WAREMART INC. GENERAL OFFICE SHELL BUILDING - PHASE I * TO CONSTRUCT A NEW 32,000 SQ. FT., ONE STORY GENERAL OFFICE SHELL BUILDING AND RELATED SITE IMPROVEMENTS. CONSTRUCTED OF CONCRETE MASONRY EXTERIOR WALLS (NORTH EXTERIOR WALL CONSTRUCTED OF STEEL STUDS AND GYSPSUM WALL BOARD), CONCRETE SLAB FLOOR AND STEEL ROOF JOISTS WITH METAL ROOF DECK. THIS BUILDING IS FULLY FIRE SPRINKLED. THE SPRINKLERS ARE BEING USED FOR ALLOWABLE AREA INCREASE. THIS IS A SHELL PERMIT ONLY AND NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT. A SEPARATE TENANT IMPROVEMENT PERMIT IS REQUIRED TO FINISH THIS BUILDING FOR OCCUPANCY. DRH98-0129/CUP98-0083/JCM PC#567-98
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  8/12/1999 PASS
Letter of Compliance #17892 issued 8-12-99.
INSP - Final7/22/19997/22/19997/22/1999 PASS
DetailsCarl Dependahl
/ / 340 - SHELL FOR WINCO OFFICE...LC ONLY
INSP - Final7/7/19997/7/19997/7/1999 PASS
DetailsJoe Tawney
/ / 406 - REINSP OK FOR CERT OF COMPLETION
INSP - Final6/22/19996/22/19996/22/1999 PART
DetailsCarl Dependahl
/ / 340 - FILED ENG'S STATEMENT, NEED HVAC
INSP - Final5/12/19995/12/19995/12/1999PPART
DetailsCarl Dependahl
05/12/99 340 - Scheduled by Hello!. Contact phone is [6585232]. shell, need hvac ok
Temporary occupancy  5/12/1999 PASS
Temp. Occ. Cert. #3833 issued 5-12-99 to Waremart, inc. for offices.
INSP - Framing/Rough-in5/11/19995/11/19995/11/1999 PART
DetailsCarl Dependahl
/ / 340 - REC'D ENGS' LETTER OF ACCEPTANCE; NEED FINAL W/BLD98-3351
Code Occupancy Approval  4/30/1999 FAIL
Still need to put up fencing. Replace plate at frt. entry door - to the east and restake Pine behind the dumpster enclosure.
INSP-Final Inspection4/28/19994/29/19994/29/1999PNR
DetailsJoe Tawney
FINAL NOT READY ALARM SUBMITTALS NOT YET APPROVED
Fee Review-notes1/27/1999 4/28/1999 PASS
subs short
Fee Review-notes10/27/1998 4/28/1999
INSP-Sprinkler Rough-in/Hydro4/13/19994/13/19994/13/1999 PART
DetailsJoe Tawney
/ / 406 - OK RI AND PREACTION HYDRO TEST
INSP-Sprinkler Rough-in/Hydro4/13/19994/13/19994/13/1999 PART
DetailsJoe Tawney
/ / 406 - OK RI AND PREACTION HYDRO TEST
INSP-Sprinkler Rough-in/Hydro4/13/19994/13/19994/13/1999 PART
DetailsJoe Tawney
/ / 406 - OK RI AND PREACTION HYDRO TEST
INSP-Sprinkler Rough-in/Hydro4/6/19994/6/19994/6/1999 PART
DetailsJoe Tawney
/ / 406 - OK ON ABOVE GROUND HYDRO, OK TO COVER OK ON ROUGH IN EX 3 IT
INSP - Framing/Rough-in3/31/19993/31/19993/31/1999 NR
DetailsCarl Dependahl
/ / 340 - SHELL, NEED ALL REPORTS
INSP - Framing/Rough-in2/1/19992/2/19992/2/1999APART
DetailsCarl Dependahl
02/02/99 340 - ROGER ###-#### ROOMS #40-#42, #1-#18, #62-#63, #43-#48; p permit, need verify spec insp (338?)
