Case Summary (BLD) | | | 7/31/2001 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 1/3/2001 | | DONE |
|
|
|
|
BLD-Final | 12/23/1999 | 12/23/1999 | 12/23/2000 | P | FAIL |
Carl Dependahl
|
|
|
for temp occ --###-####-gene. Fire failed, recall.
|
Letter of compliance | | | 1/24/2000 | | DONE |
|
|
|
Letter of Compliance #18343 issued 1-24-00.
|
BLD-Final | 1/13/2000 | 1/13/2000 | 1/13/2000 | P | PASS |
Tom Arcoraci
|
|
|
###-#### GENE
|
FIRE-Final Inspection | 1/7/2000 | 1/10/2000 | 1/10/2000 | A | PASS |
Joe Tawney
|
|
|
Gene ###-####. Reinsp. Of for perm. Occ.
|
FIRE-Final Inspection | 12/22/1999 | 12/23/1999 | 12/23/1999 | A | FAIL |
Joe Tawney
|
|
|
###-####. Reinsp. fail need LED's for duct detectors.
|
BLD-Final | 12/22/1999 | 12/23/1999 | 12/23/1999 | P | FAIL |
Tom Arcoraci
|
|
|
Gene ###-####. Not ready.
|
Code Occupancy Approval | | | 12/22/1999 | | DONE |
|
|
|
MEETS COMPLIANCE WITH drh96-00060- PASS
|
BLD-Final | 12/14/1999 | 12/15/1999 | 12/15/1999 | A | FAIL |
|
|
|
c/n issued 1) need protection for bathroom drain pipes unter lavs, ALL
2) stair rail and extensions not per plans see sheet A/7 1 and 2 rail too high at the bottom this is not a vallute (3) need fire signoff. (4) doors on corridors do not latch and seal properly both floors. (5) provide assy per plan review note for the full height wall at the corridors near the stairs. (6) provide final signoff for the special inspections, by the str. eng of record. Gene ###-####
|
BLD-Final | 12/13/1999 | 12/15/1999 | 12/14/1999 | P | CANC |
Jim Sly
|
|
|
###-####- gene fn
|
FIRE-Final Inspection | 12/10/1999 | 12/15/1999 | 12/14/1999 | A | CANC |
Joe Tawney
|
|
|
GENE ###-####
|
BLD-Final | 12/10/1999 | 12/14/1999 | 12/14/1999 | A | CANC |
Carl Dependahl
|
|
|
GENE ###-####
|
FIRE-Final Inspection | 12/14/1999 | 12/14/1999 | 12/14/1999 | A | FAIL |
Joe Tawney
|
|
|
Reinsp. test duct detectors & install LED's.
|
Code Occupancy Approval | | | 12/13/1999 | | FAIL |
|
|
|
N/R - Bike rack needs to be installed - small amt. of soil aid needed to be brought on site for planter strip at the north of prkg by contr. trailer, finish planter at trash encl. - few small arbs and soil aid. Need to bond $330.00 for temp - or finish and call for final.
|
FIRE-Final Inspection | 12/9/1999 | 12/10/1999 | 12/10/1999 | A | FAIL |
Joe Tawney
|
|
|
gene -###-#### fire fn Reinsp. Fail duct detectors, door closens.
|
BLD-Final | 12/9/1999 | 12/10/1999 | 12/10/1999 | P | FAIL |
Jim Sly
|
|
|
gene ###-#### fn occ Not ready.
|
FIRE-Final Inspection | 12/2/1999 | 12/3/1999 | 12/3/1999 | A | FAIL |
Joe Tawney
|
|
|
gene ###-#### Final fail C/N issued.
|
BLD-Final | 12/3/1999 | 12/3/1999 | 12/3/1999 | P | FAIL |
Jim Sly
|
|
|
TEMP OCC GENE ###-#### Not ready.
|
BLD-Framing/Rough-in | 12/1/1999 | 12/1/1999 | 12/1/1999 | P | PASS |
Jim Sly
|
|
|
CEILING GRID AND FRAMING GENE ###-#### Ceiling grid & firestopping ok.
