INSP - Final | 12/15/1998 | 12/15/1998 | 12/15/1998 | P | PASS |
Russ Owen
|
|
|
12/15/98 407 - reinspect,
|
INSP - Final | 12/11/1998 | 12/14/1998 | 12/14/1998 | A | FAIL |
Russ Owen
|
|
|
12/14/98 407 - left corrections.
|
INSP - Final | 12/11/1998 | 12/11/1998 | 12/11/1998 | P | FAIL |
Russ Owen
|
|
|
12/11/98 407 - need plumbing before structural.
|
INSP - Final | 12/4/1998 | 12/4/1998 | 12/4/1998 | P | NR |
Russ Owen
|
|
|
12/04/98 407 - this house needs every inspection from all other inspecto
|
INSP - Energy code compliance | 10/27/1998 | 10/28/1998 | 10/28/1998 | A | FAIL |
Jim Storey
|
|
|
10/28/98 301 - john-###-#### insulation insp
|
INSP - Energy code compliance | 10/28/1998 | 10/28/1998 | 10/28/1998 | P | PASS |
Russ Owen
|
|
|
re-inspect.
|
INSP - Framing/Rough-in | 10/26/1998 | 10/26/1998 | 10/27/1998 | P | PASS |
Jim Storey
|
|
|
10/26/98 301 - JOHN ###-#### FRAM-OK FRAMING ì
|
INSP - Energy code compliance | 10/26/1998 | 10/26/1998 | 10/27/1998 | P | FAIL |
Jim Storey
|
|
|
10/26/98 301 - JOHN ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED ì
|
INSP - Framing/Rough-in | 10/22/1998 | 10/22/1998 | 10/23/1998 | P | PART |
Jim Storey
|
|
|
10/22/98 301 - JOHN-###-#### FR INSP CORR-CORREC-CALL FOR REINSP WHEN COMPLETED required engineering for back lateral bracing, for slope grade stablation, fire blocking through out.
|
INSP - Foundation | 10/22/1998 | 10/22/1998 | 10/22/1998 | A | FAIL |
Carl Dependahl
|
|
|
conf only w/ T Records at site...need eng's ok for fnd placed on approx 5-6 ft. of fill at top of slope..asked Jim Storey to include in framing correction...
|
INSP - Framing/Rough-in | 10/20/1998 | 10/20/1998 | 10/20/1998 | P | FAIL |
Jim Storey
|
|
|
10/20/98 301 - JOHN ###-#### CORR-CORREC-CALL FOR REINSP WHEN COMPLETED planreview isue took approved back to city. no framing insp. could be performed.
|
INSP - Foundation | 9/11/1998 | 9/11/1998 | 9/11/1998 | P | NR |
Russ Owen
|
|
|
09/11/98 407 - Still need to set up some lower rear form boards,told the contractor i will try to come back later when job was completed, time now 1;30.
|
INSP - Foundation | 9/11/1998 | 9/11/1998 | 9/11/1998 | | PART |
Russ Owen
|
|
|
/ / 407 - Time now 4;45pm job has been completed and is now being poured,exposed sections of rebar are at 24" o.c. vert and horiz,exposed sections apear ok, Boise City does not require any rebar in the basement walls so it exceeds Boise City requirements.
|
INSP - Foundation | 9/10/1998 | 9/10/1998 | 9/10/1998 | | PASS |
Russ Owen
|
|
|
/ / 407 - footings
|
INSP - Foundation | 9/9/1998 | 9/10/1998 | 9/10/1998 | A | NR |
Russ Owen
|
|
|
09/10/98 407 - noapproved plans at the site.
|
INSP - Foundation | 9/4/1998 | 9/8/1998 | 9/9/1998 | A | CANC |
Russ Owen
|
|
|
09/09/98 407 - contractor called to cancell.
|
INSP - Foundation | 9/4/1998 | 9/4/1998 | 9/4/1998 | P | NR |
Wes Worcester
|
|
|
09/04/98 342 - JACK ###-#### on a slope w/o design or rebar in ftg???
|
Issue PAID IN FULL permit | | | 8/27/1998 | | |
|
|
|
|
Plan assigned to (MLO) | 8/24/1998 | | 8/26/1998 | | PASS |
Mike Otto
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/26/1998 | | PASS |
|
|
|
|
Telephone call | | | 8/26/1998 | | PASS |
|
|
|
LEFT MESS WITH MELISSA THAT PLANS ARE READY
|
Inspection Record Card- Bld | | | 8/26/1998 | | |
|
|
|
|
Routing - PLAN CHECK | 8/12/1998 | | 8/26/1998 | | PASS |
|
|
|
|
Plan assigned to (DJO) | 8/11/1998 | | 8/24/1998 | | PEND |
Dan Overy
|
|
|
|
Routing - PUBLIC WORKS | 8/11/1998 | | 8/12/1998 | | PASS |
|
|
|
passed by public works
|
Application received | | | 8/11/1998 | | |
|
|
|
|
Routing - PLANNING | 8/11/1998 | | 8/11/1998 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 8/11/1998 | | |
|
|
|
|