INSP - Framing/Rough-in1/28/19991/29/19991/29/1999ANR
DetailsCarl Dependahl
01/29/99 340 - ROGER ###-#### ROOMS #62,#63,#44,#45,#30-#38,AND #1-#11, left msg
INSP-Supply line flush1/7/19991/8/19991/8/1999APART
DetailsJoe Tawney
01/08/99 406 - RANDY ###-#### -FLUSHING INSP- OK ON SUPPLY LINE FLUSH
INSP-Sprinkler Rough-in/Hydro1/7/19991/7/19991/7/1999PPART
DetailsJoe Tawney
01/07/99 406 - RANDY ###-#### UNGERGROUND SPRINKLER OK ON UNDERGROUND HYDRO TEST
INSP-Sprinkler Rough-in/Hydro1/4/19991/6/19991/6/1999ACANC
DetailsJoe Tawney
01/06/99 406 - randy -debest ###-####-underground flushing TEST CANCELLED TO BE RESCHEDULED
INSP - Framing/Rough-in12/22/199812/23/199812/23/1998APART
Details
12/23/98 338 - made ok to cover front canopy and inside of thr rear wall
INSP - Framing/Rough-in12/17/199812/18/199812/18/1998APART
Details
12/18/98 338 - roger davis- ###-#### fr insp-grid line e 1.4 to 4.8 for
INSP - Framing/Rough-in12/9/199812/9/199812/9/1998 PART
Details
12/09/98 338 - madeok for the submittals
INSP - Framing/Rough-in12/7/199812/7/199812/7/1998PPART
Details
12/07/98 333 - ROGER ###-#### MASONRY GRIDLINE 5, A TO E. GRIDLINE 1, A GRIDLINE A, 1 TO 5 ok pend spec insp report
INSP - Framing/Rough-in12/3/199812/4/199812/4/1998APART
Details
12/04/98 338 - roger ###-#### masonry gridlines 5 and 1, A to E AND GRIDLINE A, 1 TO 5 ALSO WELDING CONFERENCE MADE OK TO COVER WITH SP INSP
INSP - Framing/Rough-in11/30/199812/1/199812/2/1998APART
Details
12/02/98 338 - CHRIS ###-#### MASONARY INSP-GRID LINE 5-BETWEEN A&E GRID 1-BETWEEN A & E, GRID A BETWEEN 1&5 made ok with sp insp approval.
INSP - Framing/Rough-in11/19/199811/20/199811/20/1998APART
Details
11/20/98 338 - ok with other agencies approval.
INSP - Wall cover11/19/199811/20/199811/20/1998APART
Details
11/20/98 338 - EXTERIOR WALL AND MASONRY..ROGER ###-####..GRID A TO E GRID 2 TO 3....GRID A TO C...GRID 3 TO 4..MASONRY IS GRID LINE 1 & 5...A TO E....COOL HUH?? madeok with sp insp approval.
INSP - Concrete11/17/199811/19/199811/19/1998APART
Details
11/19/98 338 - ROGER ###-#### SLAB CONCRETE ON GRIDLINES 4 TO 5, A TO E AND GRIDLINES 1 TO 2, A TO E made ok with sp inspand other agencies approval
INSP - Framing/Rough-in11/17/199811/18/199811/19/1998APART
Details
11/19/98 338 - ROGER ###-#### MASONRY ON GRIDLINE 5, A TO E made ok with
INSP - Framing/Rough-in11/18/199811/18/199811/18/1998 PART
Details
11/18/98 338 - made ok with sp insp approval
INSP - Concrete11/3/199811/3/199811/3/1998PPART
Details
11/03/98 338 - ROGER ###-#### GRID LINES 3 TO 4 GRID LINES C.5 TO E made
INSP - Foundation10/29/199810/30/199810/30/1998APART
Details
10/30/98 338 - roger ###-#### stem wall GRID E/TWO TO FIVE, GRID FIVE/D TO E made ok to pour with the sp inspection approval
INSP - Foundation10/29/199810/29/199810/29/1998PPART
Details