|
Fee Review-notes | 5/24/1999 | | 11/29/1999 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 11/23/1999 | 11/24/1999 | 11/24/1999 | A | PASS |
Jim Sly
|
|
|
gene ###-####
|
BLD-Framing/Rough-in | 10/29/1999 | 10/29/1999 | 10/29/1999 | P | PASS |
Jim Sly
|
|
|
gene ###-#### fr insp Frame ok pending spec. insp. And approval
|
BLD-Framing/Rough-in | 10/11/1999 | 10/12/1999 | 10/12/1999 | A | PART |
Jim Sly
|
|
|
###-#### FR INSP pre inspection walk thru (frame)
|
BLD-Concrete | 9/21/1999 | 9/24/1999 | 9/24/1999 | A | PART |
Jim Sly
|
|
|
###-####-- SLAB POUR- 2ND FLOOR Slab ok 2nd floor pending special insp. Report and appr.
|
BLD-Framing/Rough-in | 9/21/1999 | 9/22/1999 | 9/22/1999 | P | PART |
Jim Sly
|
|
|
GENE ###-#### -REBAR- & WIRE MESH -2ND FLOOR Pan deck 2nd floor ok pending special insp. & approval
|
BLD-Framing/Rough-in | 9/20/1999 | 9/21/1999 | 9/21/1999 | A | PART |
Jim Sly
|
|
|
jene-- ###-#### -welding insp- 2ND FLOOR welding, pending special insp. Reports and approval
|
INSP - Concrete | 8/25/1999 | 8/26/1999 | 8/26/1999 | A | PART |
Tom Arcoraci
|
|
|
pouring at 6am- SPEC INSP ON SITE
|
INSP - Framing/Rough-in | 8/11/1999 | 8/12/1999 | 8/12/1999 | A | PART |
Jim Sly
|
|
|
08/12/99 316 - West and North tilt up panels OK...Pending special insp t
|
INSP - Foundation | 8/6/1999 | 8/11/1999 | 8/11/1999 | A | PART |
Jim Sly
|
|
|
08/11/99 316 - Tilt up panels OK pending special insp tests and approval
|
INSP - Foundation | 8/6/1999 | 8/10/1999 | 8/10/1999 | A | PART |
Jim Sly
|
|
|
08/10/99 316 - Tilt up walls OK PENDING special insp tests and approvals
|
INSP - Foundation | 8/6/1999 | 8/9/1999 | 8/9/1999 | A | PART |
Tom Arcoraci
|
|
|
08/09/99 408 - spec insp at site
|
INSP - Foundation | 8/5/1999 | 8/5/1999 | 8/5/1999 | P | PART |
Jim Sly
|
|
|
08/05/99 316 - North and west tilt walls OK pending special insp tests a
|
INSP - Framing/Rough-in | 7/19/1999 | 7/20/1999 | 7/20/1999 | A | PART |
Jim Sly
|
|
|
07/20/99 316 - Tilt up panels OK pending special insp tests and approval
|
(F) Reprint permit | | | 7/13/1999 | | |
|
|
|
|
INSP - Foundation | 7/8/1999 | 7/8/1999 | 7/8/1999 | P | PART |
Jim Sly
|
|
|
07/08/99 316 - Foot and rebar OK pending special insp tests and appr.
