Permit Information
Permit NumberBLD98-02492
StatusFinaled
Name DENNIS ROBINSON
Site Address 408 E PARKCENTER BLVD
Project NameRIVER QUARRY BLD B-SHEL
Customer Number 
ePlanReviewNo
Description
RIVER QUARRY AT PARKCENTER BUILDING "B"(PHASE II) * TO CONSTRUCT A NEW 53,980 SQ. FT., THREE-STORY, OFFICE (SHELL AND CORE) BUILDING, CONSTRUCTED OF MASONRY EXTERIOR WALLS, STEEL INTERIOR STRUCTURAL FRAME, METAL STUD INTERIOR PARTITIONS, MASONRY SHAFT AND STAIR ENLCOSURE WALLS, CONCRETE AND METAL PAN FLOOR SYSTEM AND METAL PAN ROOF WITH WOOD TRUSS OVERBUILD AT THE BUILDING PERIMETER. THIS PERMIT ALSO INCLUDES RELATED SITE IMPROVEMENTS. THIS BUILDING IS FULLY FIRE SPRINKLED. THE SPRINKLERS ARE BEING USED FOR ONE-HOUR FIRE-RESISTIVE SUBSTITUTION. THIS IS A SHELL AND CORE PERMIT ONLY AND NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT. SEPARATE TENANT IMPROVEMENT PERMITS ARE REQUIRED TO FINISH THIS BUILDING. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. ALL CONSTUCTION TO BE DONE IN ACCORDANCE WITH THE BOISE CITY FLOOR PLAIN ORDINANCE. A FLOOD PLAIN ELEVATION CERTIFICATE TO BE SUBMITTED BY THE LICENSED ENGINEER OR LAND SURVEYOR TO THE STRUCTURAL INSPECTOR PRIOR TO CALLING FOR A ROUGH FRAMING INSPECTION. FOUNDATION PERMIT IS BLD98-1774 DRH98-0028/DR101-9/CUP98-0036/FPR-8-97/98-589/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes2/23/20002/23/20006/20/2000 DONE
Letter of compliance  6/15/2000 DONE
Letter of Compliance #18513 issued 6-15-00.
BLD-Final6/9/20006/12/20006/12/2000APASS
DetailsJim Storey
dave ###-####
Code Occupancy Approval  6/9/2000 PASS
ALL CONDITIONS UNDER DRH98-00028 FOR THIS BUILDING HAVE BEEN MET. FINAL SIGNED OFF AND BOND RELEASED THIS DATE 6-9-00.
Temporary occupancy  6/1/2000 PART
Temp. Occ. Cert. #4022 issued 6-1-00 to the River Quarry, Bldg. "B".
BLD-Final5/26/20005/26/20005/30/2000PNR
Details
Mel ###-#### done bt 301 5/30/00 10:57:43 AM
FIRE-Final Inspection5/25/20005/25/20005/25/2000PPASS
DetailsRick Jackson
BLD-Wall cover5/12/20005/15/20005/15/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 05/12/2000 at 16:35:31. Contact: ###-####. c/n on site fire stopping third floor north loby ceilling. tape fasteners first floor north loby south wall. handrail third floor countinous at guardrail/handrail cou 5/15/00 11:00:14 AMntinous. 5/15/00 11:00:33 AM
BLD-Framing/Rough-in4/11/20004/13/20004/13/2000ANR
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/11/2000 at 14:48:04. Contact: 084660006.
FIRE-Sprinkler Rough-in4/3/20004/4/20004/4/2000AFAIL
DetailsRick Jackson
checked attic area - sprinkler head bent
BLD-Framing/Rough-in3/27/20003/28/20003/28/2000APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/27/2000 at 14:57:20. Contact: ###-####. third floor ok 3/28/00
BLD-Framing/Rough-in3/22/20003/23/20003/23/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/22/2000 at 16:32:20. Contact: ###-####. 2 nd floor shaft ok 3/23/00 11:33:39 AM
BLD-Framing/Rough-in3/21/20003/22/20003/22/2000AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/21/2000 at 12:59:46. Contact: ###-####. truss engineer to field review and respond to truss conections hc2a/hc2b to verrify that design values have been achived. truss engineer to give min. load bearing at#13 truss hc1. seal draftt stops. missing sprinkler at south stair attic space. 3/22/00 10:55:19 AM
BLD-Framing/Rough-in3/20/20003/21/20003/21/2000AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/20/2000 at 15:36:35. Contact: ###-####. Still needs more fire caulk at penetrations of membrane 3/21/00 4:18:45 PM
BLD-Framing/Rough-in3/16/20003/17/20003/17/2000AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/16/2000 at 12:44:22. Contact: ###-####. C/N posted 3/17/00 2:40:29 PM
BLD-Framing/Rough-in3/2/20003/2/20003/2/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/02/2000 at 09:56:12. Contact: ###-####. C/N 5 items ok to start gyp. 1st fl. 3/2/00 4:45:53 PM
FIRE-Supply Line Flush2/24/20002/28/20002/28/2000APASS
DetailsRick Jackson
mid morning ###-#### Underground flush okay. 2/28/00 2:41:30 PM
BLD-Framing/Rough-in2/25/20002/28/20002/28/2000PPASS
DetailsJim Storey
ready at 2 roof nailing north end ###-#### Roof deck nailing ok. 2/29/00 2:59:47 PM
BLD-Framing/Rough-in2/11/20002/11/20002/11/2000PPART
DetailsJim Storey
###-#### \\building b SWE roof nail ok. 2/14/00 2:03:44 PM
BLD-Framing/Rough-in12/6/199912/7/199912/7/1999APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/06/1999 at 09:53:08. Contact: ###-####. Ok floor deck 2nd floor SW corner.
