DOC - L/C Approved | 7/28/1999 | 7/28/1999 | 7/28/1999 | | PASS |
Russ Owen
|
|
|
/ / 407 - NOTE:CONTRACTROR IS WORKING ON FINE GRAE AT RIGHT SIDE FRONT
|
INSP - Final | 7/27/1999 | 7/28/1999 | 7/28/1999 | P | PASS |
Russ Owen
|
|
|
07/28/99 407 - FINAL please call prior to coming Matt ###-####
|
INSP - Final | 7/26/1999 | 7/27/1999 | 7/27/1999 | A | FAIL |
Russ Owen
|
|
|
07/27/99 407 - MATT ###-####
|
INSP - Energy code compliance | 3/3/1999 | 3/5/1999 | 3/5/1999 | A | PASS |
Russ Owen
|
|
|
03/05/99 407 - ###-#### CALL FIRST MATT
|
INSP - Final | 3/2/1999 | 3/3/1999 | 3/3/1999 | A | FAIL |
Russ Owen
|
|
|
THIS IS FRAMING INSPECTION NOT A FINAL.
|
INSP - Final | 3/3/1999 | 3/3/1999 | 3/3/1999 | | FAIL |
Russ Owen
|
|
|
03/03/99 407 - framing inspection,left corrections.i
|
INSP - Framing/Rough-in | 3/1/1999 | 3/1/1999 | 3/1/1999 | P | FAIL |
Russ Owen
|
|
|
03/01/99 407 - has corrections and needs truss calcs.
|
INSP - Concrete | 1/7/1999 | 1/7/1999 | 1/7/1999 | P | PART |
Russ Owen
|
|
|
01/07/99 407 - ok except per contractor engineer will allow some holdown
|
INSP - Framing/Rough-in | 1/7/1999 | 1/7/1999 | 1/7/1999 | P | CANC |
Russ Owen
|
|
|
01/07/99 407 - wrong inspection caled in.
|
INSP - Foundation | 1/6/1999 | 1/6/1999 | 1/6/1999 | P | PART |
Russ Owen
|
|
|
01/06/99 407 - footings only at this time. told them to call for wall in
|
Issue PAID IN FULL permit | | | 1/6/1999 | | |
|
|
|
|
Telephone call | | | 12/22/1998 | | |
|
|
|
NO PHONE NUMBER
|
Inspection Record Card- Bld | | | 12/22/1998 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 12/21/1998 | | |
|
|
|
|
Plan resubmittals received | | | 12/21/1998 | | |
|
|
|
lateral design engineering
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/21/1998 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 10/7/1998 | | 12/21/1998 | | PASS |
|
|
|
need engineered lateral load design. Voice message left w/ applicant 9:30 am 10/21/98. Design recieved 12/21/98.
|
Plan assigned to (ADS) | 10/19/1998 | | 12/21/1998 | | PASS |
|
|
|
12/21/98 11:52:18 ADS - this action updated by action script from <<>> in Case No. BLD98-3051
|
Meeting | | | 11/4/1998 | | FAIL |
|
|
|
Meet w/ Mr.Holmes. Ask for lateral design for rear wall. He took the plans. 1:52pm
|
Plan assigned to (DJO) | 10/6/1998 | | 10/19/1998 | | PEND |
Dan Overy
|
|
|
|
Routing - PLANNING | 10/6/1998 | | 10/7/1998 | | PASS |
|
|
|
|
Application received | | | 10/6/1998 | | |
|
|
|
|
Routing - PUBLIC WORKS | 10/6/1998 | | 10/6/1998 | | PASS |
|
|
|
|