DOC - L/C Approved | 7/16/1999 | 7/16/1999 | 7/16/1999 | | PASS |
Russ Owen
|
|
|
letter from glass company,temp glass replaced at rear slider on 7/26/99,also 2 rooms which were crawl spaces have slabs poured and will nee to have some insulation at the floor joist lie of basement area. I have been told by Eric of Siedel homes this will be done need lc,for loan etc.
|
INSP - Final | 7/16/1999 | 7/16/1999 | 7/16/1999 | A | PASS |
Russ Owen
|
|
|
see notes on lc.
|
INSP - Framing/Rough-in | 7/16/1999 | 7/16/1999 | 7/16/1999 | | PASS |
Russ Owen
|
|
|
/ / 407 - WINDOW WILL BE REPLACED AT ON JULY 26TH,PER LETTER,ALSO
|
INSP - Final | 7/15/1999 | 7/15/1999 | 7/15/1999 | P | FAIL |
Russ Owen
|
|
|
07/15/99 407 - John ###-####
|
INSP - Final | 7/14/1999 | 7/14/1999 | 7/14/1999 | P | NR |
Russ Owen
|
|
|
07/14/99 407 - need drainage first.
|
INSP - Final | 7/12/1999 | 7/12/1999 | 7/12/1999 | P | FAIL |
Russ Owen
|
|
|
07/12/99 407 - not ready.
|
INSP - Framing/Rough-in | 5/25/1999 | 5/25/1999 | 5/25/1999 | | PASS |
Russ Owen
|
|
|
/ / 407 -
|
INSP - Energy code compliance | 5/24/1999 | 5/25/1999 | 5/25/1999 | P | PASS |
Russ Owen
|
|
|
05/25/99 407 - John ###-####
|
INSP - Framing/Rough-in | 5/21/1999 | 5/24/1999 | 5/24/1999 | P | PART |
Russ Owen
|
|
|
05/24/99 407 - ok to insulate 1 coorection left.
|
INSP - Framing/Rough-in | 5/18/1999 | 5/19/1999 | 5/19/1999 | A | FAIL |
Russ Owen
|
|
|
05/19/99 407 - left corrections.;
|
INSP - Framing/Rough-in | 5/18/1999 | 5/18/1999 | 5/18/1999 | | CANC |
Russ Owen
|
|
|
05/18/99 407 - cancell.
|
INSP - Framing/Rough-in | 5/18/1999 | 5/18/1999 | 5/18/1999 | | CANC |
Russ Owen
|
|
|
05/18/99 407 - cancell.
|
INSP - Framing/Rough-in | 5/17/1999 | 5/17/1999 | 5/17/1999 | P | PASS |
Russ Owen
|
|
|
05/17/99 407 - letter from engineer ok to side.
|
INSP - Framing/Rough-in | 5/14/1999 | 5/14/1999 | 5/14/1999 | P | FAIL |
Russ Owen
|
|
|
05/14/99 407 - NEED LETTER FROM ENGINEER.
|
INSP - Framing/Rough-in | 4/29/1999 | 4/30/1999 | 4/30/1999 | A | FAIL |
Russ Owen
|
|
|
04/30/99 407 - need engineer to ok engineered features. a written prior
|
INSP - Framing/Rough-in | 4/23/1999 | 4/26/1999 | 4/27/1999 | A | FAIL |
Russ Owen
|
|
|
04/26/99 407 - problems have engineer out to,ok engineered features.
|
INSP - Foundation | 2/12/1999 | 2/16/1999 | 2/16/1999 | A | PASS |
Russ Owen
|
|
|
02/16/99 407 - ###-#### john
|
INSP - Foundation | 2/5/1999 | 2/8/1999 | 2/8/1999 | P | PASS |
Russ Owen
|
|
|
02/08/99 407 - footings ok. also letter from soils ok.
|
Issue PAID IN FULL permit | | | 1/22/1999 | | |
|
|
|
|
Plan assigned to (DJO) | 10/5/1998 | | 1/21/1999 | | PASS |
Dan Overy
|
|
|
01/21/99 10:09:39 DJO - this action updated by action script from <<>> in Case No. BLD98-3044
|
Telephone call | | | 1/21/1999 | | |
|
|
|
called permit ready
|
Inspection Record Card- Bld | | | 1/21/1999 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 1/21/1999 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/21/1999 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 1/21/1999 | | PASS |
|
|
|
all items addressed.
|
Plan resubmittals received | | | 1/8/1999 | | PEND |
|
|
|
these people are waisting everyones time. resubmittals do not address what previously was gone over with myself, the designer and general contractor. marked set with punch list was given to cont/design. along with conference where exact problem areas were identified and talked about.
|
Plan Reviewer's activity | | | 12/9/1998 | | PEND |
|
|
|
plans are rejected. two revised sets to be submitted indicating all brace wall panel locations and engineering for all walls not meeting standard bracing. nothing indicated for bracing at all. beams/headers/girders not called out or sized.
|
Office Staff conference/action | | | 12/9/1998 | | PEND |
|
|
|
SEIDL CAME IN AND TOOK PLANS TO CORRECT.
|
Plans ACCEPTED BY PLAN CHECK | | | 12/9/1998 | | PEND |
|
|
|
|
Routing - PLANNING | 12/4/1998 | | 12/4/1998 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 12/3/1998 | | 12/3/1998 | | PASS |
Rita DeYoung
|
|
|
|
Routing - PUBLIC WORKS GRADING | 10/29/1998 | | 10/29/1998 | | PEND |
Rita DeYoung
|
|
|
Conference with John Seidl and homeowner to discuss grading restrictions behind house.
|
Routing - PUBLIC WORKS | 10/6/1998 | | 10/27/1998 | | PASS |
|
|
|
front desk corrected address and parcel # came back to public works addressing.pe
|
Routing - PUBLIC WORKS GRADING | 10/12/1998 | | 10/12/1998 | | FAIL |
Rita DeYoung
|
|
|
Plans indicate patio behind house which will violate restriction on fill of more than 3 feet. Notified John Seidl.
|
Routing - PUBLIC WORKS | 10/5/1998 | | 10/6/1998 | | FAIL |
|
|
|
called left message site plan and plans do not match lot 5. took back to front desk.
|
Application received | | | 10/5/1998 | | |
|
|
|
|
Routing - PLAN CHECK | 12/4/1998 | | | | PEND |
|
|
|
|