Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD98-03026
StatusExpired
Name GOLD'S GYM
Site Address 8650 W FAIRVIEW AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
TENANT IMPROVEMENT FOR DAYCARE EXPANSION. WORK INCLUDES APPROX. 70 LINEAL FEET OF INTERIOR PARTITIONS OF METAL STUD AND GYP. WITH 900 SQ. FT. OF NEW SUSPENDED CEILING WITH A NEW EQUIP. MEZZANINE WITH NEW GUARDRAIL\CANOPY AND ONE NEW EXTERIOR EXIT DOOR PER APPROVED PLANS AND ATTACHED REQUIREMENTS AND ENGINEERING PC.#688-98. FIRE SPRINKLERS HAVE BEEN USED FOR SUBSTITUION OF ONE-HOUR CONSTRUCTION. : PLAN MODIFICATION APPROVAL 2-17-99 HAS DELETED ALL WORK EXCEPT FOR 70 LINEAL FEET OF NEW WOOD STUD AND GYP. BOARD PARITION WITH TWO 3-0 DOORS, TWO 5-6 WINDOWS AND WOOD TRUSS JOIST AND GYP CEILING PER ATTACHED ENGINEERING FOR THE 435 SQ. FT. SPINNING ROOM AND 316 SQ. FT. STORE ROOMS ONLY. NO OTHER WORK IS ALLOWED UNDER THIS PERMIT. ALL FUTURE WORK WILL REQUIRE NEW PLANS AND PERMITS. NO STORAGE IS PERMITTED ABOVE THE CEILING FOR THE SPINNING ROOM. VENTIALTION PER UBC WILL BE PROVIDED FOR THE SPINNING ROOM FROM THE EXISTING HVAC SYSTEM.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  6/14/2001  
Fee Review-notes1/15/1999 8/24/1999
INSP - Final3/8/19993/8/19993/8/1999 PART
DetailsCarl Dependahl
03/08/99 340 - need htg. struct ok
INSP - Final3/5/19993/8/19993/8/1999PPART
DetailsCarl Dependahl
03/08/99 340 - struct ok, need htg
INSP-Alarm Testing3/5/19993/5/19993/5/1999 PASS
DetailsJoe Tawney
03/05/99 406 - FINAL OK FOR CERT OF COMPLETION
Telephone call  3/2/1999
debbie called gave her til the end of the week.mps
INSP - Framing/Rough-in2/24/19992/24/19992/24/1999 PASS
DetailsJim Sly
/ / 316 -
INSP - Framing/Rough-in2/19/19992/22/19992/24/1999APART
DetailsCarl Dependahl
Brad ###-####. portions of job deleted. new plan onsite, looks ok
INSP - Framing/Rough-in2/19/19992/19/19992/19/1999PCANC
DetailsCarl Dependahl
brad ###-####- 02/19/99 Cancelled by Brad RES
Print Occupancy Form  2/19/1999
Inspection Record Card- Bld  2/19/1999
Plan assigned to (MLO)2/9/1999 2/18/1999 PASS
DetailsMike Otto
PLAN MODIFICATION COMPLETED. MLO
(F) Reprint permit  2/18/1999
Inspection Record Card- Bld  2/18/1999
Print Occupancy Form  2/18/1999
Plan Modification Accepted  2/9/1999 PEND
Plans ACCEPTED BY PLAN TECH  2/9/1999
RECEIVED PLAN MODIFACATION APPLICATION WITH THREE COPIES OF PLANS. ROUTED TO MIKE OTTO. KMM
INSP - Framing/Rough-in2/2/19992/2/19992/2/1999 NR
DetailsCarl Dependahl
/ / 340 - re complaint per Bob A...no workers at site, I'll check back
INSP - Framing/Rough-in2/1/19992/2/19992/2/1999AFAIL
DetailsCarl Dependahl
02/02/99 340 - Received complaint contractor not building per plan. per3 spoke w/ cont by phone, will have plans(and resubmittals soon) onsite as
INSP - Framing/Rough-in2/1/19992/1/19992/1/1999PFAIL
DetailsRuss Owen
NO PERSONS ON SITE OR PLANS, LEFT NOTICE POSTED TO GET PLANS AND CALL FOR INSPECTION.
SUPER- Supervisor's review2/1/19992/1/19992/1/1999 PEND
Received complaint from architect that contractor not building per approved plan sent inspection request to investigate.
Plan resubmittals received  1/28/1999 FAIL
RECEIVED RESUBMITTALS FROM DANIEL H. JOHNSON, BRS ARCHITECTS. DAR 1/27/99. RESUBMITTALS NOT ACCEPTABLE AFTER PERMIT HAS BEEN ISSUED. PLAN MODIFICATION MUST BE SUBMITTED. MLO
Issue PAID IN FULL permit  1/14/1999
Telephone call  11/17/1998
TALKED TO DAN GAVE DOLLAR AMOUNT
Routing - PLAN CHECK11/17/1998 11/17/1998 PASS
PLANS/APPL TAKEN TO FRONT DESK  11/17/1998 PASS
Plan resubmittals received  11/17/1998
RECEIVED TWO COPIES OF REVISED SHEETS P-1, M-1, E-1. ONE COPY OF PLAN CHECK RESPONSE LETTER AND ONE COPY OF SUPPLEMENTAL STRUCTURAL CALCS. ROUTED TO MIKE O. KMM
Inspection Record Card- Bld  11/17/1998
Print Occupancy Form  11/17/1998
Plan assigned to (MLO)10/7/1998 11/17/1998 PASS
DetailsMike Otto
Routing - FIRE10/26/1998 10/28/1998 PASS
Plan Review Completed(1st rev)  10/28/1998 FAIL
UBC issues
Routing - PLAN CHECK10/9/1998 10/26/1998 FAIL
PLAN RECEIVED FOR REVIEW BY MLO 10-23-98.
Plan resubmittals requested  10/26/1998 FAIL
CORRECTIONS MAILED AND FAXED TO ARCHITECT. MLO
Routing - PUBLIC WORKS10/8/1998 10/9/1998 PASS
Plan assigned to (MYS)10/2/1998 10/7/1998
DetailsMarlene Southard
Plan routing begun/TENANTS  10/7/1998
Route to PLANNING, PUBLIC WORKS, PLAN CHECK and FIRE.
Plans ACCEPTED BY PLAN TECH  10/5/1998 PASS
10-02-98 plans on hold waiting for vic. map 10-05-98 RECEIVED VIC. MAP ROUTED TO MARLENE
Application received  10/2/1998
Recd Pcfee & Taken To Pln CK  10/2/1998