|
INSP - Concrete | 7/1/1999 | 7/2/1999 | 7/2/1999 | A | PART |
Jim Sly
|
|
|
07/02/99 316 - Concrete slab....OK pending special insp tests and appr
|
INSP - Foundation | 6/25/1999 | 6/25/1999 | 6/25/1999 | P | PART |
Jim Sly
|
|
|
06/25/99 316 - Footings OK pending spec insp approval
|
INSP - Foundation | 6/23/1999 | 6/24/1999 | 6/24/1999 | A | PART |
Jim Sly
|
|
|
06/24/99 316 - ###-#### GENE//CALL B4 GOING 2 MEET U 4 CONFERENCE
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/18/1999 | | PASS |
|
|
|
|
Issue PAID IN FULL permit | | | 6/18/1999 | | |
|
|
|
|
Plan resubmittals received | | | 6/17/1999 | | PASS |
|
|
|
RECEIVED MECH. ELEC. AND PLUMB. FOR MODIFICATIION. SOME WERE NOT STAMPED OR SIGNED ENG. WILL BE IN TO SIGN PLANS. I WILL THEN GIVE TO JOHN TO INSERT. KMM DAVE LAMAR OF LEE ELEC. CAME IN AND STAMPED AND SIGNED ELEC. PLANS. ROUTED EVERYTHING TO JOHN M. KMM
|
CHANGE STATUS TO (P) | | | 6/17/1999 | | |
|
|
|
received plm mec, ele plans
|
Inspection Record Card- Bld | | | 6/16/1999 | | |
|
|
|
|
Print Occupancy Form | | | 6/16/1999 | | |
|
|
|
|
Routing - PLAN CHECK | 6/14/1999 | | 6/16/1999 | | PASS |
|
|
|
routed plans to John M. mps
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/16/1999 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 6/15/1999 | | 6/16/1999 | | PASS |
|
|
|
FAXED CONSULTING ENGINEER RESPONSE LETTER FROM ENGINEER OF RECORD FOR THE LAST COMMENT LIST. TALK WITH CONSULTING ENGINEER AND HE GAVE ME A VERBAL APPROVAL ON THE LAST STRUCTURAL ITEM. THE WRITTEN RESPONSE TO FOLLOW.
|
Plan resubmittals received | | | 6/15/1999 | | PASS |
|
|
|
Resubmittal received from Wes steele habitec, ase consulting engineering , inc. city plan review item #11: forward to John M.-mps
|
Routing - PLUMBING | 6/10/1999 | | 6/14/1999 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 6/11/1999 | | PEND |
|
|
|
FAXED GORDON MCDONALD A COPY OF THE COMMMENT LIST FROM THE CONSULTING ENGINEER REQUESTING REVISIONS.
|
Routing Off Site - STRUCTURAL | 6/3/1999 | | 6/11/1999 | | FAIL |
|
|
|
SENDING REVISED STRUCTURAL PLANS TO CONSULTANT. DAR 6/3/99
|
Routing - PLAN CHECK | 5/25/1999 | | 6/10/1999 | | PEND |
|
|
|
|
Plan resubmittals received | | | 6/2/1999 | | PEND |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM GORDON McDONALD, FORWARDED SAME TO JOHN MENARD. DAR 6/3/99
|
Routing - PLANNING | 5/24/1999 | | 5/25/1999 | | PASS |
|
|
|
x-ref. DRH99-0100
|
Routing - PLAN CHECK | 5/20/1999 | | 5/24/1999 | | PEND |
|
|
|
|
Routing - FIRE | 5/19/1999 | | 5/19/1999 | | PASS |
|
|
|
PLAN MODIFICATION. KMM 5-19-99 ROUTED TO BILL A. IF HE CANNOT DO HE WILL LET ME KNOW AND WE WILL SEND TO FLOYD. KMM
|
Routing - PLAN CHECK | 5/11/1999 | | 5/19/1999 | | PASS |
|
|
|
PLAN MODIFICATION. KMM
|
Plan Review Completed(1st rev) | | | 5/19/1999 | | |
|
|
|
|
Plan Reviewer's activity | | | 5/19/1999 | | PASS |
|
|
|
PLANS REVISIONS REVIEWED AND APPROVED AS SUBMITTED.
|
Plan resubmittals requested | | | 5/13/1999 | | PEND |
|
|
|
FAXED GORDON MCDONALD A COPY OF THE CONSULTING STRUCTURAL ENGINEER'S COMMENT LIST REQUESTING REVISIONS.
