Fee Review-notes | 6/20/2003 | 6/20/2003 | 6/20/2003 | | DONE |
|
|
|
|
Permanent occupancy | | | 9/14/2000 | | DONE |
|
|
|
Perm. Occ. Cert. #8375 issued 9-14-00 to the Capital Care Center.
|
FIRE-Final Inspection | 8/31/2000 | 9/5/2000 | 9/5/2000 | P | PASS |
Joe Tawney
|
|
|
jeff ###-#### as discussed 1:30 pm Reinsp OK for Certificate of completion 9/6/2000 7:49:08 AM
|
BLD-Final | 8/31/2000 | 9/5/2000 | 9/5/2000 | P | PASS |
Tom Arcoraci
|
|
|
jeff ###-#### as per conversation 1:30 pm 9/5/2000 10:50:55 AM ok for perm 9/6/2000 8:07:48 AM
|
Permanent Occupancy | | 9/5/2000 | 9/5/2000 | | DONE |
|
|
|
|
BLD-Final | 8/29/2000 | 8/31/2000 | 8/31/2000 | P | NR |
Carl Dependahl
|
|
|
jefferey ###-#### fn occ; recallwhen ready by 408 8/31/2000 2:58:51 PM
|
FIRE-Final Inspection | 8/29/2000 | 8/31/2000 | 8/31/2000 | P | FAIL |
Joe Tawney
|
|
|
jeffery-- ###-#### fire fn Reinsp Fail AHU shutdown, Cook hood test 8/31/2000 3:37:07 PM
|
FIRE-Final Inspection | 8/10/2000 | 8/17/2000 | 8/17/2000 | P | FAIL |
Joe Tawney
|
|
|
Ken ###-#### Structural will also be going out pm Fail S/F dampers and detectors 8/18/2000 7:45:10 AM
|
FIRE-Final Inspection | 8/15/2000 | 8/16/2000 | 8/16/2000 | A | FAIL |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 08/15/2000 at 13:31:49. Contact: ###-####. fail S/f dampers 8/16/2000 12:30:48 PM
|
BLD-Final | 8/15/2000 | 8/16/2000 | 8/16/2000 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/15/2000 at 13:33:31. Contact: ###-####. conf 8/16/2000 4:34:15 PM
|
BLD-Final | 8/10/2000 | 8/15/2000 | 8/15/2000 | P | PART |
Tom Arcoraci
|
|
|
Ken ###-#### conf 8/15/2000 4:27:07 PM
|
BLD-Framing/Rough-in | 7/17/2000 | 7/17/2000 | 7/17/2000 | P | PART |
Jim Storey
|
|
|
ceiling inspection Ken Ewing ###-#### west service corridor ok for cover tile under 1 sq/ft must bechecked for clips. 7/17/2000 3:31:37 PM
|
FIRE-Conference | 5/9/2000 | 5/10/2000 | 5/10/2000 | P | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 05/09/2000 at 15:18:51. Contact: ###-####. Conf. with contractor on service corridor & lobby area. 5/11/00 11:47:19 AM
|
BLD-Conference | 5/5/2000 | 5/5/2000 | 5/4/2000 | P | PART |
Tom Arcoraci
|
|
|
Cn issued regarding hood/ceiling.
|
BLD-Conference | 4/27/2000 | 5/1/2000 | 5/1/2000 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 04/27/2000 at 14:03:01. Contact: ###-####. Conf. on service wing constr. 2 1/2 hr. insp.
|
BLD-Conference | 5/1/2000 | 5/1/2000 | 5/1/2000 | P | PART |
Joe Tawney
|
|
|
Conf. with contr. regarding last phase of work.
