  11/23/1999 DONE
INSP-Final Inspection8/9/19998/12/19998/12/1999APASS
DetailsJoe Tawney
08/12/99 406 - FINAL OK FOR CERT OF COMPLETION
INSP - Framing/Rough-in3/2/19993/2/19993/2/1999PPART
DetailsCarl Dependahl
03/02/99 340 - corr. walls at back ok to cover, need smoke/fire dampers
Issue PAID IN FULL permit  2/19/1999
Telephone call  2/18/1999
called GC permit ready
Plan assigned to (DRS)8/13/1998 2/17/1999 PASS
DetailsDan Stuart
02/17/99 09:22:17 DRS - this action updated by action script from <<>> in Case No. BLD98-2420
PLANS/APPL TAKEN TO FRONT DESK  2/17/1999 PASS
APPROVED AS NOTED ON PLANS AND ATTACHED PLAN REVIEW COMMENTS WITH ARCHITECTS RESPONSE ATTACHED TO PLANS.
Routing - FIRE2/17/1999 2/17/1999 PASS
rec'd response limiting storgae of class 1 flammable liquids to 240 gallons per control area.
Routing - PLAN CHECK2/17/1999 2/17/1999 PASS
FLOYD HAS RECEIVED REQUIRED DATA FROM ARCHITECT & HOSPITAL TO APPROVE PLANS. HE ADDED A COPY OF RESPONSE LETTER TO PLANS AND SIGNED OFF. PLANS BEING PROCESSED FOR PERMIT ISSUANCE.
Inspection Record Card- Bld  2/17/1999
Print Occupancy Form  2/17/1999
Routing - PLAN CHECK2/11/1999 2/11/1999 PEND
PLANS RETURNED FROM FIRE DEPARTMENT. ADDED INFORMATION PROVIDED BY HOSPITAL STAFF FOR CHEMICALS & QUANTITIES KEPT IN THE STOREROOM EXCEED ALLOWABLE WHEN MAXIMUM ARE ON HAND. FIRE DEPT HAS REJECTED PLANS UNTIL METHOD OF PROPER CONTROLL & STORAGE HAS BEEN DEMONSTRATED BY ARCHITECT & HOSPITAL. PLANS PARKED BEHIND MY DESK WAITING FOR RESPONSE, THEN TO BE CIRCULATED BACK TO FIRE PLAN REVIEW.
Routing - FIRE2/9/1999 2/11/1999 FAIL
need clarification on flammable storage room
Routing - PLAN CHECK2/5/1999 2/8/1999 PEND
REVIEWED ARCHITECTS RESPONSE TO PLAN REVIEW COMMENTS, INSERTED RESUBMITTALS INTO PLANS, ROUTING TO FIRE DEPT FOR REVIEW. ARCHITECT TO SEND ME ONE MORE SET OF RESUBMITTALS.
Routing - PLAN CHECK10/20/1998 2/5/1999 PEND
RESUBMITTALS RECEIVED AFTER SEVERAL PHONE DISCUSSIONS WITH ARCHITECT AND THEN FINALLY WITH DENNIS ADAMS OF SARMC TO SEE IF THE PROJECT WAS STILL ON LINE TO BE DONE. DENNIS CALLED ARCHITECT THEN CALLED ME BACK TO TELL ME I WOULD HAVE PLAN RESUBMITTALS BY NEXT DAY.
Plan resubmittals received  2/4/1999
RECEIVED ONE COPY OF SHEET A2.2, ONE RESPPONS LETTER. ROUTED TO DAN S. KMM
Telephone call  2/2/1999
Called Vince Johnson, GNA, to check on architectural re-submittals that I don't have as promised on several occasions. Vince promised I would receive them tommorrow. I told him the 180 day limit for experation on applications for plans that are not issued is quickly appoaching. Plans are 174 days old today.
Routing - PLANNING10/19/1998 10/20/1998 PASS
Page A9.1 Show new 900 sq. ft. canopy & new garbage chute & container location. These items are okay per review by Martin Santoyo.
Routing - FIRE10/14/1998 10/19/1998 FAIL
med gas and occupancy sep issues
Plan Review Completed(1st rev)  10/19/1998 FAIL
UBC and UFC issues
Print Pending Permit.LaserJet4  10/13/1998 PEND
Routing - PLAN CHECK10/8/1998 10/13/1998 PEND
Finished preliminary plan review with comments to Vince Johnson, architect. Forwarding plans to Fire Dept. for their review while waiting for architects response.
Plan resubmittals requested  10/12/1998 PEND
Finish plan review. Have discussed some of the areas in question needing clarification & / or resubmittals with Vince Johnson, Architect @ GRNAA and faxed copy and mailed copy of corrections needed.
Telephone call  10/12/1998
Dennis Adams called back to say a master plan had just been completed by GRNAA of SLC & that he would call Vince Johnson and ask him to send a copy of the finished product to the city for our files and use.
Telephone call  10/12/1998
Received a call from Vince Johnson, project architect. I reviewed some of the concerns I had in doing the review and told him I would get a copy of my report ot him by this afternoon. He told me the master plans for SARMC for the fire wall & smoke barrier location was done but they were having problems getting the computer to print ou the program details. Vince thought I would get a copy on Tuesday or Wednesday and that he woulf try to resond to the concerns by late Wednesday as he would be gone for the rest of the week after that.
Telephone call  10/9/1998
Called to talk with Vince Johnson about getting master copy of hospital South Tower first floor to assist in locating fire & smoke barrier walls to help determine existing conditions & their relationship to the proposed remodel. Vince was out of town but would return my call next week.
Telephone call  10/9/1998
Called Dennis Adams, staff architect of SARMC to see if he had Master plan showing the fire wall smoke barrier layout for St. Al's that could be made available for city records & reference. Dennis would get back to me.
Routing - PLAN CHECK8/17/1998 10/8/1998 PEND
Picked up plans to beginn plan review.
Routing - PUBLIC WORKS8/13/1998 8/17/1998 PASS
Plans ACCEPTED BY PLAN TECH  8/13/1998 PASS
SHEET A2.1 STAMPED AND SIGNED. ROUTED TO MARLENE
Plan routing begun/TENANTS  8/13/1998
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
Plan assigned to (MYS)8/11/1998 8/13/1998
DetailsMarlene Southard
Plans ACCEPTED BY PLAN TECH  8/11/1998 HOLD
REQUIRES SHEET A2.1 "B" TO BE SIGNED. CONTACTED ROB OF KREIZENBECK CONST. TO LET HIM KNOW OF THIS NEED. KMM
Recd Pcfee & Taken To Pln CK  8/11/1998
Application received  8/11/1998