INSP - Final | 5/6/1999 | 5/7/1999 | 5/7/1999 | A | FAIL |
Russ Owen
|
|
|
05/07/99 407 - Gray ###-####
|
INSP - Framing/Rough-in | 2/4/1999 | 2/4/1999 | 2/4/1999 | P | PASS |
Jim Sly
|
|
|
02/04/99 316 -
|
INSP - Framing/Rough-in | 2/3/1999 | 2/3/1999 | 2/3/1999 | P | FAIL |
Jim Sly
|
|
|
02/03/99 316 - C/N....Need blocks and nailing of hangers at gar girder/j
|
INSP - Framing/Rough-in | 1/25/1999 | 1/25/1999 | 1/25/1999 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - shear? insp per GS. c/n trusses, insul? etc do not insulate
|
INSP - Framing/Rough-in | 1/22/1999 | 1/25/1999 | 1/25/1999 | A | FAIL |
Wes Worcester
|
|
|
01/25/99 342 - Scheduled by Hello!. Contact phone is [3879711]. no plan
|
INSP - Wall cover | 1/15/1999 | 1/15/1999 | 1/15/1999 | | PASS |
Tom Arcoraci
|
|
|
/ / 408 - ok to side over shear walls
|
INSP - Wall cover | 1/14/1999 | 1/15/1999 | 1/15/1999 | P | FAIL |
Jim Sly
|
|
|
01/15/99 316 - Done by Tom A.
|
INSP - Framing/Rough-in | 1/7/1999 | 1/7/1999 | 1/7/1999 | | PART |
Jim Sly
|
|
|
/ / 316 - VERIFIED HD5A'S INSTALLED AT GAR WING WALLS AND NAILING OF X
|
INSP - Framing/Rough-in | 1/6/1999 | 1/7/1999 | 1/7/1999 | A | CANC |
Russ Owen
|
|
|
01/07/99 407 - trans to 316
|
INSP - Framing/Rough-in | 1/7/1999 | 1/7/1999 | 1/7/1999 | | PART |
Jim Sly
|
|
|
/ / 316 - VERIFIED HD5A'S INSTALLED AT GAR WING WALLS AND NAILING OF X
|
INSP - Foundation | 12/14/1998 | 12/15/1998 | 12/15/1998 | A | PART |
Russ Owen
|
|
|
12/15/98 407 - no approved plans at this site,soil,setbacks footings app
|
Issue PAID IN FULL permit | | | 11/24/1998 | | |
|
|
|
|
Plan assigned to (DJO) | 9/18/1998 | | 11/23/1998 | | PASS |
Dan Overy
|
|
|
11/23/98 10:38:40 DJO - this action updated by action script from <<>> in Case No. BLD98-2875
|
Print Pending Permit.LaserJet4 | | | 11/23/1998 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 11/23/1998 | | |
|
|
|
|
Telephone call | | | 11/23/1998 | | |
|
|
|
LEFT MESSAGE ###-####
|
Plan Reviewer's activity | | | 11/23/1998 | | PASS |
|
|
|
WALL BRACE ENGINEERING RECEIVED.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/23/1998 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 11/5/1998 | | PEND |
|
|
|
engineering has not been received.
|
Plan Reviewer's activity | | | 10/27/1998 | | PEND |
|
|
|
resubmitted plans recieved. engineering for lateral bracing at front of house, including 2nd floor required.
|
Plan Reviewer's activity | | | 10/8/1998 | | PEND |
|
|
|
TALKED WITH EDENBROOK. NEW UPDATED PLANS TO BE BROUGHT IN. WILL CHECK FOR BRACING REQUIREMENTS WHEN RECEIVED.
|
Plans ACCEPTED BY PLAN CHECK | | | 10/2/1998 | | PEND |
|
|
|
|
Routing - PLANNING | 9/22/1998 | | 9/22/1998 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 9/18/1998 | | 9/22/1998 | | PASS |
|
|
|
|
Application received | | | 9/18/1998 | | |
|
|
|
|
Routing - PLAN CHECK | 9/22/1998 | | | | |
|
|
|
|