|
BLD-Conference | 4/17/2000 | 4/18/2000 | 4/18/2000 | P | PART |
Tom Arcoraci
|
|
|
|
BLD-Final | 4/17/2000 | 4/17/2000 | 4/17/2000 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 04/17/2000 at 08:25:53. Contact: ###-####. Ok occ. 500 wing 4/18/00 10:41:44 AM
|
FIRE-Final Inspection | 4/13/2000 | 4/14/2000 | 4/14/2000 | P | FAIL |
Joe Tawney
|
|
|
###-#### Reinsp fail smoke/fire damper detectors 4/17/00 9:26:14 AM
|
FIRE-Final Inspection | 4/11/2000 | 4/12/2000 | 4/12/2000 | A | FAIL |
Joe Tawney
|
|
|
###-#### Final fail alarm system faile 4/13/00 8:52:21 AM
|
BLD-Framing/Rough-in | 3/7/2000 | 3/7/2000 | 3/7/2000 | P | PART |
Tom Arcoraci
|
|
|
###-#### Ok to c over WIP on wing 500. 3/8/00 10:37:45 AM
|
BLD-Conference | 3/1/2000 | 3/1/2000 | 3/1/2000 | P | PART |
Tom Arcoraci
|
|
|
Ken; ###-####. 2hr wall conf. 3/2/00 8:51:14 AM
|
BLD-Conference | 2/28/2000 | 2/29/2000 | 2/29/2000 | A | PART |
Tom Arcoraci
|
|
|
fire wall conf\\###-#### 2 hr. wall conf. 2/29/00 3:20:50 PM
|
FIRE-Final Inspection | 2/9/2000 | 2/10/2000 | 2/10/2000 | P | PART |
Joe Tawney
|
|
|
###-#### reinspection ok for temp occ of wing 600
|
BLD-Final | 2/9/2000 | 2/10/2000 | 2/10/2000 | P | PASS |
Jim Sly
|
|
|
###-####wing 600 ok for temp occ
|
FIRE-Final Inspection | 2/8/2000 | 2/9/2000 | 2/9/2000 | P | FAIL |
Joe Tawney
|
|
|
James ###-#### alarm system test c/n issued.
|
BLD-Framing/Rough-in | 1/13/2000 | 1/14/2000 | 1/14/2000 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/13/2000 at 22:40:16. Contact: ###-####. 600 wing 2-hr wall. 1/18/00 9:00:38 AM
|
BLD-Conference | 1/7/2000 | 1/10/2000 | 1/10/2000 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/07/2000 at 13:00:31. Contact: ###-####. V-1-hr const. Conf.
|
BLD-Conference | 1/6/2000 | 1/7/2000 | 1/7/2000 | A | PART |
Tom Arcoraci
|
|
|
conference James ###-####. Finish in pm.
|
BLD-Final | 12/29/1999 | 12/30/1999 | 12/30/1999 | A | PART |
Tom Arcoraci
|
|
|
PARTIAL FINAL FOR WING 800 JAMES ###-#### ok to occ. Wing 800.
|
FIRE-Final Inspection | 12/28/1999 | 12/29/1999 | 12/29/1999 | P | PART |
Joe Tawney
|
|
|
JAMES ###-#### REINSPECTION. Reinsp. ok for temp. occ. of 800 wing.
|
FIRE-Final Inspection | 12/23/1999 | 12/28/1999 | 12/28/1999 | A | PART |
Joe Tawney
|
|
|
###-#### james wing 800. Ok on alarm system move one strobe adj. one damper.
|
BLD-Final | 12/23/1999 | 12/28/1999 | 12/28/1999 | P | FAIL |
Tom Arcoraci
|
|
|
wing 800 james ###-####. Conference.
|
BLD-Framing/Rough-in | 12/3/1999 | 12/6/1999 | 12/6/1999 | A | FAIL |
Tom Arcoraci
|
|
|
WING 800 JAMES ###-#### Not ready.
|
BLD-Framing/Rough-in | 12/6/1999 | 12/6/1999 | 12/6/1999 | P | PART |
Tom Arcoraci
|
|
|
rescheduled from tom ok to cover part of 2hr wall.
|
FIRE-Conference | 11/24/1999 | 11/29/1999 | 11/29/1999 | A | PART |
Joe Tawney
|
|
|
JAMES ###-#### Conf. Regarding smoke detectors & horn strobes.
|
BLD-Conference | 11/29/1999 | 11/29/1999 | 11/29/1999 | P | FAIL |
Tom Arcoraci
|
|
|
james--- ###-#### conf C/N.
|
Print Occupancy Form | | | 11/23/1999 | | DONE |
|
|
|
|
FIRE-Final Inspection | 11/18/1999 | 11/19/1999 | 11/19/1999 | A | PART |
Joe Tawney
|
|
|
james ###-#### Reinsp. Ok for occ. Of 700 wing.
|
BLD-Final | 11/18/1999 | 11/19/1999 | 11/19/1999 | P | PART |
Tom Arcoraci
|
|
|
james ###-#### Area 700 ok for occ.
|
FIRE-Final Inspection | 11/17/1999 | 11/18/1999 | 11/18/1999 | P | NR |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 11/17/1999 at 22:40:12. Contact: ###-####. not ready
|
BLD-Final | 11/15/1999 | 11/17/1999 | 11/18/1999 | A | FAIL |
Tom Arcoraci
|
|
|
james-- ###-#### fn occ Not ready.
