Information based on query as of Monday, July 1, 2024.
Permit Information
Permit NumberBLD98-02534
StatusFinaled
Name NYK LINE
Site Address 101 S CAPITOL BLVD
Project NameUS BANK - 3RD FLR
Customer Number 
ePlanReviewNo
Description
To remodel a 4,000 sq.ft. area of the floor for a new office tenant per approved plans on file. Work to include demolition of interior office partitions and existing ceiling system, construction of new noncombustible 1-hr. tenant demising walls between 2 tenant spaces, installation of a new suspended ceiling system, upgrade of the 1-hr. corridor walls between the tenant space and the main core area, construction of new noncombustible partitions for a copy room, office and break room. NOTE: This building is fully fire sprinklered. (P.C.#485-98) MYS
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/2/2013 DONE
Fee Review-notes9/18/1998 12/15/1998
Permanent Occupancy 10/23/199810/23/1998 DONE
Details
Permanent occupancy  10/23/1998 PASS
Perm. Occ. Cert. #7469 issued 10-23-98 to the NYK Line.
INSP - Final10/20/199810/21/199810/21/1998APASS
Details
10/21/98 333 - card signed for perm
INSP-Final Inspection10/20/199810/21/199810/21/1998APASS
DetailsRick Jackson
TOM KARR ###-#### FN FIRE INSP-3RD FLOOR occ approved
INSP-Final Inspection10/19/199810/20/199810/20/1998AFAIL
DetailsRick Jackson
MAGGIE ###-#### alarm speaker not installed
INSP - Final10/19/199810/20/199810/20/1998APASS
Details
10/20/98 333 - MAGGIE ###-#### other trades not signed
INSP-Final Inspection10/19/199810/19/199810/19/1998 FAIL
Details
10/19/98 333 - canc
INSP - Final10/19/199810/19/199810/19/1998 FAIL
Details
10/19/98 333 - canc
INSP - Framing/Rough-in10/12/199810/13/199810/13/1998APASS
Details
10/13/98 333 - TOM ###-#### CEILING COVER CLG -OK CEILING COVER
INSP - Wall cover10/8/199810/9/199810/9/1998PPART
DetailsJim Storey
10/09/98 301 - TOM ###-#### CEILING COVER CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP - Wall cover10/7/199810/8/199810/8/1998PFAIL
DetailsJim Storey
10/08/98 301 - TOM ###-#### CEILING COVER tom called and cancled.
INSP - Framing/Rough-in10/5/199810/5/199810/5/1998PPART
DetailsJim Storey
10/05/98 301 - TOM ###-#### CELL OFFICE ###-#### partion walls covered with out insp. c/n for fire stopping of floor and corridor penatrations posted .
Inspection Record Card- Bld  8/31/1998
PLANS/APPL TAKEN TO FRONT DESK  8/31/1998 PASS
Print Pending Permit.LaserJet4  8/31/1998 PASS
Issue PAID IN FULL permit  8/31/1998
Print Occupancy Form  8/31/1998
Telephone call  8/31/1998
CALLED CARR PERMIT READY
Plan routing begun/TENANTS  8/27/1998
This plan was officially routed. Sewer fees are the same as the last permit (BLD98-2135) and after talking to Floyd there aren't any changes he needs to review that differ from plan submitted under BLD98-2135.
Plan assigned to (MYS)8/19/1998 8/27/1998 PASS
DetailsMarlene Southard
8/26/98-plan check complete. Called the builder and Tony Ray at Ehrlich-Rominger to notify that it was ready and we were awaiting the copy of the contract so fees and refunds could be determined. Tony told me that they will be reviewing with the tenant on 8/27 and will FAX me a copy when everything is worked out.
Routing - FIRE8/25/1998 8/25/1998 PASS
Application received  8/19/1998
Recd Pcfee & Taken To Pln CK  8/19/1998