Permit Information
Permit NumberBLD98-02479
StatusFinaled
Name COLUMBIA MARKET "B" (SHELL)
Site Address 6458 S FEDERAL WAY
Project NameCOLUMBIA MARKET "B"
Customer Number 
ePlanReviewNo
Description
COLUMBIA VILLAGE MARKET PLACE BUILDING "B" (SHELL PERMIT) - TO CONSTRUCT A NEW 8,120 SQ. FT., ONE STORY, RETAIL LEASE SPACE SHELL BUILDING AND RELATED SITE IMPROVEMENTS AS PART OF THE COLUMBIA MARKET COMPLEX. CONSTRUCTED OF CMU EXTERIOR WALLS, CONCRETE SLAB FLOOR AND STEEL ROOF JOISTS AND DECK WITH BUILT-UP ROOFING SYSTEM. THIS BUILDING IS FULLY FIRE SPRINKLED. THIS IS A SHELL PERMIT ONLY WITH NO OCCUPANCY ALLOWED UNDER THIS PERMIT. A SEPARATE TENANT IMPROVEMENT PERMIT IS REQUIRED TO FINISH EACH TENANT SPACE. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. DR#19-97/CU#6-95/PC#548-97/JCM THE SITE GRADING AND DRAINAGE PERMIT IS BLD98-0901. (BUILDINGS "A" & "B" WERE SUBMITTED UNDER ONE SET OF PLANS)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
(F) Reprint permit  10/20/2004 DONE
Letter of compliance  11/23/1999 DONE
Letter of Compliance #18192 issued 11-23-99.
BLD-Final11/12/199911/15/199911/15/1999APART
DetailsJim Storey
Call 1st - Mike # ###-#### - he will meet you on this one at the same as Bldg. A pend special insp. Resolve of discrepence.
Fee Review-notes5/24/1999 8/20/1999
Code Occupancy Approval  8/17/1999 PASS
ALL LANDSCAPE HAS NOW BEEN COMPLIED WITH, FINAL SIGNED OFF.
SUPER- Supervisor's review8/9/19998/9/19998/9/1999
sent letter to g himes. dave lightfoot call for roof access ladder to extend to within 8 feet of grade. this is the correct call and i sent the code to gary
INSP-Final Inspection8/5/19998/5/19998/5/1999PPART
DetailsRick Jackson
temp occ approved; need spare heads and proper sized outlet on inspectors test
INSP-Alarm Testing8/2/19998/5/19998/5/1999APASS
DetailsRick Jackson
sprinkler system monitored okay; alarms okay
INSP-Alarm Testing7/20/19997/21/19997/21/1999AFAIL
DetailsRick Jackson
GEORGE PAGER ###-#### no phone lines
Code Occupancy Approval  7/19/1999
Final requested by George Maxwell ###-#### pager
INSP-Final Inspection7/15/19997/15/19997/15/1999AFAIL
DetailsRick Jackson
need to test alarms and sprinklers; knox box; off site monitoring
INSP-Final Inspection7/14/19997/14/19997/14/1999ANR
DetailsRick Jackson
GEORGE ###-#### PAGER talked to him on phone and alarms not ready
Code Occupancy Approval  6/8/1999 FAIL
BOND POSTED FOR $5000, DRH97-0019 REQUIRMENTS, NORTH FENCE AND SPEED BUMPS, WILL SIGN TEMPORARY WHEN CARD FOUND.
Print Occupancy Form  5/5/1999
INSP-Supply line flush4/30/19994/30/19994/30/1999PPASS
DetailsRick Jackson
flush okay
INSP - Framing/Rough-in4/2/19994/5/19994/5/1999PPART
DetailsJim Storey
04/05/99 301 - front canopy pending ele work in progess.
INSP - Framing/Rough-in3/30/19993/31/19993/31/1999AFAIL
DetailsJim Storey
03/31/99 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP-Sprinkler Rough-in/Hydro3/12/19993/12/19993/12/1999 PART
DetailsRick Jackson
/ / 409 - UNDERGROUND OKAY TO COVER
INSP - Foundation2/5/19992/5/19992/5/1999 PASS
DetailsJim Storey
/ / 301 - REVIEWED SPECIAL INSPECTION REPORTS AND ARCHIVED
INSP - Foundation2/3/19992/3/19992/3/1999PPART
DetailsJim Storey
02/03/99 301 - covered with special insp. pending report
INSP - Concrete2/1/19992/2/19992/2/1999PFAIL
DetailsJim Storey
02/02/99 301 - n/r
INSP - Foundation1/28/19991/29/19991/29/1999PPART
DetailsJim Storey
01/29/99 301 - covered by special insp. pending report.
INSP - Foundation1/25/19991/26/19991/26/1999PCANC
DetailsJim Storey
01/26/99 301 - called and canclled
INSP - Foundation1/22/19991/25/19991/25/1999PCANC
DetailsJim Storey
01/25/99 301 - office called and cancled
INSP - Foundation1/19/19991/20/19991/20/1999PFAIL
DetailsJim Storey
01/20/99 301 - a bld. nw front colum rebar not tied in place. have engin
INSP - Foundation1/13/19991/14/19991/14/1999PPART
DetailsJim Storey
01/14/99 301 - COVERED WITH S/I PENDING REPORT.
