Fee Review-notes | 10/27/1998 | | 12/15/1998 | | |
|
|
|
|
INSP - Final | 12/1/1998 | 12/1/1998 | 12/1/1998 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR PERM OCC
|
Permanent Occupancy | | 11/27/1998 | 11/27/1998 | | DONE |
|
|
|
|
Permanent occupancy | | | 11/27/1998 | | PASS |
|
|
|
Perm. Occ. Cert. #7517 issued 11-27-98 to America's Best Furniture Warehouse.
|
INSP-Final Inspection | 11/25/1998 | 11/25/1998 | 11/25/1998 | P | PASS |
Mike Kinnear
|
|
|
RAY ###-#### Two sprinklers were blocked by insulation which the contractor fixed. Owners representative and contractor could not provide the listing of the alarm panel and battery test calculations per NFPA #72 on the same. Contractor signed a certification certificate indicating this was done and he will provide them on the property. Certificate is provided to Joe Tawney (mail box) 11/25/98.
|
INSP - Final | 11/25/1998 | 11/25/1998 | 11/25/1998 | P | PART |
Tom Arcoraci
|
|
|
11/25/98 408 - RAY ###-#### ok for perm occ when others are ok
|
INSP-Conference | 11/9/1998 | 11/9/1998 | 11/10/1998 | P | FAIL |
Tom Arcoraci
|
|
|
11/09/98 408 - RAY HRAMA ###-####-WANTS TO MAKE SURE FIRE DAMPERS ARE OK FIRE FINAL ALSO. still needs dampers in far west side ducts
|
INSP - Final | 11/3/1998 | 11/4/1998 | 11/4/1998 | A | PART |
Tom Arcoraci
|
|
|
11/04/98 408 - RAY ###-#### ok for temp needs dampers in ducts has 2 weeks to install
|
INSP-Final Inspection | 11/3/1998 | 11/3/1998 | 11/4/1998 | P | PART |
Tom Arcoraci
|
|
|
11/03/98 408 - RAY ###-#### REINSPECT ok for temp occ cr notice issued no fire dampers ins some ducts has 2 we install per bob a.
|
INSP - Final | 11/3/1998 | 11/3/1998 | 11/3/1998 | | PART |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR TEMP OCC EXIT LIGHT, TAPED HEADS, LOOSE INSUL
|
INSP-Final Inspection | 10/30/1998 | 10/30/1998 | 10/30/1998 | P | FAIL |
|
|
|
ray - temp occ NOne of the sprinkler issues were complete - changed alarm panel to household panel, informed tenant this was not acceptable
|
INSP - Final | 10/29/1998 | 10/30/1998 | 10/30/1998 | A | FAIL |
Tom Arcoraci
|
|
|
10/30/98 408 - ray- ###-#### fn insp per 325 ducts require dampers
|
INSP-Final Inspection | 10/30/1998 | | 10/30/1998 | | TRAN |
|
|
|
|
INSP-Final Inspection | 10/29/1998 | 10/29/1998 | 10/29/1998 | | FAIL |
Joe Tawney
|
|
|
10/29/98 406 - RAY ###-#### FINAL FAIL SPKLR SYSTEM EXIT & EMERG LIGHTS
|
Print Pending Permit.LaserJet4 | | | 10/1/1998 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 10/1/1998 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 10/1/1998 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/1/1998 | | |
|
|
|
|
Telephone call | | | 10/1/1998 | | |
|
|
|
talked to raymond ###-#### gave dollar amount
|
Plan Reviewer's activity | | | 10/1/1998 | | |
|
|
|
Reviewed application for permit to remove all interior display walls, patch carpet, paint interior, remove suspended ceiling and adjust sprinkler system and ductwork to meet code. Use will be same type of retail furniture sales in front (no racks)with use of high piled storage system in warehouse. Occupancy groups will change to "M" & "S1" due to changes in 1994 UBC which would have been a "B2" occupancy under original bldg. review. I am using the existing approved plans on file for the pupose of issuing a permit as allowed under the guidelines of the 24 hour permit process implemented by Bob Garrison, Plan Check Div. Supervisor at time of implementation, & approved by Tim Hogland, Director.
|
Plan assigned to (DRS) | 9/29/1998 | | 10/1/1998 | | PASS |
Dan Stuart
|
|
|
|
Routing - PLAN CHECK | 9/30/1998 | | 10/1/1998 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/1/1998 | | PASS |
|
|
|
|
Print Occupancy Form | | | 10/1/1998 | | |
|
|
|
|
Application received | | | 9/30/1998 | | |
|
|
|
|
Received Certificate of Value | | | 9/30/1998 | | |
|
|
|
Project cost for remodel placed at $100,000.00
|
Plan Reviewer's activity | | | 9/30/1998 | | |
|
|
|
Copied floor plans & site plan from fiche #970526 to be used with application to issue a building permit for interior remodel of retail sales area & to obtain a new Certificate of Occuapncy for the new tenant -"America's Best Furniture Warehouse".
|
Meeting | | | 9/8/1998 | | |
|
|
|
Met with Mr. Raymond Hroma, contractor, to review proposal to reuse Smith's Home Furnishings building at 8740 Fairview. Gave an application to Mr. Hroma and agreed to look at fiche for the existing builidng to see if it could be used to do the 24 hour permit process.
|