DOC - Permit Finaled | 1/25/2001 | 1/25/2001 | 1/25/2001 | P | PASS |
Jim Sly
|
|
|
Added by Inspector: 316 On 1/25/2001 12:50:42 PM
|
INSP - Letter of compliance | 1/13/1999 | 1/13/1999 | 1/13/1999 | | PASS |
Jim Sly
|
|
|
/ / 316 - C/C # 16339
|
INSP - Letter of compliance | 1/13/1999 | 1/13/1999 | 1/13/1999 | | PASS |
Jim Sly
|
|
|
/ / 316 - C/C # 16339
|
INSP - Final | 1/11/1999 | 1/12/1999 | 1/12/1999 | A | PASS |
Jim Sly
|
|
|
01/12/99 316 - C/C # 16339
|
INSP - Final | 1/8/1999 | 1/11/1999 | 1/11/1999 | A | FAIL |
Jim Sly
|
|
|
01/11/99 316 - Cancelled by builder
|
INSP - Framing/Rough-in | 11/19/1998 | 11/19/1998 | 11/19/1998 | | PASS |
Jim Sly
|
|
|
11/18/98 316 - ###-####
|
INSP - Energy code compliance | 11/18/1998 | 11/19/1998 | 11/19/1998 | P | PASS |
Jim Sly
|
|
|
11/19/98 316 - BRUCE ###-####
|
INSP - Framing/Rough-in | 11/12/1998 | 11/12/1998 | 11/13/1998 | P | PART |
Jim Sly
|
|
|
11/12/98 316 - shear wall OK
|
INSP - Foundation | 9/17/1998 | 9/17/1998 | 9/17/1998 | P | FAIL |
Jim Sly
|
|
|
09/17/98 316 - Foot width, soil, setbks appear OK..Cont foot there...No
|
Issue PAID IN FULL permit | | | 9/11/1998 | | |
|
|
|
|
Telephone call | | | 9/8/1998 | | |
|
|
|
talked to bruce gave dollar amount
|
Plan Reviewer's activity | | | 9/8/1998 | | PASS |
|
|
|
wall brace eng. rec. plans still do not comply. future submittals will be rejected if wall brace panels are not identified.
|
Print Pending Permit.LaserJet4 | | | 9/8/1998 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/8/1998 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 9/8/1998 | | |
|
|
|
|
Routing - PLAN CHECK | 8/17/1998 | | 9/8/1998 | | PASS |
|
|
|
|
Plan assigned to (DJO) | 8/14/1998 | | 9/8/1998 | | PASS |
Dan Overy
|
|
|
09/08/98 10:23:13 DJO - this action updated by action script from <<>> in Case No. BLD98-2466
|
Plan Reviewer's activity | | | 8/31/1998 | | PEND |
|
|
|
REJECTED. PLANS NEED TO INDICATE ALL BRACE WALL PANEL LOCATIONS, ALTERNATE PANELS WITH STRAPS AND SHEAR NAILING SCHEDULES AND ENGINEERING IF REQ.
|
Plans ACCEPTED BY PLAN CHECK | | | 8/28/1998 | | PEND |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 8/17/1998 | | |
|
|
|
|
Routing - PUBLIC WORKS | 8/14/1998 | | 8/14/1998 | | PASS |
|
|
|
|
Office Staff conference/action | | | 8/14/1998 | | PASS |
|
|
|
TALKED TO HEATHER AT ###-#### E.S. IS READY
|
Routing - PLANNING | 8/14/1998 | | 8/14/1998 | | PASS |
|
|
|
|
Application received | | | 8/14/1998 | | |
|
|
|
|