Information based on query as of Monday, July 1, 2024.
Permit Information
Permit NumberBLD98-02763
StatusFinaled
Name PESKY CENTER
Site Address 345 BOBWHITE CT Unit: 2 FLR
Project NameLOGGER CREEK PLAZA
Customer Number 
ePlanReviewNo
Description
(PESKY CENTER) Fire sprinklers used to substitute for 1-hr fire-resistive construction of the building. To remodel a 4,760 square foot office space on the 2nd floor. Work is to include a 1-hr tenant demising wall; 1-hr corridor wall, window, and doors; interior nonbearing walls; and interior millwork all per approved drawings and plan review conditions on file. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. PC-630-98 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 12/4/199812/4/1998 DONE
Details
Permanent occupancy  12/4/1998 PASS
Perm. Occ. Cert. #7523 issued 12-4-98 to the Pesky Learning Center.
INSP-Final Inspection11/24/199811/25/199811/25/1998AFAIL
DetailsRick Jackson
BRIAN ###-#### c/n issued - hold open on door to be removed; add extinguisher; add exit signs; suite sign; repair exit sign
INSP - Framing/Rough-in10/19/199810/19/199810/19/1998 PASS
DetailsJim Storey
/ / 301 - FRAM-OK FRAMING
INSP - Wall cover10/15/199810/16/199810/16/1998PPART
DetailsJim Storey
10/16/98 301 - Scheduled by Hello!. Contact phone is [8673887]. CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
Issue PAID IN FULL permit  10/6/1998
Inspection Record Card- Bld  10/5/1998
Print Occupancy Form  10/5/1998
Telephone call  10/5/1998
CALLED PERMIT READY
Plan assigned to (CJW)9/17/1998 10/2/1998 PASS
DetailsCarl Westfall
10/02/98 11:11:46 CJW - this action updated by action script from <<>> in Case No. BLD98-2763
testing condition printout  10/2/1998
PLANS/APPL TAKEN TO FRONT DESK  10/2/1998 PASS
Print permit w/o conditions  10/2/1998
Plan Reviewer's activity  10/2/1998 PASS
Drawings approved, with conditions, after resubmittal review.
Routing - PLAN CHECK9/24/1998 10/2/1998
Routing - FIRE9/23/1998 9/23/1998 PASS
Routing - PLAN CHECK9/17/1998 9/23/1998
Plan Reviewer's activity  9/22/1998
UBC plan review started September 22, 1998 and finished September 23, 1998. A response from the Architect is required. See the conditions list.
Plan resubmittals received  9/18/1998
Fax from Matt Rhees received.
Plan routing begun/TENANTS  9/17/1998
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
Plan assigned to (MYS)9/9/1998 9/17/1998
DetailsMarlene Southard
Routing - PUBLIC WORKS9/11/1998 9/14/1998 PASS
Application received  9/9/1998
Plans ACCEPTED BY PLAN TECH  9/9/1998
Recd Pcfee & Taken To Pln CK  9/9/1998 PASS