Letter of compliance | | | 2/14/2000 | | DONE |
|
|
|
Letter of Compliance #15232 issued 2-14-00.
|
FIRE-Final Inspection | 9/30/1999 | 10/4/1999 | 10/4/1999 | A | CANC |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 09/30/1999 at 14:54:40. Contact: ###-####.//FIRE PREVIOUSLY OK'D//
|
BLD-Final | 10/4/1999 | 10/4/1999 | 10/4/1999 | A | PASS |
Carl Dependahl
|
|
|
PER CARL PASSED FOR FN -CARD TO OWNER'S REP
|
BLD-Conference | 9/17/1999 | 9/17/1999 | 9/17/1999 | | PART |
|
|
|
KEEP C/N, INSTALL RATED HATCH
|
INSP - Final | 9/9/1999 | 9/10/1999 | 9/10/1999 | P | FAIL |
Carl Dependahl
|
|
|
add rated access hatch, etc.c/n
|
INSP-Final Inspection | 9/9/1999 | 9/9/1999 | 9/9/1999 | P | PASS |
Joe Tawney
|
|
|
ok for certificate of occupancy
|
INSP-Alarm Testing | 8/27/1999 | 8/30/1999 | 8/30/1999 | A | PART |
Joe Tawney
|
|
|
09/01/99 406 - ALARM TEST OK SIGNED TEMP
|
INSP-Conference | 8/17/1999 | 8/17/1999 | 8/17/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - CONF WITH DOYLE ON ALARM SYSTEM
|
INSP - Framing/Rough-in | 5/5/1999 | 5/6/1999 | 5/6/1999 | A | PART |
Carl Dependahl
|
|
|
05/06/99 340 - OK TO DROP TILES AT 1HR GRID].
|
INSP - Framing/Rough-in | 5/4/1999 | 5/5/1999 | 5/5/1999 | A | FAIL |
Russ Owen
|
|
|
05/05/99 407 - 1hour ceiling tile ,light can details no good.not per det
|
INSP - Framing/Rough-in | 4/27/1999 | 4/28/1999 | 4/29/1999 | A | NR |
Carl Dependahl
|
|
|
04/28/99 340 - need data for firestops at 1hr grid
|
INSP - Framing/Rough-in | 4/20/1999 | 4/21/1999 | 4/19/1999 | A | FAIL |
Carl Dependahl
|
|
|
04/21/99 340 - phone is [3454460].; need install tents at grid, ok to co
|
INSP - Framing/Rough-in | 3/30/1999 | 3/30/1999 | 3/30/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - VERBAL C/N , NEED LISTING OR DETAIL FOR LITES, FIRESTOP PENE
|
INSP - Framing/Rough-in | 3/29/1999 | 3/29/1999 | 3/29/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - OK TO DROP TILES AT DINING, NEED DESIGN FOR TENTS AT LITES E
|
INSP-Conference | 3/24/1999 | 3/26/1999 | 3/26/1999 | A | PART |
Carl Dependahl
|
|
|
doyle ###-#### conference only, need 1hr grid.
|
INSP-Conference | 3/24/1999 | 3/26/1999 | 3/26/1999 | A | PART |
Joe Tawney
|
|
|
03/26/99 406 - CONFR ON S/F DAMPERS AND DETECTION
|
INSP-Conference | 3/26/1999 | 3/26/1999 | 3/26/1999 | | PASS |
Carl Dependahl
|
|
|
03/26/99 340 - doyle ###-#### conference only met arch onsite, discussed fire/smoke dampers, 1hr grid, need listing fo
|
INSP - Framing/Rough-in | 3/24/1999 | 3/24/1999 | 3/24/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - NO INSP, CONF ONLY; NEED TO SET UP APPT RE DAMPERS
|
Issue PAID IN FULL permit | | | 12/16/1998 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/16/1998 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/16/1998 | | |
|
|
|
|
Plan assigned to (DRS) | 9/17/1998 | | 11/24/1998 | | PASS |
Dan Stuart
|
|
|
11/24/98 12:56:27 DRS - this action updated by action script from <<>> in Case No. BLD98-2788
|
Print Occupancy Form | | | 11/24/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 11/24/1998 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/24/1998 | | PASS |
|
|
|
TO FRON DESK TO PROCESS FOR ISSUANCE OF PERMIT.
|
Routing - PLAN CHECK | 11/23/1998 | | 11/24/1998 | | PASS |
|
|
|
PROCESSING FOR ISSUANCE OF PERMIT.
|
Routing - FIRE | 11/19/1998 | | 11/23/1998 | | PASS |
|
|
|
type of damper in central core still not clear.....may need additional smoke detectors
|
Routing - PLAN CHECK | 10/26/1998 | | 11/18/1998 | | PEND |
|
|
|
Inserted resubmittals & assembled copies of U.L. & Evaluation reports referenced by architect. Plans recirculated to Fire Dept for review.
|
Plan resubmittals received | | | 11/16/1998 | | |
|
|
|
RECEIVED THREE REVISED COPIES OF SHEETS T, 1,2,3,4,5, ROUTED TO DAN S. KMM
|
Plan Review Completed(1st rev) | | | 10/24/1998 | | FAIL |
|
|
|
ubc and ufc
|
Routing - FIRE | 10/23/1998 | | 10/23/1998 | | FAIL |
|
|
|
smoke dampers not right
|
Telephone call | | | 10/22/1998 | | PEND |
|
|
|
Call to Pat McKeegan, architect of record to discuss concerns about the designs for the constructed assemblies proposed to be built for protection of the duct penetrations at the new proposed ceiling. Pat is working on new details as we speak and says that his mechanical personell were having problems finding approved smoke/fire dampers. I asked Pat to stop by and review the details with me today when he came in for a 3 p.m. meeting.
|
Meeting | | | 10/22/1998 | | |
|
|
|
Reviewed a listed Smoke/Fire Damper assemly listed by Ruskin Mfg. I gave him a copy of the information I got off of the internet. If it checks out for him he will present the new design shortly so the permit can be processed.
|
Plan resubmittals requested | | | 10/22/1998 | | |
|
|
|
Requested clarification from architect concerning the protective system to be used at the duct penetrations within the new 1-hour rated corridor system, when we met at 4:00 p.m. this afternoon.
|
Routing - PLAN CHECK | 10/21/1998 | | 10/22/1998 | | PEND |
|
|
|
Met with architect to discuss concerns and ask for clarification. Gave him source to research for smoke/fire dampers for suspended ceiling installation. Forwarding paln to Fire Dept. for review.
|
Print Pending Permit.LaserJet4 | | | 10/22/1998 | | PEND |
|
|
|
|
Routing - PLAN CHECK | 9/17/1998 | | 10/21/1998 | | PEND |
|
|
|
Picked up plans to begin review.
|
Plan routing begun/TENANTS | | | 9/17/1998 | | |
|
|
|
Route to PLAN CHECK and FIRE.
|
Plan assigned to (MYS) | 9/10/1998 | | 9/17/1998 | | |
Marlene Southard
|
|
|
|
Routing - PUBLIC WORKS | 9/11/1998 | | 9/14/1998 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/11/1998 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/10/1998 | | |
|
|
|
|
Application received | | | 9/10/1998 | | |
|
|
|
|