Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD98-02970
StatusExpired
Name ST LUKES
Site Address 190 E BANNOCK ST
Project NameST LUKES-1ST FLR
Customer NumberSTL980232
ePlanReviewNo
Description
To upgrade a portion of the existing 1-hr. rated corridor to 2 hr. construction to serve as the extension of the stair enclosure to an exterior exit. Location on the 1st floor as noted on the approved set of plans. Work to include removing penetrating items from walls, repairing, infilling or constructing two hour walls assemblies; removing ductwork from 2-hour corridor enclosure portion; smoke/fire dampers at 1-hour corridor portion & floor penetration; installation of 2-hour floor/ceiling assembly, Design No. J201; & install complying door assemblies. All per approved plans, to include notes & attachments thereto. NOTE: This building is fully fire sprinklered. (P.C.#677-98)/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Receive PAYMENT IN FULL  6/5/2000 DONE
Fee Review-notes2/24/1999 1/25/2000 DONE
additional value from subs 33,731 lh
(F) Reprint permit  1/25/2000 DONE
BLD-Final10/27/199910/27/199910/27/1999APASS
Details
Ok for L/C Occ. Req. card signed
BLD-Final9/21/19999/22/19999/22/1999PPART
Details
Scheduled by a contractor via Hello! on 09/21/1999 at 14:49:08. Contact: ###-####. made ok
FIRE-Final Inspection9/20/19999/21/19999/21/1999APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 09/20/1999 at 11:22:00. Contact: ###-####. Occupancy approved
FIRE-Final Inspection9/15/19999/16/19999/16/1999AFAIL
DetailsJoe Tawney
REINSP FAIL - DAMPER INSTALLED OK, NEED TO PATCH RATED WALL NEXT TO DAMPER
INSP-Final Inspection7/7/19997/8/19997/8/1999AFAIL
DetailsRick Jackson
Mike, ###-#### damper not installed properly; 1 hr wall not complete
CHANGE STATUS TO (I)  4/30/1999
INSP - Wall cover3/31/19994/1/19994/5/1999APART
Details
04/01/99 338 - madeok for cover with other trades signoffs
Receive PAYMENT IN FULL  3/4/1999
INSP - Wall cover2/16/19992/16/19992/16/1999 PART
Details
02/11/99 338 - covf and update on this phased permit total door at the 2
Inspection Record Card- Bld  1/15/1999
Telephone call  1/15/1999 PASS
MIKE ###-####
Issue & PRINT FEE-DUE permit  1/15/1999
Print Occupancy Form  1/15/1999
Plan assigned to (DRS)9/29/1998 1/14/1999 PASS
DetailsDan Stuart
01/14/99 17:50:03 DRS - this action updated by action script from <<>> in Case No. BLD98-2970
Routing - PLAN CHECK11/6/1998 1/14/1999 PASS
RECEIVED NEW SUBMITTALS FROM ART ALBANESE & GREGG OSTROW TO CLARIFY PLAN REVIEW COMMENTS. PROCESSING FOR ISSUANCE OF PERMIT.
PLANS/APPL TAKEN TO FRONT DESK  1/14/1999 PASS
PROCESSING FOR PERMIT.
Plan resubmittals received  1/13/1999
REVIEWE SUBMITTALS & INSERTED INTO PLAN WITH ADDITIONAL COMMENTS, PROCESSING FOR PERMIT ISSUANCE.
Routing - FIRE10/30/1998 11/5/1998 PASS
Plan Review Completed(1st rev)  11/5/1998 FAIL
ubc issues
Print Pending Permit.LaserJet4  10/29/1998 PEND
Meeting  10/29/1998
Floyd Varley, Art Albanese, mechanical & electrical reps and Bill Morgan of SLRMC met w/ Dan Stuart at job site to review existing conditions and to determine what could be done at the site to bring the 1-hour corridor into compliance with 2-hour stair enclosure extension requirements. All ductwork can be removed from 2-hour const. area and some equipment now penetrating walls can be removed. Most of the water and gas piping systems will remian in the project area above a rated 2-hour suspended ceiling system, J201, 1998 UL FR Dir. Cost would be excessive to remove all items not serving the enclosure to other areas. This was accepted by all present. The new 2-hour ceiling portion will be installed per listing and only fixture's allowed and protected as described in the assembly will be penetrating the membrane. Plans were prepared based on this review.
Plan resubmittals requested  10/29/1998
FAXED copy & mailed copy to architect.
Routing - PLAN CHECK10/23/1998 10/29/1998 PEND
Preliminary review completed. Response from architect required. Routing to Fire Dept. for review.
Routing - PLAN CHECK9/29/1998 10/23/1998 PEND
Picked up plans to begin review.
Plan resubmittals received  10/12/1998
RECEIVED 2 COPIES OF SHEETS M1.1, M1.2, & M1.3 ROUTED TO DAN S.
Plan routing begun/TENANTS  9/29/1998
Route to PLAN CHECK and FIRE.
Plan assigned to (MYS)9/28/1998 9/29/1998
DetailsMarlene Southard
Application received  9/28/1998
Recd Pcfee & Taken To Pln CK  9/28/1998