Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD98-02437
StatusFinaled
Name AL JOHNSON
Site Address 690 N ROBBINS RD
Project NameBOISE SR. CENTER
Customer Number 
ePlanReviewNo
Description
BOISE SENIOR CENTER PHASE II ADDITION * TO ADD APPROXIMATELY 3,086 S.F. OF NEW MULTI PURPOSE MEETING ROOMS AND ACCESSIBLE RESTROOMS TO THE EXISTING FACILITY. THE CONSTRUCTION TYPE IS SINGLE STORY, WOOD FRAMED, TYPE V-ONE-HOUR, FULLY FIRE SPRINKLERED. THE INSTALLATION OF THE SPRINKLER SYSTEM IS FOR ONE-HOUR SUBSTITUTION AND CAN NOT BE USED FOR ANY OTHER PURPOSE. PERMIT INCLUDES RELATED SITEWORK, CONCRETE FOUNDATIONS, WOOD FRAME CONSTRUCTION, SINGLE-PLY ROOFING, HVAC, AMD PLUMBING. ALL CONSTRUCTION PER THE APPROVED PLANS,ATTACHED COMMENT LIST, CABO/ANSI A117.1 AND THE 1994 EDITION OF THE UBC. THIS PROJECT IS LOCATED IN THE FLOOD PLAIN A CERTIFICATE OF ELEVATION IS REQUIRED TO BE SUBMITTED TO THE BUILDING INSPECTOR PRIOR TO CALLING FOR A FINAL. MJP CU#98-0066 (PC#563-98)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/27/199910/27/199910/27/1999APASS
Details
C/N removed ok to issue O/C
Permanent Occupancy 10/27/199910/27/1999 DONE
Details
Permanent occupancy UNPAID FEE  10/27/1999 DONE
Perm. Occ. Cert. #7973 issued 10-27-99 to the Boise Senior Center (addn.)
FIRE-Final Inspection10/22/199910/25/199910/25/1999APART
DetailsRick Jackson
Mark Guho ###-#### Occupancy Approved
BLD-Final10/22/199910/25/199910/25/1999PFAIL
Details
Mark Guho ###-#### Need CDHD line signed.
FIRE-Final Inspection10/21/199910/22/199910/22/1999AFAIL
DetailsRick Jackson
WALTER DAVIS-- ###-#### CELL-- FN FIRE Alarms okay; need sign for fire dept. connection
Fee Review-notes9/15/1999 10/4/1999 DONE
FIRE-Final Inspection10/4/199910/4/199910/4/1999PFAIL
DetailsRick Jackson
KATE--###-#### OR WALTER CELL ###-#### FN FIRE- alarm plans ; damper not working, rated doors not latching , emergency lights not working
Permanent occupancy UNPAID FEE  9/23/1999 JWS
BLD-Final9/16/19999/17/19999/17/1999AFAIL
DetailsRuss Owen
needs several other sign-offs
INSP - Framing/Rough-in8/23/19998/24/19998/24/1999APASS
DetailsRuss Owen
08/24/99 407 - steve---###-#### -suspended ceiling insp
INSP-Conference8/10/19998/10/19998/10/1999PPART
DetailsRick Jackson
relocation of kitchen hood sprinkler valve to above refer unit behind access door; vavle to tampered
INSP - Wall cover7/6/19997/7/19997/7/1999APART
DetailsWes Worcester
STEVE - ###-#### DRY WALL AND NAIL ok
INSP - Framing/Rough-in7/1/19997/1/19997/1/1999 FAIL
DetailsWes Worcester
07/01/99 342 - CANCELLED, ENTERED INCORRECTLY
INSP - Framing/Rough-in6/28/19996/29/19996/29/1999APASS
DetailsWes Worcester
Scheduled by Hello!. Contact phone is [4291751].
INSP - Framing/Rough-in6/28/19996/28/19996/28/1999APASS
DetailsWes Worcester
06/28/99 342 -
INSP - Framing/Rough-in6/24/19996/25/19996/25/1999ACANC
DetailsRuss Owen
06/25/99 407 - TRANS TO 342.