BLD-Framing/Rough-in12/1/199912/1/199912/1/1999PPART
DetailsJim Storey
MEL ###-#### Work in progress Idems for engineers review in RFI.
INSP - Foundation9/1/19999/2/19999/2/1999APART
DetailsJim Storey
09/02/99 301 - ok pending special insp report
INSP - Foundation8/25/19998/26/19998/26/1999APART
DetailsJim Storey
08/26/99 301 - plcced intior ft w/si pending report
INSP - Foundation8/24/19998/24/19998/24/1999PPART
DetailsJim Storey
08/24/99 301 - placed w/special insp. pending report
INSP - Framing/Rough-in8/18/19998/19/19998/19/1999APART
DetailsJim Storey
08/19/99 301 - rebar ok grid 1 colums
INSP - Foundation8/10/19998/11/19998/11/1999APART
DetailsJim Storey
08/11/99 301 - MEL ###-#### AS EARLY AS POSSIBLE/POURING AT 11:00 AM
INSP - Foundation8/10/19998/10/19998/10/1999PPART
DetailsRuss Owen
08/10/99 407 - requires special inspection.
INSP - Foundation8/5/19998/5/19998/5/1999PPART
DetailsJim Storey
08/05/99 301 - special insp pending as well as letter for engineers bar
INSP - Foundation8/4/19998/4/19998/4/1999PPART
Details
08/04/99 338 - made ok for the south wall center to the west and aprox 2
INSP - Foundation8/3/19998/3/19998/3/1999PFAIL
Details
08/03/99 338 - REBAR/FOOTING NEIL ###-#### need clearance bars in large
(F) Reprint permit  6/23/1999
Issue PAID IN FULL permit  6/22/1999
Routing - PLAN CHECK9/25/1998 1/20/1999 PASS
Plan assigned to (JCM)8/24/1998 1/20/1999 PASS
DetailsJohn Menard
Inspection Record Card- Bld  1/20/1999
PLANS/APPL TAKEN TO FRONT DESK  1/20/1999 PASS
Print Occupancy Form  1/20/1999
Inspection Record Card- Bld  1/20/1999
Inspection Record Card- Bld  1/20/1999
Telephone call  1/20/1999
called dan johnson at ###-####
Plan resubmittals received  1/19/1999 PEND
RECEIVED RESUBMITTALS FROM BRS FORWARDED SAME TO JOHN MENARD. DAR 1/19/99
Routing Off Site - STRUCTURAL12/8/1998 12/18/1998 PASS
SENT RESUBMITTALS TO ATWOOD, HINZMAN, JONES ON 12/08/98 DAR
Plan Reviewer's activity  12/8/1998 PASS
REVISIONS HAVE BEEN REVIEWED AND APPROVED AS SUBMITTED AND NOTED. WAITING FOR REVIEW ON STRUCTURAL RESUBMITTALS.
Plan resubmittals received  12/7/1998 PEND
RECEIVED PLAN RESUBMITTALS FROM DAN JOHNSON, BRS ARCHITECTS, FORWARDED SAME TO JOHN MENARD. DAR 12/07/98 THIS IS THE RESPONSE TO THE ORIGINAL REQUEST FOR REVISIONS SENT 09/23/98. JCM
Plan Review Completed(1st rev)  9/25/1998 FAIL
UBC issues
Routing - FIRE9/24/1998 9/25/1998 PASS
Routing - PLAN CHECK9/9/1998 9/24/1998 PEND
Plan resubmittals requested  9/23/1998 PEND
MAILED DAN JOHNSON AT BRS A COPY OF THE COMMENT LIST REQUESTING REVISIONS.
Routing - PLUMBING9/3/1998 9/8/1998 PASS
Routing Off Site - STRUCTURAL8/24/1998 9/3/1998 PEND
CONTACTED PDQ TO TAKE PLANS OUT TO ATWOOD HINZMAN AND JONES
Routing - PLANNING8/31/1998 9/3/1998 PASS
drh98-0028
Plan resubmittals received  9/2/1998 PEND
RECEIVED RESUBMITTALS FROM BRS, FORWARDED SAME TO JOHN MENARD.
Plan resubmittals requested  9/1/1998 PEND
FAXED DAN JOHNSON AT BRS A COPY OF THE STRUCTURAL REVIEW COMMENTS FROM ATWOOD-HNZMAN-JONES REQUESTING RESUBMITTALS.
Routing - PUBLIC WORKS8/24/1998 8/28/1998 PASS
Plans ACCEPTED BY PLAN TECH  8/24/1998 PASS
Received Certificate of Value  8/24/1998 PASS
Plan routing begun/NEW & ADDTN  8/24/1998
Plan assigned to (MYS)8/17/1998 8/24/1998
DetailsMarlene Southard
Recd Pcfee & Taken To Pln CK  8/17/1998
Application received  8/17/1998
Case Summary (BLD)