|
FIRE-Final Inspection | 11/15/1999 | 11/16/1999 | 11/17/1999 | A | FAIL |
Joe Tawney
|
|
|
james--- ###-#### fn fire 700 area Roll-up fire not working; alarms tested ok.
|
FIRE-Final Inspection | 11/8/1999 | 11/10/1999 | 11/10/1999 | A | FAIL |
Joe Tawney
|
|
|
wing #700 james ###-#### Corridor/area separation wall penetrations; no alarm???; exit signs; etc.etc.
|
FIRE-Conference | 11/2/1999 | 11/3/1999 | 11/3/1999 | A | PART |
Joe Tawney
|
|
|
james---###-#### conf insp Conf. On alarm system and smoke/ fire dampers.
|
BLD-Framing/Rough-in | 10/28/1999 | 10/29/1999 | 10/29/1999 | P | PART |
Tom Arcoraci
|
|
|
JAMES-- ###-####--OK TO COVER 2 hr wall framing.
|
BLD-Wall cover | 10/26/1999 | 10/27/1999 | 10/27/1999 | A | PART |
Carl Dependahl
|
|
|
James ###-#### 408's job: walked w/supt. Need fire assy. For non listed boxes, etc. 2nd layer lid @ SW corner ok to tile. Consulted Tom
|
BLD-Framing/Rough-in | 10/19/1999 | 10/20/1999 | 10/21/1999 | A | PART |
Tom Arcoraci
|
|
|
cover james ###-#### 2hr wall conference.
|
Inspection Record Card- Bld | | | 10/20/1999 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/20/1999 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/20/1999 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/20/1999 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 10/1/1999 | 10/4/1999 | 10/4/1999 | A | PART |
Tom Arcoraci
|
|
|
james-- ###-#### ok to cover/1 HR-CONFERENCE OK TO COER PART EXT WALLS
|
BLD-Framing/Rough-in | 9/22/1999 | 9/23/1999 | 9/23/1999 | A | PART |
Tom Arcoraci
|
|
|
JAMES-- ###-####-OK TO COVER Ok to cover ext. walls at selecte areas
|
INSP - Conference | 9/15/1999 | 9/16/1999 | 9/16/1999 | A | PASS |
Tom Arcoraci
|
|
|
1 HR CONSTRCTN CONFERENCE
|
INSP - Foundation | 5/21/1999 | 5/24/1999 | 5/24/1999 | P | PART |
Joe Tawney
|
|
|
05/23/99 406 - PRE CONSTRUCTION CONF WITH CONTR
|
INSP - Foundation | 5/21/1999 | 5/24/1999 | 5/24/1999 | P | PART |
Tom Arcoraci
|
|
|
05/24/99 408 - ###-#### ALAN//PRE CONSTRUCTION CONFERENCE @1:00
|
Issue PAID IN FULL permit | | | 5/6/1999 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/27/1999 | | PASS |
|
|
|
Routing to permit desk for permit.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/27/1999 | | PASS |
|
|
|
Routing to permit desk for issuance of permit based on notes attached and review of plans and areas of concern with the architect Steve Benner and Jeff Langdon, CSDI Construction.
|
Inspection Record Card- Bld | | | 4/27/1999 | | |
|
|
|
|
Telephone call | | | 4/27/1999 | | |
|
|
|
TALKED TO LILIANE GAVE DOLLAR AMOUNT
|
Print Occupancy Form | | | 4/27/1999 | | |
|
|
|
|
Plan assigned to (DRS) | 9/24/1998 | | 4/26/1999 | | PASS |
Dan Stuart
|
|
|
04/26/99 19:56:16 DRS - this action updated by action script from <<>> in Case No. BLD98-2894
|
Routing - PLAN CHECK | 4/23/1999 | | 4/26/1999 | | PASS |
|
|
|
Assembled new submittals. Added notes and attachments. Processing to issue permit.
|
Print Pending Permit.LaserJet4 | | | 4/26/1999 | | PASS |
|
|
|
Processing for permit.
|
Print Pending Permit.LaserJet4 | | | 4/26/1999 | | PASS |
|
|
|
processing for permit.
|
Routing - FIRE | 4/23/1999 | | 4/23/1999 | | PASS |
|
|
|
|
Plan resubmittals received | | | 4/23/1999 | | |
|
|
|
Received second set of plan resubmittals to allow processing of plans for issuance of permit.