INSP - Foundation1/12/19991/13/19991/13/1999PPART
DetailsJim Storey
01/13/99 301 - covered with s/i pending repore rebar ok
INSP - Foundation1/11/19991/12/19991/12/1999PPASS
DetailsJim Storey
01/12/99 301 - FRMS-OK FORMS pending s/i report.
INSP - Foundation1/8/19991/8/19991/8/1999 PART
DetailsRuss Owen
/ / 407 - NEED OK FROM ENGINEER TO EPOXIE SOME ANCHOR BOLTS.CONTRACTOR
INSP - Framing/Rough-in1/6/19991/7/19991/8/1999PFAIL
DetailsJim Storey
01/07/99 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED report discrep
INSP - Foundation1/5/19991/6/19991/6/1999PPART
DetailsJim Storey
01/06/99 301 - coved with special insp pending report.
INSP - Foundation12/30/199812/31/199812/31/1998ANR
DetailsJim Storey
12/31/98 301 - CARL- ###-#### FT BLD B
(F) Reprint permit  12/15/1998
Telephone call  12/14/1998
called permit ready
Print Occupancy Form  12/14/1998
Issue PAID IN FULL permit  12/14/1998
Inspection Record Card- Bld  12/14/1998
PLANS/APPL TAKEN TO FRONT DESK  12/14/1998 PASS
Plan resubmittals received  12/14/1998 PASS
RECEIVED COPY OF RECORDED LOT LINE ADJUSTMENT.
Plan assigned to (JCM)8/10/1998 12/14/1998 PASS
DetailsJohn Menard
Routing - PLAN CHECK10/23/1998 12/14/1998 PASS
Plan resubmittals received  11/9/1998
RECEIVED TWO COPIES OF REVISED PLANS SHEETS 1.0, 2.0, 2.1, 2.3, 2.4, 3.0, 3.1, 3.2, 3.4, PLUS ONE COVER LETTER. ROUTED TO JOHN M.
Routing - PLAN CHECK9/24/1998 10/23/1998 PEND
Plan resubmittals received  10/23/1998
RECEIVED 2 COPIES OF CONSTRUCTION DOCUMENTS, TWO PROJECT MANUALS, AND ONE COMMENT REVIEW LETTER. ROUTED TO JOHN M. KMM
Routing - PLANNING10/23/1998 10/23/1998 PASS
approved per DRH97-0019 and CU-6-95.
Routing - PUBLIC WORKS9/24/1998 9/24/1998 PASS
Routing - PLAN CHECK9/16/1998 9/24/1998
Plan Review Completed(1st rev)  9/16/1998 FAIL
planning,pw and ubc
Routing - FIRE9/14/1998 9/16/1998 PASS
Plan resubmittals requested  9/9/1998 PEND
FAXED TIM STAGGS A COPY OF THE COMMENT LIST FROM THE CONSULTING ENGINEER REQUESTING REVISIONS.
Routing Off Site - STRUCTURAL8/17/1998 9/9/1998
CONTACTED PDQ TO TAKE PLANS OUT TO CH2MHILL. REQUIRES SOILS REPORT. WHEN RECEIVE SEND TO CH2MHILL RECEIVED SOILS REPORT, FORWARDED SAME TO CH2MHILL.
Routing - PLUMBING8/28/1998 8/31/1998 PASS
Routing - PLANNING8/26/1998 8/27/1998 PEND
Design Review approved per DRH97-0019. Building permit approval is pending the conditional use analyst review and approval.
Routing - PUBLIC WORKS8/20/1998 8/25/1998 FAIL
Plan resubmittals requested  8/19/1998 PEND
MAILED TIM STAGGS AT PETERSEN-STAGGS A COPY OF THE COMMENT LIST REQUESTING REVISIONS.
Routing - PLAN CHECK8/17/1998 8/19/1998
Plans ACCEPTED BY PLAN TECH  8/17/1998 PASS
RECEIVED 1. EXTRA STRUCT. CALCS. 2, A NEW CERT. OF VALUE FOR BLDG. "A" 3. AN APPLICATION FOR BLDG. "B" STILL WAITING FOR A SOILS REPORT. HOWEVER WILL ROUTE TO OUTSIDE ENG. AND SEND REPORT OVER TO CH2MHILL WHEN I RECEIVE IT. RECEIVED SOILS REPORT, FORWARDED SAME TO CH2MHILL (8-18-98) DAR
Plan routing begun/NEW & ADDTN  8/17/1998
Received Certificate of Value  8/14/1998 PASS
Application received  8/14/1998
Plans ACCEPTED BY PLAN TECH  8/10/1998 FAIL
REQUIRES A SOILS REPORT, AN ADDITIONAL COPY OF STRUCT. CALCS., A NEW CERT. OF VALUE MINUS BLDG. "B", AND AN APPLICATION FOR BUILDING "B". CONTACTED TRACY OF PETERSON STAGGS AT ###-####
INSP - Foundation1/4/19981/4/19981/4/1998 PART
DetailsJim Storey
01/04/99 301 - placed w/si pending report.
INSP - Final1/1/19591/1/19591/1/1959 CANC
DetailsJim Storey
07/15/99 301 - called and canclled