|
Routing Off Site - STRUCTURAL | 5/6/1999 | | 5/12/1999 | | FAIL |
|
|
|
PLAN MODIFICATION. CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
|
Routing - PLUMBING | 5/10/1999 | | 5/10/1999 | | FAIL |
|
|
|
PLAN MODIFICATION. KMM
|
Routing - PLANNING | 5/7/1999 | | 5/10/1999 | | FAIL |
|
|
|
PLAN MODIFICATION. KMM DR modification still needs to be approved. TKW
|
Routing - PUBLIC WORKS | 5/6/1999 | | 5/7/1999 | | PASS |
|
|
|
PLAN MODIFICATION. KMM
|
Plan routing begun/NEW & ADDTN | | | 5/6/1999 | | |
|
|
|
PLAN MODIFICATION.
|
Plan Modification Accepted | | | 5/6/1999 | | PASS |
|
|
|
REVISIONS TO EXTERIOR DESIGN AND STRUCTURAL SYSTEM. MINOR REVISIONS TO BLDG. CORE. ADDITION OF SECOND FLOOR BALCONIES. KMM
|
Print Occupancy Form | | | 12/2/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 12/2/1998 | | |
|
|
|
|
(F) Reprint permit | | | 11/30/1998 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/25/1998 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/23/1998 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 10/23/1998 | | |
|
|
|
|
Telephone call | | | 10/23/1998 | | |
|
|
|
|
Print Occupancy Form | | | 10/23/1998 | | |
|
|
|
|
Routing - PLAN CHECK | 9/29/1998 | | 10/22/1998 | | PASS |
|
|
|
|
Plan assigned to (JCM) | 8/27/1998 | | 10/22/1998 | | PASS |
John Menard
|
|
|
|
Plan resubmittals received | | | 10/22/1998 | | PEND |
|
|
|
|
Plan resubmittals received | | | 9/29/1998 | | PASS |
|
|
|
received foundation plan and roof framing plan,revised attached calcs.,original calcs
|
Routing - FIRE | 9/28/1998 | | 9/28/1998 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 9/28/1998 | | FAIL |
|
|
|
ubc issues
|
Routing - PLAN CHECK | 9/14/1998 | | 9/28/1998 | | |
|
|
|
|
Plan resubmittals requested | | | 9/25/1998 | | PEND |
|
|
|
MAILED GORDON MCDONALD A COPY OF THE COMMENT LIST REQUESTING REVISIONS.
|
Routing - PUBLIC WORKS | 9/23/1998 | | 9/23/1998 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 9/21/1998 | | PEND |
|
|
|
FAXED GORDON MCDONALD A COPY OF THE STUCTURAL COMMENTS FROM THE CONSULTING ENGINEERING FIRM REQUESTING REVISIONS.
|
Routing Off Site - STRUCTURAL | 8/27/1998 | | 9/17/1998 | | PEND |
|
|
|
CONTACTED PDQ TO TAKE PLANS OUT TO ATWOOD HINZMAN AND JONES
|
Plan resubmittals received | | | 9/16/1998 | | |
|
|
|
RECEIVED RESUBS AND TAKEN TO FLOYD V.
|
Routing - PLUMBING | 9/10/1998 | | 9/14/1998 | | PASS |
|
|
|
|
Routing - PLANNING | 9/4/1998 | | 9/10/1998 | | PASS |
|
|
|
x-ref. DR-69-96 (phased project)
|
Routing - PUBLIC WORKS | 8/27/1998 | | 9/4/1998 | | FAIL |
|
|
|
REQUIRES DRAINAGE PLAN REVISION PER BM.
|
Received Certificate of Value | | | 8/27/1998 | | PASS |
|
|
|
|
Plan assigned to (MYS) | 8/26/1998 | | 8/27/1998 | | |
Marlene Southard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/27/1998 | | PEND |
|
|
|
CONTACTE SCOTT RAYMES TO LET HIM KNOW THAT I NEED 2 COPIES OF LANDSCAPE PLANS.
|
Plan routing begun/NEW & ADDTN | | | 8/27/1998 | | |
|
|
|
|
Application received | | | 8/26/1998 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/26/1998 | | |
|
|
|
|