INSP - Framing/Rough-in6/21/19996/22/19996/22/1999ACANC
DetailsRuss Owen
06/22/99 407 - trans to 342..
INSP - Concrete5/14/19995/14/19995/14/1999PFAIL
DetailsWes Worcester
Mark ###-####mobile/office###-#### NEED SPEC INSP, LOG, COVER & DOWELS
Print Occupancy Form  5/13/1999
Inspection Record Card- Bld  5/13/1999
INSP - Framing/Rough-in4/19/19994/27/19994/27/1999AFAIL
DetailsWes Worcester
04/26/99 342 - Pre-con meeting @ 8:30 am per Wes. reschedule per Hummel
Issue PAID IN FULL permit  4/23/1999
Inspection Record Card- Bld  3/23/1999
Telephone call  3/23/1999
called Al Johnson. Permit ready contractor will pick up permit.
Print Occupancy Form  3/23/1999
Plan Reviewer's activity  3/22/1999 PASS
PLANS/APPL TAKEN TO FRONT DESK  3/22/1999 PASS
Print Pending Permit.LaserJet4  3/22/1999 PASS
Plan assigned to (M_P)8/13/1998 3/22/1999 PASS
DetailsMike Phillips
03/22/99 11:33:04 M_P - this action updated by action script from <<>> in Case No. BLD98-2437
Routing - PLAN CHECK3/11/1999 3/21/1999
Plan Reviewer's activity  3/17/1999 FAIL
Did not receive complete resubmittal Waiting for additional structural calculations. Phone and left message for Dean Schultz.
Routing - PUBLIC WORKS3/10/1999 3/11/1999 PASS
Telephone call  3/10/1999
Phoned Dean Schultz and informed him what he submitted was not a complete set and did not respond to my ccencerns from September plan review correction.
Plan resubmittals received  3/10/1999
RECEIVED ONE COPY OF PLAN REVIEW COMMENTS. TWO COPIES OF REVISED DRAWINGS AND SPECS. PLUS TWO ADDEMEUM NO. 1 & NO. 2. ROUTED TO MIKE P. KMM
Plan resubmittals received  2/5/1999
RECEIVED THREE COPIES OF REVISED SHEETS A1.02, C1.1, C1.2, & L1.0. ROUTED TO MIKE P. PARKS & REC DIRECTED DAVE SCHULTZ TO ADD ADDITIONAL SITE DRAINAGE AND TO REPLACE LANDSCAPING BETWEEN THE BUS LANE AND ROBBINS RD. WITH "BOMANITE" ODI # 1394 PER DAVE SCHULTZ. KMM
Routing Off Site - C.D.H9/23/1998 10/5/1998 PASS
CAROL MAY REVIEW PROJECT AS PLANS ARE BEING ROUTED. 10-05-98 CAME IN AND SIGNED PLANS OFF.
Plan Review Completed(1st rev)  9/24/1998 FAIL
UBC issues
Routing - FIRE9/23/1998 9/24/1998 PASS
conditions noted for temp exiting during construction
Plan Reviewer's activity  9/21/1998 FAIL
REQUESTED ADDITIONAL INFORMAITON FOR FURTHER REVIEW. rOUTED TO FIRE ON 9/23/98
Print Pending Permit.LaserJet4  9/21/1998 FAIL
REQUESTED ADDITIONAL INFORMATION FOR FURTHER REVIEW.
Plan resubmittals requested  9/21/1998 FAIL
Routing - PLUMBING8/20/1998 8/25/1998 PASS
Routing - PUBLIC WORKS8/13/1998 8/19/1998 PASS
Plans ACCEPTED BY PLAN TECH  8/13/1998 PASS
Routing - PLANNING8/13/1998 8/13/1998 PASS
Routing Off Site - STRUCTURAL8/13/1998 8/13/1998
ENG. WILL BE DONE INHOUSE.
Plan assigned to (MYS)8/12/1998 8/13/1998 PASS
DetailsMarlene Southard
Plan routing begun/NEW & ADDTN  8/13/1998 PASS
Received Certificate of Value  8/12/1998 PASS
Recd Pcfee & Taken To Pln CK  8/12/1998
je 501668708
Application received  8/12/1998