Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD98-03034
StatusExpired
Name TAPAS MEDITERRANEAN BISTRO
Site Address 199 N CAPITOL BLVD Unit: 301
Project NameCAPITOL PLAZA-3RD FL
Customer Number 
ePlanReviewNo
Description
(TAPAS MEDITERRANEAN BISTRO - PHASE II EXPANSION) Fire sprinklers used to meet high-rise provisions. To expand a previously approved restaurant on the 3rd floor into an adjacent 2,125 square foot area. The 2-hr occupancy separation used to function as a horizontal exit located between the existing restaurant and the expansion area shall be maintained. Work includes interior nonbearing walls, floor finishes, mill work, and suspended ceilings all per approved drawings and plan review conditions on file. The allowable occupant load of the Banquet Room (88) shall be posted near the main exit from the room. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. PC-689-98 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Receive PAYMENT IN FULL  3/22/2000 DONE
(F) Reprint permit  1/24/2000 DONE
Fee Review-notes11/30/1998 1/24/2000 DONE
ADDITIONAL VALUE FROM SUBS...NOT FINALED YET....
INSP-Final Inspection1/28/19991/28/19991/28/1999PPASS
DetailsRick Jackson
occ approved for phase 2
INSP - Final1/27/19991/28/19991/28/1999APASS
Details
still need main remodel final also this phase made ok
INSP-Final Inspection1/24/19991/25/19991/25/1999AFAIL
DetailsRick Jackson
HAROLD WILL CALL...###-#### air balance report and install extinguisher
SUPER- Supervisor's review1/5/19991/5/19991/5/1999
fire test completed. hardware changed on entry doors, exit signs ok. penitrations sealed. ready for temp occ. gs
SUPER- Supervisor's review1/4/19991/4/19991/4/1999
did not get work done. no temp failed
Issue PAID IN FULL permit  11/6/1998
Plan Reviewer's activity  11/4/1998 PASS
Drawings approved after resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  11/4/1998 PASS
Inspection Record Card- Bld  11/4/1998
Print Occupancy Form  11/4/1998
Print permit w/o conditions  11/4/1998
testing condition printout  11/4/1998
Plan assigned to (CJW)10/7/1998 11/4/1998 PASS
DetailsCarl Westfall
11/04/98 10:14:57 CJW - this action updated by action script from <<>> in Case No. BLD98-3034
Routing - PLAN CHECK10/28/1998 11/4/1998 PASS
Plan resubmittals received  10/29/1998
RECEIVED TWO COPIES OF REVISED SHEETS A2.01 ROUTED TO CARL W. KMM
Routing - FIRE10/23/1998 10/28/1998 PASS
Plan Review Completed(1st rev)  10/28/1998 PASS
Routing - PLAN CHECK10/21/1998 10/23/1998
Plan Reviewer's activity  10/22/1998
UBC plan review started October 22, 1998 and finished October 23, 1998. A response is required from the Architect. See the conditions list.
Routing - PLUMBING10/19/1998 10/20/1998 PASS
Routing - PUBLIC WORKS10/15/1998 10/19/1998 PASS
Routing Off Site - C.D.H10/9/1998 10/14/1998 PASS
GAVE PLANS TO CAROL J. WHEN SHE CAME IN.
Plan assigned to (MYS)10/5/1998 10/7/1998
DetailsMarlene Southard
Plan routing begun/TENANTS10/7/1998 10/7/1998
Route to CENTRAL DISTRICT HEALTH, PUBLIC WORKS, PLUMBING, PLAN CHECK and FIRE.
Recd Pcfee & Taken To Pln CK  10/5/1998
Application received  10/5/1998