10/29/98 338 - ith sp insp approval
INSP - Foundation10/28/199810/28/199810/28/1998 PART
Details
10/28/98 338 - ROGER ###-#### FOOTING GRID 2/B,C,D GRID3/B,C GRID 4/B,Cmade ok to pour with sp insp approval
INSP - Foundation10/26/199810/27/199810/27/1998APART
Details
10/27/98 338 - ROGER ###-####-FT INSP-GRID LINE E-1-5-GRID LINE 1-C-E-STEM WALLS-GR LN A-1-5-GR-1&5-A TO C made ok with sp insp approval
INSP - Foundation10/23/199810/26/199810/26/1998APART
Details
10/26/98 338 - roger ###-#### gridline A between 1 and 5, gridline 5 between A and D, stemwall
INSP - Foundation10/20/199810/21/199810/21/1998PPART
Details
10/21/98 338 - made ok for footing pour, bob arnold eisi on site for spe
(F) Reprint permit  10/9/1998
Issue PAID IN FULL permit  10/8/1998
Telephone call  10/7/1998 PASS
TALKED TO RHONDA-TOLD HER WE NEED ACHD APPROVAL 1ST BE ISSUING
Routing - PLAN CHECK9/15/1998 10/2/1998 PASS
Plan resubmittals received  10/2/1998 PASS
STRUCTURAL REVIEW LETTER BY CH2M HILL
Print Occupancy Form  10/2/1998
Inspection Record Card- Bld  10/2/1998
PLANS/APPL TAKEN TO FRONT DESK  10/2/1998 PASS
Routing Off Site - STRUCTURAL9/25/1998 10/2/1998 PASS
Plan assigned to (JCM)8/17/1998 10/2/1998 PASS
DetailsJohn Menard
Plan resubmittals received  9/24/1998 PEND
Plan resubmittals received  9/24/1998
RECEIVED 3 COPIES OF REVISED STRUCTURAL DRAWINGS S2.1, S2.2, AND S3.0. THREE COPIES OF REVISED STRUCTURAL CALCS. THREE COPIES OF ARCH. DRAWIGNS A5.0, A5.1, AND A-6. ONE COPY OF SOILS REPORT. ROUTED TO JOHN M.
Plan Review Completed(1st rev)  9/15/1998 PASS
Routing - FIRE9/10/1998 9/15/1998 PASS
Plan resubmittals requested  9/10/1998 PEND
MAILED DOUG RACINE A COPY OF THE COMMENT LIST REQUESTING REVISIONS.
Routing Off Site - STRUCTURAL8/17/1998 9/10/1998
CONTACTED PDQ TO TAKE PLANS OUT TO CH2MHILL
Routing - PLANNING9/2/1998 9/8/1998 PASS
PER DRH98-0129 AND CUP98-83
Received Certificate of Value  9/4/1998 PASS
REVISED CERT. OF VALUE MINUS GRADING VALUE
Routing - PLAN CHECK8/31/1998 9/2/1998
Routing - PLANNING8/26/1998 8/27/1998 PEND
Design Review approved per DRH98-0129. Plans must also be approved by conditional use analyst.
Routing - PLUMBING8/25/1998 8/25/1998 PASS
Routing - PUBLIC WORKS8/17/1998 8/25/1998 PASS
Received Certificate of Value  8/18/1998 PASS
RECEIVED CERTIFICATE OF VALUE, FILLED IN PROPERLY AND SIGNED. DAR
Plan routing begun/NEW & ADDTN  8/17/1998
Plan assigned to (MYS)8/14/1998 8/17/1998
DetailsMarlene Southard
Plans ACCEPTED BY PLAN TECH  8/17/1998 PASS
REQUIRES SOILS REPORT. RECEIVED SOILS REPORT 8/18/98
Received Certificate of Value  8/17/1998 FAIL
REQUIRES ELEC. PLUMB. MECH. AND FIRE SPRINKLER VALUES TO BE FILLED OUT BEFORE ISSUANCE. CONTACTED STEVE PARDEW AND TOLD HIM OF THIS NEED. KMM
Recd Pcfee & Taken To Pln CK  8/14/1998
Application received  8/14/1998