DOC - Permit Finaled | 1/29/2001 | 1/29/2001 | 1/29/2001 | P | PASS |
Jim Sly
|
|
|
Added by Inspector: 316 On 1/29/2001 4:38:11 PM
|
DOC - Permit Finaled | 1/29/2001 | 1/29/2001 | 1/29/2001 | P | PASS |
Jim Sly
|
|
|
Added by Inspector: 316 On 1/29/2001 4:38:11 PM
|
DOC - Permit Finaled | 1/29/2001 | 1/29/2001 | 1/29/2001 | P | PASS |
Jim Sly
|
|
|
Added by Inspector: 316 On 1/29/2001 4:38:11 PM
|
INSP - Final | 5/17/1999 | 5/17/1999 | 5/17/1999 | P | PASS |
Jim Sly
|
|
|
05/17/99 316 - C/C # 16158
|
INSP - Framing/Rough-in | 1/13/1999 | 1/13/1999 | 1/13/1999 | | PASS |
Jim Sly
|
|
|
/ / 316 -
|
INSP - Energy code compliance | 1/12/1999 | 1/13/1999 | 1/13/1999 | P | PASS |
Jim Sly
|
|
|
01/13/99 316 -
|
INSP - Framing/Rough-in | 1/11/1999 | 1/12/1999 | 1/12/1999 | A | FAIL |
Jim Sly
|
|
|
01/12/99 316 - C/N...Need plans and truss Eng.
|
INSP - Framing/Rough-in | 12/27/1998 | 12/29/1998 | 12/29/1998 | A | PART |
Jim Sly
|
|
|
12/29/98 316 - Shear wall OK
|
INSP - Foundation | 11/4/1998 | 11/5/1998 | 11/5/1998 | A | FAIL |
Jim Sly
|
|
|
11/05/98 316 - Foot width, height, soil OK...Setbks?...No appr plans on
|
INSP - Framing/Rough-in | 11/2/1998 | 11/2/1998 | 11/2/1998 | P | NR |
Tom Arcoraci
|
|
|
11/02/98 408 - Scheduled by Hello!. NO HOUSE ON THIS ADDRESS
|
(F) Reprint permit | | | 10/26/1998 | | |
|
|
|
|
Routing - PLANNING | 10/22/1998 | | 10/22/1998 | | PASS |
|
|
|
different lot and block. 3/15 bristol heights no 12. gave plans to linda as she is working on this permit.pe refer to bld98-2818
|
CHANGE STATUS TO (F) | | | 10/22/1998 | | PEND |
|
|
|
42.00 per linda h
|
Routing - PUBLIC WORKS | 10/22/1998 | | 10/22/1998 | | PASS |
|
|
|
submitted different lot and block 3/15 bristol heights#12 refer to permit number swr98-1631 paid for
|
Inspection Record Card- Bld | | | 10/22/1998 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/29/1998 | | |
|
|
|
|
Telephone call | | | 9/23/1998 | | |
|
|
|
phoned permit ready
|
Inspection Record Card- Bld | | | 9/23/1998 | | |
|
|
|
|
Plan assigned to (MLO) | 9/18/1998 | | 9/22/1998 | | PASS |
Mike Otto
|
|
|
|
Routing - PLAN CHECK | 9/16/1998 | | 9/22/1998 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/22/1998 | | PASS |
|
|
|
|
Plan assigned to (DJO) | 9/14/1998 | | 9/18/1998 | | PEND |
Dan Overy
|
|
|
|
Routing - PLANNING | 9/15/1998 | | 9/15/1998 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 9/14/1998 | | 9/15/1998 | | PASS |
|
|
|
|
Application received | | | 9/14/1998 | | |
|
|
|
|