Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD98-02874
StatusFinaled
Name DAIRY QUEEN
Site Address 550 E BOISE AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
DAIRY QUEEN * TO CONSTRUCT A ONE STORY 2,316 SQ. FT. RESTAURANT. Construction is wood frame. NOTE: A 20 wide no build easment has been recorded east side of this building on the neighboring property. The City must approve any changes in this easment. The easment line will be concidered as the property line for the purpose of building code location on property requirements for both parcels of land. CU98-113 CU97-56 ads
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes11/4/1998 8/19/1999
Fee Review-notes2/16/1999 8/19/1999 DONE
INSP - Final7/7/19997/8/19997/8/1999PPASS
DetailsJim Storey
07/08/99 301 - CHRIS - ###-#### FINAL
Permanent occupancy  7/8/1999 PASS
Perm. Occ. Cert. #7833 issued 7-8-99 to the Dairy Queen.
INSP - Final7/6/19997/7/19997/7/1999PCANC
DetailsJim Storey
07/07/99 301 - CHRIS - ###-#### REINSPECT
INSP - Final4/9/19994/9/19994/9/1999PPART
DetailsJim Storey
04/09/99 301 - c/n ,cdhd
Temporary occupancy  4/9/1999 PASS
Temp. Occ. Cert. #3824 issued 4-9-99 to the Dairy Queen.
INSP-Final Inspection4/6/19994/7/19994/7/1999APASS
DetailsRick Jackson
###-#### CHRIS//FIRE & LIFE SAFETY occ approved
INSP-Final Inspection4/6/19994/6/19994/6/1999APART
DetailsRick Jackson
temp occ approved - assembly permit required
INSP-Final Inspection3/24/19993/26/19993/26/1999AFAIL
DetailsRick Jackson
extinguishers; balance report; space for deep fat frier;
Code Occupancy Approval  3/24/1999
Final Occupancy requested by Chris Leonard @ ###-####
Code Occupancy Approval  3/24/1999 PASS
ALL CONDITIONS OF CONDITIONAL USE AND DESIGN REVIEW COMPLIED WITH, FINAL OCCUPANCY SIGNED OFF.
INSP - Framing/Rough-in3/19/19993/19/19993/22/1999PPASS
DetailsJim Storey
03/19/99 301 - shaft wrap ok
INSP - Framing/Rough-in3/18/19993/18/19993/18/1999PPART
DetailsJim Storey
03/18/99 301 - ###-#### CHRIS//RI KIT EXHAUST FAN ner report must be sub
INSP - Foundation2/23/19992/24/19992/24/1999PPASS
DetailsJim Storey
02/24/99 301 - TRASH ENCLOSER OK
INSP - Framing/Rough-in2/22/19992/23/19992/24/1999APART
DetailsJim Storey
02/24/99 301 - SHEER WALLS OK
INSP - Foundation2/22/19992/23/19992/24/1999APASS
DetailsJim Storey
02/24/99 301 - FDN -OK FOUNDATION TRASH ENCLOSER.
INSP - Framing/Rough-in1/28/19991/28/19991/29/1999PPART
DetailsJim Storey
01/28/99 301 - roof ok
INSP - Foundation12/28/199812/29/199812/30/1998APASS
DetailsJim Storey
12/30/98 301 - FDN -OK FOUNDATION interior ok
INSP - Framing/Rough-in12/21/199812/22/199812/22/1998APART
DetailsJim Storey
12/22/98 301 - pending engineering for pad footing rebar not located for
INSP - Foundation12/17/199812/18/199812/18/1998PPASS
DetailsRuss Owen
12/18/98 407 - CHRIS ###-####
(F) Reprint permit  12/7/1998
Issue PAID IN FULL permit  12/4/1998
Plan assigned to (ADS)9/22/1998 11/18/1998 PASS
Details
11/18/98 10:45:43 ADS - this action updated by action script from <<>> in Case No. BLD98-2874
Plan resubmittals received  11/18/1998 PASS
Recieved copy of no build easement
PLANS/APPL TAKEN TO FRONT DESK  11/18/1998 PASS
Inspection Record Card- Bld  11/18/1998
Print Occupancy Form  11/18/1998
Routing - PLAN CHECK10/26/1998 11/18/1998 PASS
Plan Review Completed(1st rev)  10/24/1998 PASS
all ok pending execution of no-build
Routing - FIRE10/21/1998 10/23/1998 PASS
Gave up on Architect. Approved with condition that the fire sprinklers shown on the permit application may not be installed until the location of the fire sprinkler service connections is provided on revised site plans. waited 2 days for architect to find out if the building will be fre sprinkled
Plan resubmittals requested  10/21/1998 FAIL
letter mailed & faxed to J. Seel @ WHMoore. No build easement & record of survey showing it needs to be recorded.
Routing - PLAN CHECK10/16/1998 10/19/1998 FAIL
location on property problem.
Telephone call  10/19/1998 FAIL
Phone Mike Capshaw at BRS. Informed him that the property line that runs down the front of the building will need to be moved to provide at least 20 feet of setback.
Routing - PLUMBING10/15/1998 10/16/1998 PASS
Routing - PLANNING10/13/1998 10/15/1998 PASS
x-ref cup98-113/cup97-156(original). Approval was delayed pending receipt of a revised site plan to meet conditions of approval. - M.Hall.
Routing - PUBLIC WORKS10/7/1998 10/12/1998 PASS
Routing - PUBLIC WORKS10/7/1998 10/12/1998 PASS
Routing - PUBLIC WORKS10/7/1998 10/12/1998 PASS
Routing Off Site - C.D.H9/22/1998 10/7/1998 PASS
Routing Off Site - STRUCTURAL9/22/1998 9/22/1998
GAVE PLANS TO JOHN TO EVALUATE FOR OUTSIDE ENG.
Plan assigned to (MYS)9/18/1998 9/22/1998
DetailsMarlene Southard
Plans ACCEPTED BY PLAN TECH  9/22/1998 PASS
Plan routing begun/NEW & ADDTN  9/22/1998 PASS
Recd Pcfee & Taken To Pln CK  9/18/1998
Received Certificate of Value  9/18/1998 PASS
Application received  9/18/1998
Case Summary (BLD)