|
Routing - PLAN CHECK | 4/12/1999 | | 4/22/1999 | | |
|
|
|
Received new submittals from architect. Routed plans to Floyd for review.
|
Telephone call | | | 4/22/1999 | | |
|
|
|
Called Steve Benner to let him know a second set of plans are needed to allow u to process for a permit. A copy for our files and a copy for the job site. This is standard operating procedure.
|
Plan resubmittals received | | | 4/22/1999 | | PEND |
|
|
|
PLAN RESUBMITTALS RECEIVED FROM STEVE BENNER CSHQA ARCHITECTS, FORWADED SAME TO FLOYD VARLEY/DAN STUART. DAR 04/23/99
|
Received Certificate of Value | | | 4/22/1999 | | |
|
|
|
Received updated certificate of value for scope of work with individual contractors bids sepaerated out. Cost estimates changed from $400,000.00 to $902,711.00 for the project.
|
Plan Review Completed(1st rev) | | | 4/9/1999 | | FAIL |
|
|
|
ubc umc ufc issues
|
Routing - FIRE | 4/8/1999 | | 4/9/1999 | | FAIL |
|
|
|
med gas and mech issues
|
Plan resubmittals received | | | 3/19/1999 | | PEND |
|
|
|
RESUBMITTALS RECEIVED FROM STEVE BENNER, CSHQA, FORWARDED SAME TO DAN STUART. DAR 3/22/99
|
INSP - Final | 2/4/1999 | 2/4/1999 | 2/4/1999 | P | FAIL |
Carl Dependahl
|
|
|
02/04/99 340 - Issue an Occupancy Violation notice to Integrated Health them to obtain a CO...gave c/n to Debbie Flowers, Administrator. 02/10/99 - A response from the new owners & CSHQA architects regarding the posting of an occupancy violation notice to the tenant. A meeting was held this day and it was agreed and the owner directed the architects to proceed post haste to satisfy the requirements of the building & fire code concerning the occupancy violation for this I1.1 use originally approved as an R-1 elderly housing apartment complex. We agreed on a day of response from the architect or the action of the occupancy violation process would be continued. The architect met the original time although a couple of more submittals were required to get us to the point we are at today. I have met with the architect, Steve Benner & the contractor, CSDI, Jeff Langdon to review te notes made on the plans that would need close attention in the field. I will review the plans with Tom Arcoraci, Structural Inspector to get him up to agrred upon concepts. This occupancy violation is fothwith voided. 4/26/99 - {Processing to issuae permit.
|
SUPER- Supervisor's review | 2/4/1999 | 2/4/1999 | 2/4/1999 | | PEND |
|
|
|
Instructed 340 to issue occupancy violation notice to this address per Dan S. request.
|
Plan Reviewer's activity | | | 2/3/1999 | | |
|
|
|
Sent letter to IHS Regional V.P., Robert T.Nelson, that the project has not been satisfactorily resolved regarding the occupancy violation and failure of architect to provide plans that indicate the required corrections to bring the facility into compliance for V-1 hour construction throughout; two hour area separation walls; alarms; sprinklers; smoke / fire dampers; door width requirments; door hardware; and accessibility requirements. Notice will be served to facility as soon as filled out. Copy of letter to Tim Hogland, Fire Dept. reps, George Slane & Marlene Southard. Sent letter to architects Steve Benner & Al Quintieri, CSHQA, notifying them the plans were still incomplete after resubmittal and that the questions remaining to be resolved had been the same since the beginning of the upgrade process over two years ago as reviewed by myself and previously Dick Pierce. Since the opportunity to resovle the issue has appearently failed we will no longer review the plans but park them behind my desk and serve notice on the tenant of illeagal occupancy as directed under Boise City Building Code and approach the matter from a legal stand point. The letter documented all the times we had met to discuss the requirements & proposals and each plan review and failure to respond resulting in the permit application to be cancelled after 180 days and then resubmitting again after several months have past with the same plans and same responses to why what is required shouldn"t be done. Reviewed with Tim Hogland & marlene Southard to make aware of action I was going to take.
|
Telephone call | | | 2/3/1999 | | |
|
|
|
Call from Todd Russell in behalf of IHS. Told me a new group was in the process of purchasing the facility and they had met yesterday with the contractor to review some pricing. Work was to include the removal of the exterior rock and installing a one-hour exterior wall assembly, this is contrary to every response I received from CSHQA stating they were not going to remove the rock. I explained to Mr. Russell that there were several other items that were in question and had not been addressed as well as several review comments to the architects that were responded to by "no comment" or I received comparisons with other codes or rules from different agencies that had nothing to do with the UBC & UFC for requirements and did not meet code requirements, I reviewed with him the occupancy violation problems and what the architects needed to do. Mr. Russell stated he would contact Mr. Quintieri and they would get back with me. This statement has been made a previous meetings, and not resolved successfully, so I will not postpone serving the notice of occupancy violation which gives 30 days to the occupant to comply or move out of the facility. This gives time for the correct plan proposals to be resubmitted.
|
Routing - PLAN CHECK | 11/17/1998 | | 1/15/1999 | | PARK |
|
|
|
From 11/98 to 1/99 plans have sat behind my desk waiting for architects response. 1/15/99 - Received response from architect to plan review corrections. The submittals did not fully address the plan review or did not address them at all ot gave the architects opinion as to why code requirements shold not be invoked. I had been throughthids several time over the last three years and get the same basic response to the ame questions. Plans are still parked behind my desk with written notice to the architect that the review process based on submittals provide over the past several years, dates documented in letter, will not be pursued by another plan review. I wrote noted on the architects response pages as to what the major deficiencies are and faxed this to the architect along with the letter to let them no we will pusue the legal avenues described in buildng code for occupancy violations and notifying the tenant that he has 30 days to comply, appeal, convert back to original approved occupancy use, "R-1"/ "A-3" or vacate.
|
Plan resubmittals received | | | 1/15/1999 | | PEND |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM CSHQA FOR DAN STUART, FORWARDED SAME TO HIM. DAR 1/15/99
|
Plan resubmittals requested | | | 11/17/1998 | | HOLD |
|
|
|
Faxed and mailed copy of preliminary plan review to architects for response & re-submittal requirements. Not forwarding to Fire Dept. until response received. Notifying Marlene Southard, supervisor, that plans on hold and a reaction to the review may be forth coming due to code requirements for the type of occupancy conversion that has taken place and the requirments for the new occupancy use.
|
Meeting | | | 11/17/1998 | | |
|
|
|
Reported to Marlene Southard that the plans are on HOLD until a response is generated from the architect to satisfy code requirements for full compliance or submittal of an equivalent alternate approved by the Building Official.
|
Routing - PLAN CHECK | 11/5/1998 | | 11/16/1998 | | PARK |
|
|
|
Finished preliminary review. Requires resubmittals. Plans on hold until received - not forwarding to Fire Dept. Plans do not address many items that are required because of the change in occupancy use from a R-1, Elderly Housing Apartment Complex to a I-1.1, Nursing Home for Non-Ambulatory patients. Copy of review sent to Architects, Steve Benner & Alan Quintieri of CSHQA. This is the second time plans have been presented for correction of the illegal conversion. Plans were submitted in March 1997, with the same type of concerns raised for correction and the application was cancelled in Nov. 1997 without apparent response to plan review comments.
|
Meeting | | | 11/10/1998 | | |
|
|
|
Reviewed past history of project with Floyd Varley of Fire Dept. plan review to show what was presented by the architect for the Area Separation walls and the penetrating structural elements. Floyd shared the opinion that the Area Separation walls need to be in strict compliance with code to allow the ongoing use of the facility as an I-1.1 Nursing Home from the original approved Elderly Housing Complex.
|
Telephone call | | | 11/7/1998 | | |
|
|
|
Received call from Steve Benner, CSHQA, concerning progress of plan review. I informed him I was just starting the review but it appears that many of the same questions as past review by Fire & Building Depts. have not been clearly answered on the submitted plans.
|
Routing - PLAN CHECK | 9/28/1998 | | 11/5/1998 | | |
|
|
|
Started review of plans.
|
Routing - PUBLIC WORKS | 9/25/1998 | | 9/28/1998 | | PASS |
|
|
|
|
Routing - PLANNING | 9/24/1998 | | 9/25/1998 | | PASS |
|
|
|
|
Plan assigned to (MYS) | 9/21/1998 | | 9/24/1998 | | |
Marlene Southard
|
|
|
|
Plan routing begun/TENANTS | | | 9/24/1998 | | |
|
|
|
Route to PUBLIC WORKS, PLANNING, PLAN CHECK and FIRE.
|
Received Certificate of Value | | | 9/22/1998 | | FAIL |
|
|
|
CONTACTED MR. QUINTIERI AT ###-#### REQUESTING ELEC. AND MECH. VALUES.
|
Application received | | | 9/21/1998 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/21/1998 | | |
|
|
|
|
(F) Reprint permit | | | | | |
|
|
|
|